Open company graph database — free web & API
ログイン

Beroa Technology Group GmbH

銘柄コード
—
上場市場
—
国
Germany
従業員(単独)
—
関連会社
0
§01

基本情報

BASIC
所在地
Breitscheider Weg 34, 40885 Lintorf, Germany出典
社長
出典
従業員数(単独)
従業員数(連結)
開始日
終了日
§02

サイト

1 DOMAINS
§03

事業内容

30
Premium refrigerant gases出典Refrigeration equipment出典HVAC solutions出典Automotive cooling solutions出典Industrial cooling solutions出典Residential Air Conditioning出典Commercial HVAC Systems出典Commercial Refrigeration出典Cold Storage Facilities出典Industrial Cooling出典Food Processing Plants出典Automotive Air Conditioning出典Refrigeration Equipment Distribution出典Facility Maintenance出典Manufacturing Industries出典Maxron出典Refron出典Refillable Refrigerant Gases出典Wholesale of agro products出典Supply of disposable refrigerant gases出典Supply of refillable refrigerant gases出典Supply of Eliwell products出典Supply of Maxron products出典Supply of Refron products出典agro products wholesale出典disposable refrigerant gases supply出典Quality Assurance出典Blog出典Contact Us出典All Products出典
§04

関連会社

0 COMPANIES

—

§05

関連図

NETWORK
ドラッグで移動 · クリックで詳細へ
§06

沿革

4 EVENTS

Why does 2027 matter more than 2025? Because the 2025 bans affected only single splits under 3 kg charge, a narrow slice of the market. The 2027 bans catch everything up to 12 kW, which covers the majority of residential AC and small commercial installations across Europe.出典

January 2029: Hermetically sealed commercial refrigeration and freezing equipment must use refrigerants with GWP below 150. This catches the remaining commercial equipment categories that weren’t covered by the 2022 and 2025 bans. Hermetic compressor manufacturers have largely shifted to R-290 and R-600a (isobutane) already, but this date makes it mandatory.出典

January 2030: The quota cliff arrives. Virgin HFC supply shrinks to one-twentieth of the 2015 level. For context, the EU HFC market was 82.3 Mt CO₂-eq in 2023. By 2030, the entire annual quota is approximately 9 Mt. The recycled and reclaimed market isn’t optional anymore. It becomes the primary supply channel.出典

January 2032: The servicing GWP threshold for AC and heat pump equipment drops from 2,500 to 750. This is the date that finally ends virgin R-410A servicing. With a GWP of 1,924, R-410A clears the current 2,500 threshold comfortably. But it can’t clear 750. From 2032, even servicing an existing R-410A system with virgin gas becomes illegal. Recycled and reclaimed R-410A remains exempt under Article 8.出典

§07

ニュース

0 ARTICLES

ニュースはありません。

§09

出典・更新

SOURCES
↑