Wind Energy Holding Co., Ltd.
- 所在地
- 87/1 25 th Floor, Capital Tower, All Seasons Place, Wireless Road, Lumpini, Pathumwan, Bangkok 10330 Thailand
- 社長
- 従業員数(単独)
- 従業員数(連結)
- 開始日
- 終了日
サイト
事業内容
関連会社
—
関連図
沿革
Successfully achieved Commercial Operation Date (COD) for the “West Huaybong 3” (FKW) Wind Power Project with an installed capacity of 103.5 megawatts—marking the first utility-scale wind power plant in Thailand, located in Dan Khun Thot District, Nakhon Ratchasima Province.![]()
The “West Huaybong 2” (KR2) Wind Power Project with an installed capacity of 103.5 megawatts commenced commercial operations and began feeding electricity into the grid.![]()
Successfully constructed, developed, and commercialized the “WTB” Wind Power Project with a capacity of 60 megawatts, officially connecting to the grid.![]()
Significant Breakthrough (2018): Achieved a major milestone for both the organization and Thailand’s wind energy industry through the successful construction, development, and Commercial Operation Date (COD) commencement of 4 wind power projects with a total installed capacity of 360 megawatts: T1 Wind Power Plant (Capacity: 90 MW)![]()
ニュース
ニュースはありません。