Request Regarding the Rate of Change of Output of Energy Storage Systems
In recent years, with the proliferation of energy storage systems for the grid, concerns have arisen about the impact of steep output changes on distribution systems. Chubu Electric Power Grid requests that the rate of change of PCS output be set to 0%–100% (or the reverse) of rated output over a period of at least 5 seconds, and that step changes be limited to 10% or less. These settings apply to both charging and discharging, and it is necessary to confirm at the time of contract whether the PCS can accommodate them.