高エネルギー加速器研究機構
Japan
コンテンツ配信サービス
科学解説サービス
教育コンテンツ提供
茨城県つくば市
xxxxx
Company name
Group Parent Subsidiary Customer Supplier Alliance Bank Shareholder
Inter-University Research Institutes Corporations
Group company Parent Subsidiary Customer Supplier Alliance Bank, lending and credit Investment, equity and shareholders

50 entries
DateDescription
1954 Formation of a working group for the foundation of an institute for nuclear study.
1955 The Institute of Nuclear Study (INS) was established.
1957-09 Sep:FF cyclotron was completed.
1958-05 May:FM cyclotron was completed.
1958-06 Jun:The first experiment with the FF cyclotron took place.
1960-10 Oct:The first experiment with the FM cyclotron took place.
1961-12 Dec:The Electron Synchrotron (ES) accelerated an electron beam to 750 MeV.
1963-04 Apr:The first experiment with the ES took place.
1964-04 Apr:Formation of a working group for the foundation of a new research institute for elementary particle physics.
1966-03 Mar:The ES produced a 1.3 GeV beam.
1971-04 Apr:National Laboratory for High Energy Physics (KEK) was established.
1976-03 Mar:The proton synchrotron (PS) produced an 8 GeV beam as designed.
1976-12 Dec:The PS achieved 12 GeV.
1977-05 May:The first PS experiment took place.
1977-12 Dec:Experiments with the SF cyclotron began.
1978 The Booster Synchrotron Utilization Facility and a Photon Factory (PF) were founded.
1978 The Meson Science Facility was established.
1980-07 Jul:Experiments in the Booster Synchrotron Utilization Facility began.
1982-03 Mar:The PF succeeded in storing a 2.5 GeV electron beam.
1983-06 Jun:PF Experiments began.
1984-07 Jul:The TRISTAN Accumulation Ring (AR) accelerated an electron beam to 6.5 GeV.
1985-10 Oct:The AR accelerated a positron beam to 5 GeV.
1986-11 Nov:The TRISTAN Main Ring (MR) accelerated both electron and positron beams to 25.5 GeV.
1987-05 May:TRISTAN experiments began.
1988-04 Apr:The Meson Science Facility was reorganized as a Laboratory (MSL).
1988-11 Nov:The MR energy was upgraded to 30 GeV with the help of superconducting accelerating cavities.
1989-09 Sep:First electron cooling by TARNII.
1993-03 Mar:Isotope Separator On-Line (ISOL) was completed.
1994-06 Jun:KEKB B-factory construction began.
1995-12 Dec:TRISTAN experiments finished.
1997 The High Energy Accelerator Research Organization was established.
1998 First beam storage at KEKB (KEK B-factory) ring.
1999-04 The Department of Particle and Nuclear Science was founded in the Graduate University for Advanced Studies.
1999-05 The Long-baseline Neutrino Oscillation experiment (K2K) began.
1999-06 The Belle experiment at the KEK B-factory began operation.
2000 Tanashi Branch closed
2001 Construction of High Intensity Proton Accelerators (J-PARC) started
2004-04 Became the Inter-University Research Institute Corporation High Energy Accelerator Research Organization.
2004-11 K2K experiment ended
2005-04 Tokai Campus was opened.
2005-12 Experiments at PS ended.
2006-02 J-PARC Center was established.
2006-03 Experiments at BSF ended.
2007-01 181MeV proton beam at J-PARC Linac
2007-10 3 GeV proton beam at J-PARC Rapid Cycling Synchrotron (RCS)
2008-10 Prof. Makoto Kobayashi, former director of IPNS, won the 2008 Nobel Prize in Physics.
2009-03 J-PARC construction was completed.
2010-06 The Belle experiment ended
2011 Construction of the SuperKEKB started
2016 Phase 1 operation of the SuperKEKB started
+ Loaded when opened
2026-09-21 18:02 (Model: gpt-4.1-nano )
↑