Open company graph database — free web & API
Login

Osaka Gakugei School Corporation

学校法人 大阪学芸
Ticker
—
Listed market
—
Country
Japan
Employees (non-consolidated)
—
Related companies
0
§01

Basic information

BASIC
Head office
Chief executive
Capital
Employees (non-consolidated)
Employees (consolidated)
Start date
End date
§02

Websites

1 DOMAINS
§03

Business

5
High School OperationJunior High School OperationHigh School EducationJunior High School EducationEnglish Education
§04

Related companies

0 COMPANIES

—

§05

Network

NETWORK
Drag to move · click to open
§06

History

8 EVENTS

The 'Science Lab' has been completed!Sources

A kids' space has been installed inside the library.Sources

The West Building toilets and the reception room on the first floor of the main building have been renovated!Sources

Visited the grave on the anniversary of the school's founder.Sources

Concluded a high school-university collaboration agreement with Osaka Institute of Technology.Sources

Held the 120th Anniversary Ceremony of the School's Founding.Sources

Support private high schools through hometown tax donation! About Osaka Education Dream Fund.Sources

Notice of English instructor recruitment for the 2026 academic year.Sources

§07

News

16 ARTICLES

Urgent Recruitment: English Teacher Position for FY2026Sources

Osaka Gakugei High School and its affiliated junior high school are seeking full-time or part-time English teachers. Applicants must hold a teaching license for junior high or high school. Applications are accepted by mail or in person, and only candidates who pass the document screening will be contacted.

Osaka Gakugei School Corporation Establishes Basic Policy on Customer HarassmentSources

Osaka Gakugei School Corporation announced that it has established a basic policy addressing customer harassment. Click the link for details.

North Building Courtyard Artificial Turf Replacement CompletedSources

Renovated the artificial turf in the North Building courtyard and finished it beautifully. Students can now refresh themselves in the courtyard during break time.

Measures to Prevent Novel Coronavirus InfectionSources

Our school has been implementing measures to prevent the spread of the novel coronavirus since June 1, 2020, when operations resumed. Specifically, temperature measurement with thermography at each building entrance, replacing classroom air conditioner filters with virus-removal filters, teachers wearing face shields during classes, installing ultrasonic nebulizers in staff and administrative offices, placing antibacterial mats at each building entrance, and installing Clean+Gate at the main entrance. These measures aim to alleviate concerns of students, parents, and school stakeholders and to continue infection prevention efforts.

Promotion of the Act on Promotion of Measures for the Development of Next-Generation Human ResourcesSources

Osaka Gakugei has formulated an action plan for general business owners based on the Act on Promotion of Measures for the Development of Next-Generation Human Resources. Details are provided at the linked site.

Disinfection of Cafeteria and KitchenSources

Our school has resumed cafeteria operations from June 15, 2020, and disinfected the cafeteria and kitchen on the basement first floor of the main building on June 10. Since many students and staff use these facilities, we will continue to implement infection prevention measures.

Renovation of stairs on floors 1 to 7 and flooring on floors 3 to 7 has been completedSources

The stairs on floors 1 to 7 of the main building and the corridor floors on floors 3 to 7 were replaced during summer vacation, resulting in a bright design. Two similar colors were used, with each floor having a different color, making the corridors and stairs brighter.

Science LabSources

As part of the renovation of the Hyakushu Memorial Hall at Osaka Gakugei, the Science Laboratory Building 'Science Lab' has been completed. It consists of a visual and auditory room on the first floor, a biology laboratory on the second floor, and a chemistry laboratory on the third floor, featuring an open layout with glass walls. A large aquarium has been installed in the entrance hall on the first floor, allowing visitors to observe seawater fish.

Installed a Kids' Space in the LibrarySources

Our school has installed a kids' space in the library. This allows staff to come to work with children during sudden closures or school cancellations, enhancing confidence in educational activities. Librarians and staff will watch over the children during class hours.

Renovation of West Building Restroom and Main Building 1st Floor Reception RoomSources

Utilizing summer vacation, we renovated the men's and women's restrooms in the West Building (floors 1 to 3) and the reception room on the 1st floor of the main building. Bright and comfortable with wood-grain partition walls and LED lighting. The reception room has been expanded from the previous number of rooms to five. The calm atmosphere of wooden doors is planned to be used for guest reception and meetings.

§09

Sources & updates

SOURCES
↑