Names without a link are companies not yet registered in OpenBizGraph
§05
Network
NETWORK
Loading the relationship graph...
Drag to move · click to open
§06
History
284 EVENTS
In Keichō 17, Nagoya Castle's main keep was completed.
The history of Kitagawa Group began when ancestor Tsumoya Kizame Mon (Tsumoya Kizame Mon) started a metal goods business in Nagoya's Egawa-cho, beginning the Tsumoya.
Founded on October 1, 1872 (Meiji 5)
Meiji 21 to Showa 14, moved the barracks of the 6th Company, 1st Battalion, 3rd Infantry Division of the Army to Meijimura
Fountain Tower at Tsuru-Mae Park (existing) – Meiji 43rd year
Concert Hall at Tsuru-Mae Park – Meiji 43rd year
Meiji 43, 10th Kansai Prefecture Joint Progress Association Venue Floor Plan
Showa 3: New construction of five sites including the Great Memorial Gate, Yanagibashi, Myodo Bridge, and front of Nagoya Castle in front of Nagoya Station and Honmachi Street.
Showa 3: Main gate large arch.
Taisho 9–Showa 3, Kakamigahara Air Group Officer Assembly Hall (now JGSDF Gifu Base Public Relations Office)
Taisho 9–Showa 3, Kakamigahara Air Group Aircraft Hangar
Taisho 9–Showa 3, Kakamigahara Air Group Supply Warehouse
Meiji 21–Showa 14, Army 3rd Division
Showa 2–14, Army Armory Highzō Manufacturing Plant
Showa 2–14: Army Arsenal Atsuta Manufacturing Plant (now Nakayama Warehouse Co., Ltd.)
Meiji 21–Showa 14: Army Arsenal Takazō Manufacturing Plant & Atsuta Manufacturing Plant site (Geospatial Information Authority)
Showa 2–Showa 14: Nagoya Army Atsuta Factory
Showa 6: Army Nagoya Kaigyōsha Renovation
Meiji 21–Showa 14: Army Arsenal Takazō Manufacturing Plant & Atsuta Manufacturing Plant site (Geospatial Information Authority)
Taisho 11, Meino Army Flying School Construction Site
Established on March 20, 1922, as Kitagawa Group Co., Ltd.
Taisho 12–Showa 38, Meino Army Flying School Museum (now JGSDF Meino Garrison)
Showa 13–17: Suzuka Naval Air Squadron (Geospatial Information Authority)
Kitagawa Yoshiyoshi founded the company.
Kitagawa Usaburo learned bricklaying techniques from a British engineer and worked on the construction of the new building of the Western Branch of the Bank of Japan.
During Showa 15, military facilities involved by the Kitagawa Group
Nagoya Castle Various Repair Works
Japan Power Co., Ltd. Nagoya Substation Repair External Work
Nai Gai Spinning Co., Ltd. Jindou Expansion Other Construction
Nagoya City Haba Elementary School New Building Construction
Showa 9: Iwakura Test Battery Plant New Construction
Showa 9: Iwakura Test Battery Plant New Construction Dry Powder Storage
Showa 9: Iwakura Test Battery Plant New Construction 6‑Story Weather Observation Tower
Seto Post Office Telephone Extension New Building Construction
Nagoya Spinning Co., Ltd. Recreation Room Renovation Other Construction
Army Nagoya Factory Oil Depot New Construction Other Construction
Wakayama Hospital New Construction
Army Technical Headquarters Irako Test Range Gun Factory New Construction Other Construction
Nagoya Regional Monopoly Bureau Emergency Staircase New Installation Other Construction
Nagoya Castle Various Repairs Construction
Fuma Store Warehouse New Construction
Toyo Spinning Co., Ltd. Aichi Factory Repair Other Construction
Nagoya City Electric Bureau Track Rehabilitation Other Construction
Aichi Prefecture Spinning Co., Ltd. Warehouse New Construction
Nagoya City Haba Elementary School Auditorium New Construction
Aichi Prefecture Seto Porcelain Industry Association Exhibition Hall New Construction
Japan Power Co., Ltd. Nagoya Substation Expansion Construction
Nai Gai Spinning Co., Ltd. Jindou Expansion Construction
Kofun An Renovation Construction
Umi-kan New Construction
Nagoya City Electric Bureau Sawagami Car Shed Renovation Construction
Aichi Prefectural Mental Hospital New Construction
Nagoya City Gokaku Elementary School New Construction
Miyukimori Textile Co., Ltd. Factory Expansion and Other Works
Renovation work at various parts of Nagoya Castle, the plum corridor inside the palace, the hot spring pavilion, and the lacquered plaster wall on the same side
Nagoya Regional Monopoly Bureau Entrance Supplementary Expansion and Other Works
Nagoya City Eight-Do Crematorium (Eight-Do Funeral Hall) Renovation
Sugino Textile Co., Ltd. Factory New Construction and Other Works
Army Kakamigahara Air Group Second Battalion Equipment Storage Expansion and Other Works
Nagoya Regional Monopoly Bureau Hikone Branch Cafeteria Expansion and Other Works
Nagoya Textile Co., Ltd. Factory Ceiling Replacement and Other Works
Nagoya Holy Spirit Service Hall Expansion
Mie Prefectural Agricultural and Forestry High School Sericulture Room New Construction
Army Kakamigahara Air Group Various Units Wind Damage Restoration
Aichi Prefecture Seto Porcelain Industry Association Warehouse Expansion
Nagoya City Electric Bureau Takatsu Garage Expansion
Nagoya City Toyoda Elementary School Temporary Classroom New Construction
Army Kakamigahara Air Group First Flight Group Headquarters New Construction
Army Ministry Toyohashi Temporary Supplementary Horse Stable New Construction
Nagoya Castle Repairs and Other Works, South‑East Corner of the Main Keep 4th Floor Stucco Peeling, South‑East Corner of the Main Keep 2nd Floor Stucco Peeling, South‑East Corner of the Small Keep 2nd Floor Stucco Peeling
Toyo Textile Co., Ltd. Aichi Factory Laundry Relocation and Other Works
Nagoya City Shiratori Elementary School Renovation
Japan Electric Power Co., Ltd. General Construction
Nagoya Spinning Co., Ltd. General Construction
Nagoya Telephone Relay Station New Construction
Second Shinjō High School New Construction
Nagoya Local Monopoly Bureau General Construction
Army Third Division Heavy Artillery Third Battalion Reconstruction
Sugino Spinning New Construction
Ibuki Mountain Summit Weather Station New Construction
Aichi Spinning Co., Ltd. New Construction
Ichinomiya City Ichinomiya Third Elementary School New Construction
Nagoya Factory Repair Work
Army Third Division Field Artillery Third Battalion Interior Renovation
Mie Prefecture Agriculture and Forestry School New Establishment
Showa 12, Nagoya Pan-Pacific Peace Expo Layout Diagram
Showa 12, Concert Hall (Floor Plan, Front View, Side View, Layout Diagram)
Showa 12, Entertainment Hall (Floor Plan, Front View, Side View)
Showa 12, History Hall (Floor Plan, Front View)
Reconstruction work at Asagami (Sengen) Shrine
Okazaki Post Office New Construction
Higashiyama Zoo relocation work
Tokyo Imperial University Exercise Forest Office New Construction
New greenhouse construction at Higashiyama Park
Nagoya Local Monopoly Bureau Repair Work
Pan-Pacific Peace Exposition Aichi Nagoya Hall New Establishment
New construction at Motohira Hara
Army Third Division Signal Corps New Construction
Iijima Telephone Relay Station New Construction
Nippon Porcelain Co., Ltd. Headquarters Factory Related General Construction
Nagoya City Nagoya Castle Honmaru Palace Renovation Project
Restoration and surveying work of the main palace
Toyobo Co., Ltd. Reconstruction Other Works
North Branch Incident Temporary Construction Site Project
Seto Post Office New Construction Project
Oshima Residence New Construction Project
Other works for new installation of ancient animal models at Higashiyama Zoo
Army 3rd Division Heavy Equipment 3rd Battalion Expansion Project
Toyobo Co., Ltd. Various Works
North Branch Incident Temporary Construction Project
Nagoya City Nagoya Castle Various Works
Suzuki Residence New Construction Project
Nippon Porcelain Co., Ltd. Headquarters Factory Various Works
Army 3rd Division Army Hospital Renovation Project
Mechanical Training School New Construction Project
Iijima Telephone Relay Station Official Residence New Construction Project
Army 3rd Division Second Army Hospital New Construction Project
New construction of the office building at the Araragi telephone relay station
Nagoya Regional Monopoly Bureau Renovation Project
Japan Power Co., Ltd. Repair Works
Nitto Spinning Co., Ltd. Various Works
Navy Mie Prefecture Nagata Transmission Station New Construction Project and Others
Showa 15, former hangar inside the training center of the Suzuka Naval Air Unit
Central Manufacturing Plant Relocation Other Works
Army Nagoya Factory 3rd Plant Expansion and Other Construction
Yarozu Temple Reconstruction
First Suzuka Naval Air Squadron New Construction and Other Works
Nagoya Post Office Modification and Other Works
Nagoya Local Monopoly Bureau Repairs at Various Locations
Nagoya Factory 4th Plant Expansion and Other Works
Nagoya City Nagoya Castle Repairs at Various Locations
Nippon Porcelain Co., Ltd. Headquarters Factory Repairs at Various Locations
Toyo Spinning Co., Ltd. New Establishment and Other Works
Nagoya Municipal Sakae Elementary School Expansion
Nagoya Naval Meeting Hall New Construction and Other Works
Nagoya Army Armory Factory Takazō Manufacturing Plant 633 New Construction
Nagoya Simple Insurance Branch Repairs and Other Works
Nagoya Cotton Yarn Exchange Repairs
Other new construction works at Koku-Myojin Shrine
Yokkaichi Accommodation New Construction
Toyokawa Naval Factory 2nd A Plant (Dormitory) New Construction
Second generation, Kitagawa Kōyoshi (Seitarō), inherited the business (exact date unknown, estimated)
Okuma Ironworks Research Institute New Construction
Telegraph Purchasing Office New Construction
Nagoya Municipal Ozone Elementary School New Construction
Nagoya Municipal Hibiya Elementary School New Construction
Nagoya Municipal Second High School Girls' School New Construction
Toyobo Co., Ltd. Various Works
Nippon Porcelain Co., Ltd. Headquarters Factory Various Works
Naval-Related Works, First Suzuka Naval Hangar New Construction
Opened branch office in Toyohashi and Toyokawa in March 1939 (Showa 14)
Showa 16, Army 3rd Division Official Street
Showa 14: Nagoya Naval Office
During Showa 15, military facilities involved by the Kitagawa Group
Showa 16–18: Suzuka Naval Factory (Geospatial Information Authority)
January 4, 1941, opening of the Shiroishi Branch Office
Established in March 1922 (Taisho 11), Hokugawa Group Co., Ltd.
Opened branch office in Uji Yamada in March 1940 (Showa 15)
April 1950, third generation, Kitagawa Shōichi became president
Showa 16–18: Ōi Naval Air Squadron (Geospatial Information Authority)
Showa 17: Kawawa Air Squadron
Showa 14–20: Toyokawa Naval Factory (Geospatial Information Authority)
Showa 17: Toyokawa Naval Factory Officer Assembly Hall
Showa 17: Toyokawa Naval Factory "Contract Work Records"
Showa 17–20: Okazaki Air Squadron (Geospatial Information Authority)
In Showa 20, the company undertook renovation and reconstruction work as the garden guard of Nagoya Castle.
December 1945, headquarters relocation to 106 Ushi-jima-cho, Nishi-ku, Nagoya
Showa 20: Sagami Air Squadron Inagaki Barracks
Showa 22 (1947) Emergency Repair of the Former Toyokawa Naval Factory
Showa 22, restoration of Toyokawa City Hall, related work in Toyohashi, removal and transport of compensation facilities, restoration of Okazaki Higher Normal School building, relocation of Hirano factory of Maruzen Sangyo Co., repair of the southern Toyokawa substation of Chubu Power Distribution Co., relocation and expansion of the school building of Gamo Agricultural High School, other classroom restoration at Okazaki Higher Normal School, relocation of the office of Toyokawa Horticultural Association and other works
Showa 22, Ministry of Transport facility work, railway facility restoration, new construction of the office building at Takachaya Station and other works, relocation of the city planning office of Yokkaichi, restoration of the Hakama Line bridge at Yokkaichi Station, new construction of the office of the Kameyama Machinery Works, restoration of the passenger platform at Yokkaichi Station after the disaster, new construction of the communication office at Zetsu, and new residential housing
Showa 22 (1947) Reconstruction of Yokkaichi City Hospital
Showa 22 (1947) Reconstruction of Yokkaichi Plant of Nippon Fertilizer Co., Ltd.
Showa 22, various city planning works in Yokkaichi, restoration of the Hōrai Bridge and other works, other works at Kaiei Bridge, new road construction in Yokkaichi
Showa 22 (1947) Reconstruction of Yokkaichi Port and River Embankment
Showa 22 (1947) Cleanup of Yokkaichi War Damage Sites
Showa 22 (1947) Works Related to Oowaki Oil Co., Ltd.
Showa 22, housing department works in Mie Prefecture, redesign of Yokkaichi Police Station, disaster restoration of Yokkaichi Commercial High School, repair of the Shiohama Crematorium, expansion and renovation of Saikyo Middle School in Saikyo Village, redesign of the Yokkaichi Police Station dojo
Showa 22 (1947) Relocation of Yokkaichi Municipal Seventh Elementary School
Showa 22 (1947) Reconstruction of Mie Prefecture Tsukawa Industrial Test Site
Showa 22 (1947) Reconstruction of Spinning Room at Toyobo Shiohama Factory
Showa 22 (1947) Reconstruction of Packing Plant at Toyobo Shiohama Factory
Showa 22 (1947) Relocation and Renovation of Toyobo Futsukamachi Hospital
Showa 22 (1947) Repair of Hatsu Hospital in Mie Prefecture
Showa 22 (1947) Interior Renovation of Yokkaichi Post Office
Showa 22 (1947) Renovation of Kumazawa Refining Co., Ltd.
Showa 22 (1947) New Construction of Nagoya Monastery Nanowa Clinic
Showa 23 (1948) New Construction of Condominium Housing
Showa 23, expansion and other works at Nagoya Wool Industry Co., Ltd. factory
Showa 23 (1948) construction of new Lamatake Store Office
Showa 23 (1948) construction of new building for Ina Town Ina Middle School
Showa 23, redesign and other works at Almate Industrial Co., Ltd. factory
Showa 23, expansion and other works at Nippon Publishing Distribution Co., Ltd. warehouse
Showa 23 (1948) construction of new Nagoya Warehouse Co., Ltd. warehouse
Showa 23, new fence and other works at the Gifu plant of Aichi Electric Works (Inc.)
Showa 23 (1948) construction of new office for the Atochi Branch of the Agricultural Association
Showa 23 (1948) construction of new community center in Kamagori City, Kamagori Shrine
Showa 23, new residential building and other works at the southern Toyokawa substation of Chubu Power Distribution (Inc.)
Showa 23 (1948) relocation and construction of Yamamoto Textile Factory by the Daisan Textile Industry Cooperative
Showa 23 (1948) construction of new community center in Asouda, Toyokawa City
Showa 23 (1948) construction of new community center in Mutsumi, Toyokawa City
Showa 23 (1948) relocation and construction of canned goods factory by the Kamagori Agricultural Cooperative
Showa 23 (1948) construction of new building for Waku Middle School
Showa 23, expansion and other works at Yamada Fifth Middle School in Ujiya City
Showa 23 (1948) construction of new building for Tashimura Middle School
Showa 23 (1948) construction of new office for Yamada Fish Merchants Association
Showa 23, expansion works at Kirin Science Co., Ltd. factory
Showa 23 (1948) renovation of the residence at Tsujitei
Showa 23 (1948) renovation of military housing for the Special Procurement Agency
Showa 23 (1948) construction of new building for Tenmaei Middle School in Tenmaei Village
Showa 23 (1948) construction of new starch factory by Kawamura Chemical Co., Ltd.
Showa 23 (1948) restoration of the left bank river of Suzuka River in Mie Prefecture
Showa 23 (1948) restoration of facilities related to Kumazawa Refining Co., Ltd.
Showa 23 (1948) restoration of facilities related to Toyo Spinning Co., Ltd.
Showa 23 (1948) construction of facilities related to the Postal Bureau
Showa 23 (1948) Tawarashi Tawarano Middle School site preparation
Reconstruction of classrooms at Okazaki Normal School – Showa 23rd year
Showa 23 (1948) Central Economic Hall relocation construction
Showa 24 (1949) Gifu Automobile Office relocation construction
Showa 24 (1949) Miyaki Textile Factory expansion construction
Showa 24 (1949) Nagoya University clinical lecture room new construction
Showa 24 (1949) Mie Prefecture Shinshakuro road new construction
Showa 24 (1949) Fukue Town Fukue Middle School relocation construction
Showa 24 (1949) Nagoya Wood Industry Association Nagoya Wood Hall new construction
Showa 24 (1949) Residential subdivision new construction
Showa 24 (1949) Daiei Industrial Co., Ltd. sales office new construction
Showa 24 (1949) Special Procurement Agency compensation material removal and transport
Showa 24 (1949) Kuwana City Daisen Elementary School relocation construction
Showa 24 (1949) Funada Residence new construction
Showa 24 (1949) Tarōse Village Hall new construction
Showa 24 (1949) Construction of Fukuta Ironworks
Showa 24 (1949) Repair work at Kumazawa Refinery Co., Ltd.
Showa 24 (1949) Construction of Mie Prefecture Economic Office
Showa 24 (1949) Repair work at Mie Prefecture Suzuka Welfare Dormitory
Showa 24 (1949) Construction of evacuation passage for ground subsidence countermeasure at Nankai Local Ground
Showa 24 (1949) Removal of compensation materials at Toyokawa Plant, Special Procurement Office
Showa 24 (1949) Relocation of Chubu Economic Hall
Showa 24 (1949) Restoration of Takatsuki Factory, Aichi Electric Works Co., Ltd.
Showa 24 (1949) Renovation of Nagoya Post Office Building
Showa 24 (1949) Construction of Tajimi Junior High School, Tajimi City
Showa 24 (1949) Construction of Uji Yamada Branch Office, Food Corporation
1949, repair and other works at Nagoya Food Office
Showa 24 (1949) Construction of Kurehara Koji's Residence
Showa 24 (1949) Interior renovation of Isoyama Fisheries Processing Plant, Post Office
Showa 24 (1949) Reinforcement of women's dormitory and common room, Toyo Textile Mie Furukawa Cotton Factory
Showa 24 (1949) Conversion of classrooms and construction of toilets at Yokkaichi High School
1949, construction of new barracks for the Shiohama war disaster storage at Toyo Pulp and Paper
1949, construction of new steel-frame elevated tank tower and other works at Kumazawa Refinery Co., Ltd.
1949, construction of new steel doors at Mie Prefecture Hatsu Hospital
Showa 24 (1949) Road construction for Hamakai land consolidation
Expansion of the Mie transmission room at the National Police Headquarters, Mie – Showa 24th year
October 1959, registered as a comprehensive contractor with the Minister of Construction (No. 969)
The important cultural property of Nagoya Castle was completed (existing).
Repair work was carried out on Nagoya Castle's main keep, sub keep, main hall, etc. (from Taisho 9 to Showa 20 May 14).
In Showa 12, a theft incident of the gold carp float occurred, and the company was suspected.
Higashiyama Zoo and Botanical Garden opened (Showa 12).
The greenhouse of Higashiyama Zoo and Botanical Garden was built (Showa 11).
The animal building of Higashiyama Zoo and Botanical Garden was built (Showa 12 to Showa 13).
August 1960, established a first-class architect office, registered with the Governor of Aichi Prefecture (No. 49)
March 1957, the Yokkaichi branch office became the Yokkaichi branch
March 1956, headquarters relocation to 7-4 Komaba-cho, Mizuhō-ku, Nagoya
Construction of local industry facilities (Taisho 14 to Showa 18).
April 1966, the Kamagori branch office became the Kamagori branch; the Uji Yamada branch office became the Ise branch
Construction of public facilities (Taisho 12 to Showa 26).
August 1973, became a designated construction contractor (Permit No. 1511)
September 1973, establishment of the Housing Division
April 1977, increased capital to 60,000,000 yen
Construction of educational facilities (Taisho 11 to Showa 11).
Registered Monument 1986 (existing)
February 1982, fourth generation, Kitagawa Takashi became president
In Reiwa 4, the company celebrated its 150th anniversary of founding and 100th anniversary of establishment.
November 2000, fifth generation, Kitagawa Taka became president
Heisei 17: Management building of Nagoya City Pavilion.
Heisei 17, Cutout Lantern
Heisei 17, Panorama
September 2013, fourth generation, Kitagawa Takashi was reappointed president
October 2022, sixth generation, Kitagawa Naoko became president
§07
News
6 ARTICLES
Kitagawa-gumi Co., Ltd. Holds Safety Convention to Raise Safety Awareness
Kitagawa-gumi Co., Ltd. held its safety convention again in 2026. The theme was "Communication," and participants learned the importance of smooth communication on site. A report on the activities of the Safety Cooperation Association, awards and a raffle were also held, striving to create safe sites.
Kitagawa-gumi Co., Ltd. Employee Trip Held in Fuji and Hakone
A two-day, one-night employee trip touring the foot of Mt. Fuji in Shizuoka and Hakone in Kanagawa was held. Participants enjoyed trekking, sightseeing, hot springs and meals, deepening their usual interaction. On the second day they enjoyed Owakudani and the ropeway.
Kitagawa-gumi Co., Ltd. held an informal job offer ceremony for those scheduled to join in 2026 on October 22, 2025. Through the presentation of job offer certificates, greetings from the president and the senior managing director, and a social gathering, they deepened exchange.
Kitagawa-gumi Co., Ltd. Conducts In-House Training
Kitagawa-gumi Co., Ltd. held employee training at its head office and discussed the company's aims and points for improvement. It promoted cooperation and communication among employees and clarified future initiatives. It aims to improve the organization through regular training.
Transformed into a Spacious Office Through Wall Removal and Interior Renovation
The first floor of a former house was renovated into an office, with walls removed and interiors re-covered. Part of the garage was enlarged, and the positions of the toilet and washroom were also changed. The whole room became larger and was reborn as an open space.
Kitagawa-gumi Co., Ltd. Releases Construction Introduction Video of Its New Office Building
Kitagawa-gumi Co., Ltd. completed construction of its new three-story office building and introduces it in a video. The building adopts a steel structure and has excellent earthquake resistance. Interviews and the atmosphere of the building can also be seen in the video.
§08
Public records
GOV
National Tax Agency basic information2180001010029
Source: National Tax Agency Corporate Number Publication Site, basic three items
Trade name
株式会社北川組
Trade name (kana)
キタガワグミ
Name in English
Corporation type
301
Address
〒467-0807 愛知県名古屋市瑞穂区駒場町7丁目4番地
Postal code
4670807
Prefecture code
23
City code
108
Address outside Japan
Prefecture in English
City in English
Address outside Japan in English
Corporate number assignment date
2015-10-05
Update date
2018-10-02
Change date
2015-10-05
Registry closure date
Reason for registry closure
Successor corporate number
Details of the change
Latest record
1
Excluded from search
0
Processing type
01
Correction type
1
Trade name image ID
Address image ID
Sequence number
3517534
METI gBizINFO2180001010029
Source: gBizINFO (Ministry of Economy, Trade and Industry)