Construction of break-bulk cargo vesselsConstruction of chip transport vesselsConstruction of product tanker (oil product transport vessel)Construction of methanol transport vesselsConstruction of special vessels
Names without a link are companies not yet registered in OpenBizGraph
§05
Network
NETWORK
Loading the relationship graph...
Drag to move · click to open
§06
History
14 EVENTS
Iwakura Shipbuilding primarily handles the construction of medium-sized vessels among the projects ordered by Imabari Shipbuilding.
Since its establishment in 1971, the Shin-Kasado Dock has built up extensive shipbuilding knowledge and technology, making it strong in constructing various special vessels. The construction of product tankers, refrigerated vessels, methanol tankers, and chip carriers—special vessels requiring high precision—is a field that even emerging country shipbuilders cannot easily enter. Iwakura Shipbuilding continues to challenge this niche market with its unique technical capabilities and innovative thinking.
May 1971: Establishment
April 1978: Construction of the second shipway
May 1974: Construction of the first shipway
November 1976: Construction of the first shipway
January 1983: Joined Imabari Shipbuilding Group
September 1992: Completion of 178m x 90m berth wall
March 2002: Re-designated the first and second shipways as new construction docks
March 2002: Installation of two 270-ton cranes
March 2006: Installation of 300-ton crane
March 2008: Inland reclamation and expansion
September 2015: Installation of 400-ton crane
October 2019: Installation of 200-ton crane
§07
News
14 ARTICLES
Iwakura Shipbuilding New Headquarters Construction Project Report 10: Exterior and Green Roof Color Decision
Iwakura Shipbuilding Co., Ltd. announced the tenth report of its new headquarters construction project and released a projected completion CG illustration. The color of the large roof on the exterior was changed from the original navy blue to green, adopting a design that varies in hue with distance. Additionally, a plan to install solar panels and utilize the generated electricity in the new headquarters was presented.
Notice of departure of vessel S-Z669
The newly built vessel S-Z669 will depart from Iwaki Shipyard at 15:55 on Wednesday, October 28, 2026, and is expected to pass Iwaki Bridge around 16:15. The schedule may vary depending on the itinerary.
New Headquarters Construction Project, Ninth Update: “Walls”
Tiles are now visible across almost the entire exterior of the new headquarters. Inside, the spaces are also enclosed by walls and glass, except at the entrances, and small rooms have taken shape in some areas. Plans for the large roof, interior walls, and flooring are also progressing.
Progress on Iwaki Zosen's New Office Building and Roof Work
Construction of the new office building of Iwaki Zosen Co., Ltd. is under way, and work on the large roof is also proceeding. Roof finishing processes and interior work are reported, with many processes advancing toward completion of the building. Progress on exterior and interior work will be introduced in the future.
Iwaki Zosen New Office Building Under Construction, Scaffolding Complete
The foundation of the building is complete, and side work and scaffolding installation are proceeding. Drain pipes and piping are installed inside, and a dumbwaiter for carrying goods is planned. Construction is progressing steadily toward completion.
Notice of the Departure of Newbuild Vessel S-Z587
Newbuild vessel S-Z587 is scheduled to depart Iwagi Shipbuilding at 10:45 a.m. on Friday, September 11, and pass Iwagi Bridge at around 11:05 a.m. Weather is expected to be unstable that day due to the typhoon, and the timing may vary depending on the vessel’s itinerary.
Concrete Pouring Begins for Iwaki Zosen's New Office Building
Reinforcing bars were placed on the floor of the new building and concrete pouring has begun. About 300 cubic meters of concrete is used, and craftsmen are leveling it. The building has two floors and a floor area of about 2,157.80 m².
No News Information for Iwaki Zosen Co., Ltd.
The provided news document does not contain specific information or content about Iwaki Zosen Co., Ltd.. It only shows a page-not-found error.
Iwaki Zosen New Office Under Construction, Interior Work Also Begins
The outer frame and large roof of the new office are almost complete, and interior foundation work and concrete work are in progress. By building the foundation with piles and steel frames, it aims to be an earthquake-resistant building.
July 29: New Ship S-Z642 Departs
The newly built ship S-Z642 departed from Iwaki Shipbuilding at 11:05 on July 29 (Wednesday) and is scheduled to pass Iwaki Bridge around 11:25. The schedule may vary depending on the route.
§08
Public records
GOV
National Tax Agency basic information5500001012996
Source: National Tax Agency Corporate Number Publication Site, basic three items
Trade name
岩城造船株式会社
Trade name (kana)
イワキゾウセン
Name in English
Corporation type
301
Address
〒794-2410 愛媛県越智郡上島町岩城4690番地
Postal code
7942410
Prefecture code
38
City code
356
Address outside Japan
Prefecture in English
City in English
Address outside Japan in English
Corporate number assignment date
2015-10-05
Update date
2024-12-18
Change date
2015-10-05
Registry closure date
Reason for registry closure
Successor corporate number
Details of the change
Latest record
1
Excluded from search
0
Processing type
01
Correction type
1
Trade name image ID
Address image ID
Sequence number
5104456
METI gBizINFO5500001012996
Source: gBizINFO (Ministry of Economy, Trade and Industry)