Open company graph database — free web & API
Login

Tokai Rika Co., Ltd.

株式会社東海理化殿株式会社東海理化Alias東海理化Alias
Ticker
—
Listed market
—
Country
Japan
Employees (consolidated)
19,381
Related companies
0
§01

Basic information

BASIC
Head office
Chief executive
Capital
22,800,000,000  (228 100 million)
Employees (non-consolidated)
Employees (consolidated)
19,381 people
Start date
1948-08-30
End date
§02

Websites

1 DOMAINS
§03

Business

19
Various automotive switchesKey lockSeat beltShift leverElectronics application productsSteering wheelConnectorMirrorPlastic wheel coverOrnamentSafety productsRetractorSeat belt with motor retractorTOKAI RIKA Digitalkey®Company vehicle management system Bqey <Bee Key>APIApp & Mobile SDKKey management app 'FREEKEY®'Smart device for cars 'QEY box'
§04

Related companies

0 COMPANIES

—

§05

Network

NETWORK
Drag to move · click to open
§06

History

60 EVENTS

Established Tokai Rika Denki Seisakusho Co., Ltd. in Nishioiashima Town, a suburb of Nagoya City. Started with 35 employees, operating from a factory that rented part of a confectionery factory. The company name reflects the spirit of 'chemistry, electricity, machinery, and doing anything.'Sources

Purchased new land within Nishi-Ipashima Town and relocated the headquarters. Acquired approximately 6,000 m² of former pickling factory site, expanding and renovating the building to accommodate business growth.Sources

Established Tokai Rika Sales Co., Ltd. [now Tokai Rika Create Co., Ltd.]Sources

Established Hōkō Kōgyō Co., Ltd. [now Tokai Rika Service Co., Ltd.]Sources

Listed on the Second Section of both the Nagoya and Tokyo Stock Exchanges.Sources

Commenced operations at the Toyota plant. Strengthened business relationships by establishing a facility near major customers.Sources

Commenced operations at the Otowa plant. Acquired approximately 190,000 m² of expansive land and planned a large-scale factory construction anticipating future production increases.Sources

Relocated headquarters office to Shinagawa Town, Aichi Prefecture (now Chita City).Sources

Received the Toyota Quality Management Award. Implemented TQC (Total Quality Control) and worked company-wide to improve quality.Sources

Listed on the First Section of both the Nagoya and Tokyo Stock Exchanges.Sources

Received the Deming Prize. The results of implementing TQC (Total Quality Control) yielded international recognition for quality management.Sources

Relocated headquarters office to Ōguchi Town, Niwa District, Aichi Prefecture. Aiming to strengthen the technology development system and establish a central hub for future management, moved to a highly accessible location near the Komaki IC on the Tomei Expressway, which is the current headquarters location in Ōguchi Town, Niwa District, Aichi Prefecture.Sources

Received Ford Q-1 Award.Sources

Received the PM Outstanding Plant Award. Promoted TPM (Total Productive Maintenance) activities, and was recognized for high quality, productivity, and a vibrant workplace, earning a prestigious award.Sources

Established Naka-Nihon Switch Co., Ltd. [now NSK Co., Ltd.]Sources

Established a joint venture, Quality Safety Systems Company, in Canada [now TRQSS, Inc.]Sources

Established Tokai Rika U.S.A., Inc. in the United States. Tokai Rika U.S.A., Inc. became our first overseas subsidiary, founded in Michigan, USA.Sources

Established Toyo Co., Ltd. [now Tokai Rika Eletech Co., Ltd.]Sources

Established a joint venture, Rika Industrial Co., Ltd., in Taiwan.Sources

Established Ena Tokai Rika Co., Ltd.Sources

Established TAC Manufacturing, Inc. in the United StatesSources

Tokai Rika Co., Ltd. establishedSources

TAC Manufacturing, Inc. established in the United StatesSources

Thai Seat Belt Co., Ltd. joint venture established in ThailandSources

Hagi plant commenced operations. To expand the scale of the Otowa plant, land for a factory was acquired and constructed in the nearby Hagi area.Sources

MINDARIKA PRIVATE LIMITED joint venture established in IndiaSources

TRP, Inc. established in the PhilippinesSources

TOKAI RIKA (THAILAND) CO., LTD. established in ThailandSources

TRB Limited established in the United KingdomSources

Obtained QS-9000 certificationSources

Established the commonly used company name 'Tokai Rika Co., Ltd.' to commemorate the 50th anniversary of the company's foundingSources

Reorganized the U.S. subsidiary and established TRAM, Inc. as the holding company. The production division of Tokai Rika U.S.A., Inc. was spun off to form TRMI, Inc. Tokai Rika U.S.A., Inc. became the holding company, and its name was changed to TRAM, Inc.Sources

Invested capital in Miroku Technowood Co., Ltd.Sources

The West Ippajima plant was damaged by the Tokai heavy rain. Support was provided to the affected local residents, and vigorous production recovery activities were carried out at the damaged West Ippajima plant.Sources

Obtained ISO14001 certification. The entire company obtained certification for the international environmental management standard ISO14001.Sources

TRCZ s.r.o. established in the Czech RepublicSources

TRBR INDUSTRIA E COMERCIO LTDA. established in BrazilSources

Tianjin Tokai Rika Automotive Parts Co., Ltd. and Wuxi Lichang Technology Co., Ltd. established in ChinaSources

Tokai Rika Belgium N.V. established in BelgiumSources

TRMAC Engineering Co., Ltd. [now Tokai Rika Advanced Co., Ltd.] establishedSources

Foshan Tokai Rika Automotive Parts Co., Ltd. established in ChinaSources

Special sponsor of the 1st Aichi Ekiden. Provided special sponsorship for the ekiden race that includes all cities and towns in Aichi Prefecture, and assisted with event operations through employee volunteers. (Continued to date)Sources

Obtained ISO/TS16949 certification.Sources

Established TOKAI RIKA MINDA INDIA Private Limited in India.Sources

Established TOKAI RIKA ASIA CO., LTD. in Thailand.Sources

Made San Denzai Co., Ltd. a subsidiary.Sources

Opened the Tohoku Technology Center (now Tohoku Technology Development Center) in Yamagata Prefecture.Sources

Consolidated switch production from Nishioiashima Town, the birthplace of the company, to the headquarters factory. In response to environmental changes accompanying the electrification of switches, production at the Nishioiashima factory was consolidated into the headquarters factory.Sources

Established PT. TOKAI RIKA INDONESIA in Indonesia.Sources

Established PT. TOKAI RIKA SAFETY INDONESIA in Indonesia.Sources

Compliant with ISO 26262 standard.Sources

Established TOKAI RIKA MEXICO, S.A. DE C.V. in Mexico.Sources

Established Tokai Rika (Jiangsu) Automobile Parts Co., Ltd. in China.Sources

Obtained IATF 16949 certification.Sources

Expanded the digital key business and established the 'TOKAI RIKA Digitalkey' brand.Sources

NSK Co., Ltd. and Ena Tokai Rika Co., Ltd. performed a developmental integration, establishing Tokai Rika NExT Co., Ltd.Sources

Established Tokai Rika Touhoku Co., Ltd.Sources

Moved from the First Section to the Prime Market of the Tokyo Stock Exchange due to a review of market classifications.Sources

Moved from the First Section to the Premier Market of the Nagoya Stock Exchange due to a review of market classifications.Sources

Commenced operations of the Bamboo+ Kochi factory.Sources

§07

News

5 ARTICLES

Video Data Acquisition for Autonomous Bus Demonstration in Saga CitySources

East Kai Rika Electric Manufacturing Co., Ltd. will acquire video data using cameras installed inside and outside the vehicle during the autonomous bus demonstration in Saga City, and conduct technical verification of the remote monitoring system. The captured footage will be live‑streamed to the control center for monitoring operations and enhancing safety. Filming will take place from November 14, 2026 to January 22, 2027 in the area from Saga Station Bus Center to SAGA Sunrise Park.

Demonstration Test of Hydrogen-Only Combustion in a Foundry FurnaceSources

Tokai Rika replaced the city gas burner with a hydrogen burner in the foundry furnace at the Otowa plant and conducted a demonstration test using hydrogen as the sole fuel. This initiative, carried out in collaboration with the Tohoku Gas Group and Miyamoto Industrial Works, is the second demonstration test following the hydrogen utilization at the Toyota plant in 2025. The company aims to reduce its factory CO2 emissions by more than 60% compared to fiscal 2013 by 2030 as part of its carbon-neutral strategy.

Obtaining video data in the autonomous bus demonstration experiment in Fuji CitySources

Tokai Rika will use the video footage from inside and outside the vehicle in the autonomous bus demonstration experiment conducted in Fuji City to verify the display range and presentation of the remote monitoring system. The filming will take place from November 1 to 15, 2026, on a single vehicle running between Fuji Station, Shin-Fuji Station, and Tagonoura Port. Seven cameras outside the vehicle and three inside will be used. The data will be obtained and used in a manner that does not allow identification or determination of individuals.

Video Acquisition in the Autonomous Bus Pilot Experiment in Toyokawa CitySources

Tokai Rika will acquire footage using cameras inside and outside the vehicle during the autonomous bus pilot experiment conducted in Toyokawa City, and will use it for testing remote monitoring systems, etc. The footage will be live‑transferred to the control center and will be captured and used in a manner that does not allow identification or personal identification. The filming period is from October 29, 2026 to November 23, 2026, and the filming area is from Aeon Mall Toyokawa to Toyokawa Inari.

Collection of Route Bus Video Data with Sotetsu BusSources

Tokai Rika will conduct joint testing with Sotetsu Bus toward developing and commercializing an in-vehicle safety system aimed at reducing accidents inside buses. Cameras installed inside and outside two target vehicles will record footage, which will be collected and used in a way that does not identify individuals to test and train image recognition technology and AI models related to passenger safety. Recording is scheduled from October 30, 2026, through March 31, 2028, on selected routes served by the Sotetsu Bus Asahi Sales Office.

§09

Sources & updates

SOURCES
↑