Metsa Parking Lot's Solar Carport Wins Phase-Free Award 2026 GOLD
Public Power Co., Ltd. was responsible for the operation and management of the large-scale solar carport and battery storage system installed at Metsa Parking Lot, and received the GOLD award at the Phase-Free Award 2026. The evaluation was based on the facility's contribution to both everyday vibrancy and regional disaster prevention.