Steel businessEngineering businessRental businessLogistics businessManufacturing and sales of thick steel platesManufacturing and sales of steel chipsCutting and processing of steel platesEnvironmentally friendly electric furnace steel material "Sumires"JIS standard productsProprietary standard productsShip classification society standard products
Names without a link are companies not yet registered in OpenBizGraph
§05
Network
NETWORK
Loading the relationship graph...
Drag to move · click to open
§06
History
71 EVENTS
Company establishment
Start of operation as the only steel plate rolling factory in the Tokai region
Relocation of headquarters to Atsuta Factory
Start of striped steel plate manufacturing
Installation of two 5-ton electric furnaces at Atsuta Factory
Installation of one 15-ton electric furnace at Atsuta Factory
Expansion of factory at 5-chome Kogutsu-dori, Nakagawa-ku, Nagoya (Nakagawa Factory)
Relocation of headquarters to Nakagawa Factory
Installation of two 30-ton electric furnaces at Nakagawa Factory
Listed shares on Nagoya Over-the-Counter Market
Added one 3-high rolling mill at Nakagawa Factory
Listed shares on Nagoya Stock Exchange Second Section
Added one 200-ton electric furnace at Nakagawa Factory
Opened Tokyo Sales Office
Received Nagoya Bureau of Commerce and Industry Director Award as a model factory for industrial standardization implementation
Opened Osaka Sales Office
Sold Atsuta Factory
Started steel plate processing
Established Meitoku Industry Co., Ltd. and transferred equipment maintenance operations
Received approval for the old Yawata Steel designated shear factory for the processing division
Established Chukang Steel Corporation and opened a golf practice range
Listed shares on Nagoya Stock Exchange First Section (now: Premier Market)
Installed one slab continuous casting machine in the steelmaking plant
Upgraded the hot-rolled thick plate mill at the rolling mill from a 3-high to a 4-high mill
Upgraded the hot-rolling mill's heat treatment equipment
Installed electromagnetic stirring device
Installed ladle refining furnace (LF) in the steelmaking plant
Converted the 200-ton electric furnace to an eccentric bottom tapping (EBT) method
Completed new scrap yard and installed slag granulator (slag treatment equipment)
Established CK Trading Co., Ltd. and commenced trading operations
Expansion of cooling beds (quenching equipment), completion of new central control room for electric furnace
Established Seque-Clean AD Co., Ltd., started planning, manufacturing, and installing signage, transferred business of industrial kitchen grease filter rental to the company
Updated the heating furnace of the rolling mill to a walking beam type
Installed 6KW laser cutting machine
Established CK Logistics Co., Ltd., commenced hazardous goods warehouse operations
Established Mamex Co., Ltd., expanded into manufacturing and sales of frozen tofu
Installed vertical ejection (VE)
Obtained ISO9002:1994 certification
Added another 6KW laser cutting machine
Constructed PSS building, installed slag and PSS processing equipment
Obtained ISO9001:2000 certification
Updated slab continuous casting machine
Installed two plasma cutting machines
Closed golf practice range
Extended scrap yard
Obtained ISO14001:2004 certification
Updated electric furnace multi-function (Cohere) burner in steelmaking plant
Sold Mamex Co., Ltd.
Expanded rolling mill, installed 2000-ton press machine
Rolling mill plant: Cooling bed extension
Plasma cutting machine: Installation of one unit
Rolling mill plant: Complete regeneration burner conversion for heating furnace
Rolling mill: Main motor update (3640KW×2)
Dissolution of Chukang Corporation
Withdrawal from medical industrial waste disposal business
Rolling mill plant: Seismic reinforcement work for building
Withdrawal from order and sale of striped steel plates
Rolling mill plant: Update of rolling mill housing
Steelmaking plant: Construction of new ground slag treatment facility
Rolling mill plant: Cold leveler update
Manufacturing office: Completion
New CC maintenance yard
Steelmaking plant: Seismic reinforcement work for building
Establishment of MEITOKU ENGINEERING VIETNAM CO., LTD
Transition to a company with an audit and supervisory committee
Transfer of all shares of MEITOKU ENGINEERING VIETNAMU CO., LTD
Listed on the Tokyo Stock Exchange Prime Market
Steelworks 200-ton electric furnace upgrade
§07
News
2 ARTICLES
Obtained EN10025 Compliance Certification
Chubu Steel Co., Ltd. has obtained EN10025-1 and EN10025-2 certifications from TÜV Rheinland and has begun supplying electric arc furnace flat-rolled steel. The certification demonstrates the quality management system and product specification compliance, enabling the supply of environmentally friendly steel to the European market.
Featured on TV Tokyo's 'Unknown Gulliver'
Chubu Steel Sheet will be featured on TV Tokyo's 'Unknown Gulliver', scheduled to air on Saturday, October 24, 2026, at 18:00. The program will include interviews with the president and employees, and will cover the production site of thick plate manufacturing using recycled iron scrap and the characteristics of the products. A free catch-up broadcast will be available on TVer for one week after the airing.