Development, manufacturing, and sales of shipboard air blowersHirose axial flow blowerVarious blowersAxial flow blowers and pressure-resistant explosion-proof axial flow blowersShirocco fanTurbo fanMarine equipment
§04
Related companies
0 COMPANIES
—
§05
Network
NETWORK
Loading the relationship graph...
Drag to move · click to open
§06
History
43 EVENTS
On October 1, 1907, at 600 Ukitsu, Muroto City, Kōchi Prefecture, the company was founded as Hirose Tank Store, manufacturing and selling various canned products for ship fuel oil tanks
On February 16, 1955, at 2338 Muroto, Muroto City, Kōchi Prefecture, Hirose Ironworks Co., Ltd. was established
In December 1956, the first phase of the new factory was completed
In April 1959, the second phase of the new factory was completed
In February 1960, the manufacturing and sale of marine axial flow blowers (0.4 kW–3.7 kW) began
In September 1961, a 300‑ton oil‑pressure press was newly established
In February 1962, multi‑wing blowers and limit‑type blowers were developed
In October 1963, the capital was increased to 1.8 million yen
In March 1965, the capital was increased to 3.2 million yen
In May 1967, axial flow blowers (11 kW–15 kW) were developed
In January 1968, the capital was increased to 7 million yen
In April 1968, a 500‑ton oil‑pressure press and three ceiling‑running cranes were newly established
In November 1968, a China sales office was opened in Onomichi
March 1969: Development of 0.4kW–15kW shipboard pressure-resistant explosion-proof axial flow fan
July 1970: Completion of Phase 1 of new employee housing
January 1971: Capital increase to 10 million yen
July 1971: Completion of Phase 2 of new employee housing
August 1971: Shimazu Manufacturing Co., Ltd. – New large balance machine; New small balance machine
October 1971: Expansion of fan test facility and paint shop
December 1971: New large angle bend machine
August 1972: Development of 18.5kW–45kW pressure-resistant explosion-proof axial flow fan
February 1973: New front panel (1,600 φ)
May 1974: Commencement of production and sales of 100kW draft fan
December 1975: New milling machine
October 1978: Relocation of headquarters and factory to 716 Muroto City, with simultaneous merger of Hamasaki Ironworks; total site area 7,850 m², factory area 1,820 m², office area 185 m², parking area 1,400 m²
January 1979: Expansion of semi‑automatic welding machine and radial ball mill
March 1979: Capital increase to 15 million yen; purchase of new measuring instruments (frequency analyzer, vibration frequency analyzer)
May 1980: Commencement of production and sales of 125kW draft fan
April 1981: Commencement of production of centrifugal separator for mud‑water separation for Daikokigōkō Industrial Co., Ltd.
April 1988: Commencement of production and sales of 210kW draft fan
July 1988: Approval by Kochi Prefecture for general construction business (steel structure and machinery installation) – Approval number: Prefectural Governor Approval (General 61) No. 5878
March 1989: Commencement of production and sales of 3‑wing low‑noise axial flow fan (Kochi Prefecture SME technology development grant No. 236)
May 1989: Adoption of aluminum‑welded fan blade structure for cooling fan for refrigerated transport vessels
May 1990: New 50Hz/60Hz combined control fan test bench
August 1990: Delivery of 10 turbo fans to the Power Reactor Fuel Development Organization
April 1991: OEM production of exhaust fans for Hitachi Ltd. (3.7kW–45kW) began
April 1994: OEM production of 3‑blade low‑noise axial flow fans for Hitachi Ltd. (1.5kW–15kW) began
October 2004: Capital increased to 20 million yen
December 2005: Capital increased to 80 million yen
December 2016: New CNC lathe established
December 2018: New 300‑ton hydraulic press established
August 2021: New 700‑ton hydraulic press established
October 2024: Tokyo office opened in Chuo‑ku, Nihonbashi