Open company graph database — free web & API
Login

Kōdensha Co., Ltd.

株式会社恒電社
Ticker
—
Listed market
—
Country
Japan
Employees (non-consolidated)
—
Related companies
24
§01

Basic information

BASIC
Head office
6-108 Nishi-Kobari, Ina Town, Kitaadachi District, Saitama Prefecture 362-0811, Japan
Chief executive
Takaaki Tsuneishi
Capital
30,000,000
Employees (non-consolidated)
Employees (consolidated)
Start date
1993-12-01
End date
§02

Websites

1 DOMAINS
§03

Business

5
Solar power generation equipment businessHigh-voltage electrical equipment construction businessInstallation business of solar power generation equipment for corporate clientsElectrical construction and equipment sales for corporate clientsPower generation business using renewable energy
§04

Related companies

24 COMPANIES
Company name Group Parent Subsidiary Customer Supplier Alliance Bank Shareholder
ケセンエナジー株式会社
Group
コデンホールディングス株式会社
Group
株式会社Logie
Group
株式会社はやぶさ未来エナジー
Group
株式会社コアフィールズ
Group
株式会社コデンパワーエンジニアリング
Group
株式会社コデンパワーサプライ
Group
株式会社ソラ
Group
美濃国電源開発株式会社
Group
Kirayaka Bank
Bank
オーストラリア大使館
Daiwa Rabin Co., Ltd.
Panasonic Homes Saitama West Co., Ltd.
Japan Building Sheet Metal Association
Mitsubishi UFJ Bank Ltd.
Bank
Japan Federation of Co-operative Central Bank
Bank
Saitama Resona Bank Co., Ltd.
Bank
Saitama New Urban Transportation Co., Ltd.
大宮アルディージャ
Japan Finance Corporation
Bank
Echo Advertising Printing Co., Ltd.
Musashino Bank Ltd.
Bank
Ashikaga Bank
Bank
Hanno Credit Union
Bank
Names without a link are companies not yet registered in OpenBizGraph
§05

Network

NETWORK
Drag to move · click to open
§07

News

13 ARTICLES

Electrical Forecaster Nani Ito Appointed as Recruiter and Public Relations Advisor at Kōden Co., Ltd.Sources

Kōden Co., Ltd. has appointed electrical forecaster Nani Ito as a recruiter and public relations advisor. Ito will be responsible for recruitment and PR strategy, promoting initiatives that showcase construction sites and employees through videos and social media. This activity, named the "Next-Gen Navigator Project" in line with the company’s mission, aims to nurture young and female electrical workers.

Public Release of the Cubicle Expansion Project in Kawashima TownSources

We have published a case study of the 500kVA high-efficiency cubicle expansion project carried out at a business facility in Kawashima Town, Hikimi District, Saitama Prefecture. It introduces the process of achieving a short delivery time through negotiations with the manufacturer in response to material shortages, and the integrated construction process from foundation work to power reception application.

Publication of a Case Study of High-Voltage Cable Renewal Work in Reneta CitySources

We have published a case study of high-voltage cable renewal work carried out in Reneta City, Saitama Prefecture. Since the existing piping cannot be used, we performed new piping with lining pipe, removed vegetation, and replaced the column of the No.1 pillar. We safely completed the pressure test within the Saturday power outage period.

Published a PAS Upgrade Case Study for a Medical Clinic in Ageo CitySources

We published a case study on upgrading a PAS at a clinic in Ageo City, Saitama Prefecture, to a directional 300 A model with built-in VT/LA. To minimize disruption to medical services, the work procedures were coordinated in advance with the chief electrical engineer and the power company, and the installation was completed in one day. The article also covers the work procedure and recommended timing for upgrades.

Construction Case Study Published: High-Voltage Receiving Equipment Upgrade in Itabashi CitySources

We have published a case study of a comprehensive upgrade of high-voltage receiving equipment (cubicle enclosure, transformer, high-voltage cables, and UAS) carried out on the rooftop of a building in Itabashi City, Tokyo. Three types of work were performed simultaneously to address aging equipment and prevent cascading accidents. The case study introduces ways to reduce costs by avoiding duplicate expenses for heavy machinery and labor, as well as key points for using subsidies.

Refurbishment of grounding electrodes with PAS/SOG at a paper recycling facility in Kuki CitySources

We published a construction case where we updated the PAS/SOG control device and installed a new grounding electrode for the lightning arrester at a paper recycling facility in Kuki City, Saitama Prefecture. Since the facility operates 365 days a year, the work involving power outages was carried out after 5 p.m., and the outage lasted 4 hours. We present the measured grounding resistance of 5.8 Ω and the construction procedure.

Publicizing a Cubicle Renewal Project in Todō CitySources

We have published a case study of a cubicle renewal project carried out at a logistics warehouse in Todō City, Saitama Prefecture. The aging receiving and transforming equipment was fully upgraded to an outdoor 4-sided cubicle (single-phase 100kVA, three-phase 200kVA), and within the limited space and the full power outage period on Sunday, we completed removal, installation, and various tests.

Publication of a High-Voltage Cable Replacement Project CaseSources

We have published a case of high-voltage cable replacement work carried out at a welfare facility in Saitama Prefecture. The cable that had insulation failure was upgraded to 6600V CVT38sq, and by pre-discussion with stakeholders, the power outage time was reduced to about 3 hours, completing the work in one day. This is a case where we shared the risks of cable procurement difficulty, delivery time, and construction period with the customer before proceeding with the construction.

Publication of Kumakura Co., Ltd. Implementation Case Study ArticleSources

We published an interview article featuring Kumakura Co., Ltd. The article covers how, after installing a self-consumption solar power system, we carried out the renewal of the factory's cubicle (high-voltage receiving and transforming equipment). We also discussed the criteria that were important when selecting an electrical contractor and the challenges before the renewal.

Published the Electrical Contractor Interview Excerpt SeriesSources

Based on interviews with electrical contractors, we released a six-part series titled 'Electrical Contractor Interview Excerpts' that introduces on-site information about high-voltage substation and transformer construction. The series explains, from a field perspective, the often confusing points in equipment upgrades such as cubicle updates, choosing between used and new equipment, transformer capacity, power reception methods, and safety responsibilities.

§09

Sources & updates

SOURCES
↑