Kobukuro Steel Works Co., Ltd.
Basic information
- Head office
- 1-16-6 Toba, Toba City, Mie Prefecture
- Chief executive
- Kazufumi Kobukuro
- Capital
- 10,000,000
- Employees (non-consolidated)
- 80 people
- Employees (consolidated)
- Start date
- 1949-04-01
- End date
Websites
Business
Related companies
| Company name | Group | Parent | Subsidiary | Customer | Supplier | Alliance | Bank | Shareholder |
|---|---|---|---|---|---|---|---|---|
| JFEエンジニアリング株式会社 | ||||||||
| JFEテクノス株式会社 | ||||||||
| JFE物流株式会社 | ||||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
| Nakabishi Engineering Co., Ltd. | ||||||||
| Itochu Corporation | ||||||||
| 大同特殊鋼株式会社 | ||||||||
|
|
||||||||
| 日本車輌製造株式会社 | ||||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
|
|
Network
History
As a cooperating factory for Nihon Steel Pipe Co., Ltd. Tsu Shipyard, production of mast posts, cargo handling equipment, mooring fittings, oil pipe handling equipment, etc., commenced![]()
With the start of operations of Nihon Steel Pipe Co., Ltd. Tsu Shipyard Heavy Industry Division, began manufacturing pressure vessel parts as a cooperating factory, then introduced 1500-ton press and bending rollers, adding heavy plate press processing and large-diameter pipe manufacturing![]()
In response to NKK's order for piles for oil and gas development, strengthened heavy plate large-diameter pipe production system. Since then, produced 2,000-ton/year piles for Shell, TransArieska Pipeline, Maui, Aramco, etc.![]()
Completion of Tsu factory at same site, site area 12,235 square meters, building area 2,960 square meters, thereby establishing order-taking capability for NKK projects involving high bulk and long-length items previously impossible to transport![]()
Commencement of business with Mitsubishi Heavy Industries, Ltd. and Nagoya Equipment Manufacturing Plant Iwatsuka Factory; start manufacturing frames, beds, oil tanks, etc. for injection molding machines![]()
Due to road expansion in front of Tobu Factory, Tobu Factory was downsized and relocated to Tsu Factory with expansion. As a result, Tsu Factory becomes 4,881㎡![]()
Received orders for shield panels (radio blackout rooms) for Riken EMC Co., Ltd. at various locations from Steel Pipe Tsu Kiko Co., Ltd., and delivered 76-ton unit to Toyohashi Japan EMC Co., Ltd.![]()
Manufacture of cleaner gate and 320-ton support column for Iiruka Factory of Takigami Industrial Co., Ltd.![]()
Order and manufacture of 87-ton reaction tower for Tsunishi West Cleaning Plant from Steel Pipe Tsu Kiko Co., Ltd.![]()
Order and production of a ship loader and other equipment for NKK's South American Orinoco, 257 tons.![]()
Order and production of staging and lifting devices for NKK's San'yō National Policy pulp, 156 tons.![]()
Order and production of water pressure steel pipe and waste water pipe for NKK's Mie Prefecture Aota Power Plant, 160 tons.![]()
Order and production of steel silo for coal storage for China Power Co., Ltd. Sumikawa Power Plant, from Mitsubishi Heavy Industries Co., Ltd. Hiroshima plant, 893 tons.![]()
Order and production of formwork panels for the upper works of Kawasaki artificial island in Kanagawa Prefecture, 379 tons.![]()
Order and production of waterproof wall of steel pipe connection road inside Kanda River inlet in Tokyo, 95 tons.![]()
Order and production of support pillars (Galeria) for Kameoka City Central Lifelong Learning Center, 502 tons.![]()
Order and production of new construction of 3 blast furnace raw material silos (iron ore silos) and hopper, 1,705 tons, for Kobe Steel Co., Ltd., from Mitsubishi Heavy Industries Co., Ltd. Hiroshima plant.![]()
Order and production of 4 main towers for Sakakibara Wind Power Plant in Kuji City, Mie Prefecture, 220 tons.![]()
Order and production of maintenance work for the lower part of Chikimori Bridge in Yamaguchi Prefecture, 232 tons.![]()
Order and production of box girder for Saitama Sub-City Center, 109 tons, from Miyaji Railway Works Co., Ltd.![]()
Order and production of girder continuous construction for Nagoya Expressway Public Corporation, 137 tons.![]()
Order and production of main girder for Hokusei BPJR elevated bridge, 101 tons, from Takigami Industrial Co., Ltd.![]()
Order and production of upper seismic reinforcement work for Nagoya Expressway Public Corporation, 232 tons.![]()
Order and production of gas holder accessories for Nippon Steel, 68 tons, from Mitsubishi Heavy Industries Co., Ltd. Hiroshima plant.![]()
Began manufacturing aircraft jigs for Mitsubishi Heavy Industries, Ltd.'s Nagoya Aerospace Systems Works, commissioned by Churyo Engineering Co., Ltd.![]()
Received an order from Mitsubishi Heavy Industries, Ltd.'s Hiroshima Works and manufactured four 130-ton blowers for the Kamiyama Ventilation Station on the Shinjuku Line.![]()
Received an order from Yamaura Corporation and manufactured 160 tons of frame rails and a transfer trolley for Nippon Paper Industries.![]()
Received an order from JFE Engineering Corporation and manufactured 3,200 tons of legs for the JKT on the Haneda Airport connecting taxiway.![]()
Received an order from Universal Shipbuilding Corporation's Maizuru Works and manufactured main engine beds, generator beds, and crane posts for the Antarctic research vessel Shirase.![]()
Received an order from Choryo High-Tech Co., Ltd. and manufactured eight 200-ton blowers for the inward-bound track at Yoyogi on the Shinjuku Line.![]()
Manufactured adapters and other items for an HTV weight and center-of-gravity measuring device for Mitsubishi Heavy Industries, Ltd.'s Nagoya Guidance & Propulsion Systems Works, commissioned by Churyo Engineering Co., Ltd.![]()
Received an order from Hitachi Zosen Corporation and manufactured a 200-ton cluster stack at Cosmo Oil's Sakai Refinery.![]()
Received an order from Mitsubishi Heavy Industries Steel Structure Engineering Co., Ltd. and manufactured 106 tons of gas-holder accessories for Nippon Steel's Kimitsu Works.![]()
Received an order from Nippon Sharyo, Ltd. and manufactured 500 tons of sandwich composite deck slabs for the Tokushima East Circular Route.![]()
Began ongoing production of grizzlies for Nippon Steel's Nagoya Works in collaboration with a manufacturer.![]()
Received an order from Universal Shipbuilding Corporation's Keihin Works and manufactured 176 tons of stern rollers for four ships.![]()
Received an order from IHI Corporation and manufactured 30 tons of equipment for the No. 2 blast furnace project at Sumitomo Metal Industries' Wakayama Works.![]()
Received an order from Churyo Engineering Co., Ltd. and manufactured two containers for F-2 aircraft for the Ministry of Defense.![]()
Received an order from a manufacturer and manufactured a 62-ton secondary combustion furnace for disaster waste treatment.![]()
Received an order from JFE Engineering Corporation and manufactured a 900-ton seawall for the Hamaoka Nuclear Power Plant.![]()
Received an order from Hitachi Zosen Corporation and manufactured an 82-ton flue duct for Nippon Steel Yawata.![]()
Received an order from JFE Engineering Corporation and manufactured 160 tons of JKT and grating for the Sendai Port quay wall.![]()
Began manufacturing 215 tons of outfitting items for the CANDO DRILLFHIP at IHI Corporation's Aichi Works.![]()
Began manufacturing 1,460 tons of tank support structures for four LNG vessels for Japan Marine United Corporation's Tsu Works.![]()
Began manufacturing 112 tons of external elevator shafts and external stairs for Nippon Steel & Sumitomo Metal's Kimitsu Works, commissioned by Mitsubishi Mechatronics Systems Co., Ltd.![]()
Began manufacturing four mobile work platforms totaling 200 tons for Mitsubishi Heavy Industries, commissioned by Tech Sasaki Co., Ltd.![]()
Began manufacturing and assembling 380 tons of plate wrapping for bridge piers in the Aoba district of the Yokohama Circular Northwest Route for JFE Engineering Corporation.![]()
Began manufacturing 65 tons of the stack shell and steel tower for the Hachijojima Internal Combustion Power Plant for Hitachi Zosen Corporation.![]()
Began manufacturing 172 tons for the Hekinan stack improvement project for Mitsubishi Heavy Industries Mechatronics Systems, Ltd.![]()
Received an order from a manufacturer and manufactured accessories for a shield machine (three trailing cars and three steel-wheeled cars).![]()
Received an order from JFE Engineering Corporation and manufactured two sets of main girders, totaling 99 tons, for Runway A at Haneda Airport.![]()
Received an order from Mitsubishi Heavy Industries Machinery Systems, Ltd. and manufactured an additional filtration holding tank for Asahi Breweries' Nagoya Plant.![]()
Received an order from JFE Engineering Corporation and manufactured 77 tons of longitudinal girders for the superstructure of the bridge on National Route 25 (Satsukibashi).![]()
Received an order from Mitsubishi Heavy Industries Machinery Systems, Ltd. to expand a filtration tank at Asahi Breweries, Ltd.'s Nagoya Plant; manufactured the tank.![]()
Received an order from a manufacturer for a mobile pier for the Hokkaido Shinkansen; manufactured it.![]()
Received an order from a manufacturer for shield machine accessories (trailing cars and steel wheels); manufactured them.![]()
Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.![]()
Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.![]()
Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.![]()
Received an order from JFE Engineering Corporation for fabrication of 1,100 tons of temporary facilities for the bridge renewal project between Suita Junction and Chugoku-Ikeda Interchange; fabricated them.![]()
Received an order from JFE Engineering Corporation for fabrication of 200 tons of temporary facilities for the Kawachi River Bridge; fabricated them.![]()
Received an order from Meiko Construction Co., Ltd. for 320 tons of steel plate bending for seismic reinforcement work on the Onishi Interchange on-ramp bridge and three other bridges; completed the fabrication.![]()
Commenced production of ship outfitting components for a TEU-class container ship for Japan Marine United Corporation.![]()
Received an order from JFE Engineering Corporation for fabrication of a 161-ton steel caisson lifting frame for Mage Island; fabricated it.![]()
Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.![]()
Commenced production of ship outfitting components for a TEU-class container ship for Japan Marine United Corporation.![]()
Received an order from JFE Engineering Corporation for fabrication of 29 tons of temporary facilities for the superstructure work on Bridge No. 1 of Ramp A at Sakae Interchange/Junction on the Yokohama-Shonan Road; fabricated them.![]()
Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.![]()
Commenced production of ship outfitting components for a TEU-class container ship for Japan Marine United Corporation.![]()
Received an order from JFE Engineering Corporation for fabrication of 84 tons of jigs for the superstructure work on the Yodogawa East Viaduct; fabricated them.![]()
Received an order from JFE Engineering Corporation for 923 tons of steel plate bending for the NTT Osaka utility tunnel; completed the work.![]()
Received an order from JFE Engineering Corporation for 121 tons of steel plate bending for a φ10,710 earth pressure balance shield machine for the Shimizu/Sotetsu Line undergrounding project; completed the work.![]()
Received an order from JFE Engineering Corporation for 0.7 tons of various bending work for the Kitatokyo Pedestrian Deck; completed the work.![]()
Start of production of ship fittings for DWT-type ore and bulk carrier from Japan Marine United Co., Ltd.![]()
News
Notice of Reception Mail Server Failure and Recovery
On November 3, 2021, a failure caused by high load occurred on the reception mail server, lasting from around 14:20 to 15:50. It has now been recovered, and emails are being delivered sequentially. We apologize for the inconvenience caused to users.
Public records
National Tax Agency basic information3190001007758
- Trade name
- 株式会社小久保鉄工所
- Trade name (kana)
- コクボテッコウショ
- Name in English
- Corporation type
- 301
- Address
- 〒517-0011 三重県鳥羽市鳥羽1丁目16番6号
- Postal code
- 5170011
- Prefecture code
- 24
- City code
- 211
- Address outside Japan
- Prefecture in English
- City in English
- Address outside Japan in English
- Corporate number assignment date
- 2015-10-05
- Update date
- 2018-05-07
- Change date
- 2015-10-05
- Registry closure date
- Reason for registry closure
- Successor corporate number
- Details of the change
- Latest record
- 1
- Excluded from search
- 0
- Processing type
- 01
- Correction type
- 1
- Trade name image ID
- Address image ID
- Sequence number
- 3782314
METI gBizINFO3190001007758
- Corporate number
- 3190001007758
- Trade name
- 株式会社小久保鉄工所
- Trade name (kana)
- コクボテッコウショ
- Trade name (alphabet)
- Registry closure date
- Reason for registry closure
- Registered address
- 三重県鳥羽市鳥羽1丁目16番6号
- Postal code
- 5170011
- Prefecture
- 三重県
- Prefecture code
- 24
- City or district
- 鳥羽市
- City code
- 211
- Street address
- 鳥羽1丁目16番6号
- Organisation type
- 301
- Processing type
- 01
- Correction type
- 1
- Status
- Representative
- Capital
- Employees
- 63
- Employees (male)
- 72
- Employees (female)
- 3
- Business summary
- 大物構造物加工 (大型製品の製作) ・船舶艤装品 ・橋梁 ・産業機械 ・火力煙突など
- Website URL
- http://kokubo.cc
- Year founded
- 1958
- Business category
- E:製造業
- Date established
- Unified government qualification - grade
- Unified government qualification - business items
- Update date
- 2018-05-07
- Key information
- 3190001007758