Open company graph database — free web & API
Login

Kobukuro Steel Works Co., Ltd.

株式会社小久保鉄工所
Ticker
—
Listed market
—
Country
Japan
Employees (non-consolidated)
80
Related companies
21
§01

Basic information

BASIC
Head office
1-16-6 Toba, Toba City, Mie Prefecture
Chief executive
Kazufumi Kobukuro
Capital
10,000,000
Employees (non-consolidated)
80 people
Employees (consolidated)
Start date
1949-04-01
End date
§02

Websites

1 DOMAINS
§03

Business

7
Can weldingHeavy plate press bendingLarge machinery machiningStainless steel and aluminum can processingAssemblyBlastingPainting
§04

Related companies

21 COMPANIES
Company name Group Parent Subsidiary Customer Supplier Alliance Bank Shareholder
JFEエンジニアリング株式会社
Customer
JFEテクノス株式会社
Customer
JFE物流株式会社
Customer
UBE Machinery Co., Ltd.
Customer
Kanadevia Corporation
Customer
Kikukawa Enterprise Co., Ltd.
Customer
Symphonia Technology Corporation
Customer
Japan Marine United Co., Ltd.
Customer
Mitsubishi Kakoki Kaisha, Ltd.
Customer
Mitsubishi Heavy Industries Machinery Technology Co., Ltd.
Customer
Mitsubishi Heavy Industries, Ltd.
Customer
Mitsubishi Heavy Industries Machinery Systems Co., Ltd.
Customer
Nakabishi Engineering Co., Ltd.
Customer
Itochu Corporation
Customer
大同特殊鋼株式会社
Customer
Shintō Industries Co., Ltd.
Customer
日本車輌製造株式会社
Customer
IHI Corporation
Customer
Yamauchi Corporation
Customer
Japan Steel Works, Ltd.
Customer
Tsubaki Honkōgyō Co., Ltd.
Customer
Names without a link are companies not yet registered in OpenBizGraph
§05

Network

NETWORK
Drag to move · click to open
§06

History

116 EVENTS

Subcontract factory of Shin-Kou Electric Co., Ltd. in Toba, Toba CitySources

Establishment of Kobukuro Iron Works Ltd.Sources

New factory built on current site at 1-chome, Toba, Toba City, covering 304 square metersSources

Expansion of factory by 340 square meters at the same siteSources

Manufacturing of large woodworking machine frames for Kikukawa Iron Works Co., Ltd.Sources

Total factory expansion at current site will be 2,000 square metersSources

As a cooperating factory for Nihon Steel Pipe Co., Ltd. Tsu Shipyard, production of mast posts, cargo handling equipment, mooring fittings, oil pipe handling equipment, etc., commencedSources

With the start of operations of Nihon Steel Pipe Co., Ltd. Tsu Shipyard Heavy Industry Division, began manufacturing pressure vessel parts as a cooperating factory, then introduced 1500-ton press and bending rollers, adding heavy plate press processing and large-diameter pipe manufacturingSources

In response to NKK's order for piles for oil and gas development, strengthened heavy plate large-diameter pipe production system. Since then, produced 2,000-ton/year piles for Shell, TransArieska Pipeline, Maui, Aramco, etc.Sources

Approval to use API-2B monogram by American Petroleum InstituteSources

Commenced construction of Tsu factory in front of Tsu City, Nihon Steel PipeSources

Completion of Tsu factory at same site, site area 12,235 square meters, building area 2,960 square meters, thereby establishing order-taking capability for NKK projects involving high bulk and long-length items previously impossible to transportSources

Manufacturing of piles for NKK Shell QatarSources

Manufacture of pipe rack modules for NKK Saudi Arabia AOCSources

Commencement of business with Mitsubishi Heavy Industries, Ltd. and Nagoya Equipment Manufacturing Plant Iwatsuka Factory; start manufacturing frames, beds, oil tanks, etc. for injection molding machinesSources

Manufacture of pipe rack modules for NKK BERISources

Manufacture of raiser clamps and sliders for NKK North RankinSources

Manufacture of modules and ramen panels for NKK Saudi PetrochemicalSources

Preparation of 5,000㎡ outdoor work area at Tsu FactorySources

Due to road expansion in front of Tobu Factory, Tobu Factory was downsized and relocated to Tsu Factory with expansion. As a result, Tsu Factory becomes 4,881㎡Sources

Commencement of business with Toshiba Mie Factory, Ltd.Sources

Manufacture of walkways for NKK jackets 'Hidargo' and 'Gale'Sources

Commencement of business with Ishikawa Harima Heavy Industries, Ltd. Aichi FactorySources

Manufacture of walkways, trunnion lifting, etc. for NKK jacket 'Marathon'Sources

Commencement of business with Kurimoto Ironworks, Inc. Izunokita FactorySources

Manufacture of platform for Chita LNG base of Chubu Electric Power Co., Ltd.Sources

Manufacture of 120-ton traverser for Nippon Steel CorporationSources

Commencement of business with Mitsubishi Heavy Industries, Ltd. Hiroshima PlantSources

Received orders for shield panels (radio blackout rooms) for Riken EMC Co., Ltd. at various locations from Steel Pipe Tsu Kiko Co., Ltd., and delivered 76-ton unit to Toyohashi Japan EMC Co., Ltd.Sources

Commencement of business with Nihon Steel Pipe Co., Ltd. Tsurumi PlantSources

Manufacture of cleaner gate and 320-ton support column for Iiruka Factory of Takigami Industrial Co., Ltd.Sources

Order and manufacture of 87-ton reaction tower for Tsunishi West Cleaning Plant from Steel Pipe Tsu Kiko Co., Ltd.Sources

Manufacture of 44-ton steel bridge pier for Kansai Airport from NKKSources

Order and production of a ship loader and other equipment for NKK's South American Orinoco, 257 tons.Sources

Manufacturing of 74 tons for Tokyo Keiki Co., Ltd.Sources

Order and production of staging and lifting devices for NKK's Nagoya pulp, 95 tons.Sources

Order and production of staging and lifting devices for NKK's San'yō National Policy pulp, 156 tons.Sources

Order and production of water pressure steel pipe and waste water pipe for NKK's Mie Prefecture Aota Power Plant, 160 tons.Sources

Order and production of steel silo for coal storage for China Power Co., Ltd. Sumikawa Power Plant, from Mitsubishi Heavy Industries Co., Ltd. Hiroshima plant, 893 tons.Sources

Order and production of formwork panels for the upper works of Kawasaki artificial island in Kanagawa Prefecture, 379 tons.Sources

Order and production of noise barrier for Hanshin Expressway Route 3 Kobe line, 243 tons.Sources

Order and production of waterproof wall of steel pipe connection road inside Kanda River inlet in Tokyo, 95 tons.Sources

Order and production of support pillars (Galeria) for Kameoka City Central Lifelong Learning Center, 502 tons.Sources

Order and production of new construction of 3 blast furnace raw material silos (iron ore silos) and hopper, 1,705 tons, for Kobe Steel Co., Ltd., from Mitsubishi Heavy Industries Co., Ltd. Hiroshima plant.Sources

Order and production of corner block for IRTYSH Bridge, 260 tons.Sources

Order and production of 4 main towers for Sakakibara Wind Power Plant in Kuji City, Mie Prefecture, 220 tons.Sources

Order and production of maintenance work for the lower part of Chikimori Bridge in Yamaguchi Prefecture, 232 tons.Sources

Order and production of box girder for Saitama Sub-City Center, 109 tons, from Miyaji Railway Works Co., Ltd.Sources

Order and production of girder continuous construction for Nagoya Expressway Public Corporation, 137 tons.Sources

Order and production of main girder for Hokusei BPJR elevated bridge, 101 tons, from Takigami Industrial Co., Ltd.Sources

Order and production of upper seismic reinforcement work for Nagoya Expressway Public Corporation, 232 tons.Sources

Order and production of gas holder accessories for Nippon Steel, 68 tons, from Mitsubishi Heavy Industries Co., Ltd. Hiroshima plant.Sources

Commenced ongoing frame production with Panasonic Factory Solutions Co., Ltd.Sources

Began manufacturing compressor steel-plate casings for Hiroshima Ryoju Engineering Co., Ltd.Sources

Began manufacturing aircraft jigs for Mitsubishi Heavy Industries, Ltd.'s Nagoya Aerospace Systems Works, commissioned by Churyo Engineering Co., Ltd.Sources

Received an order from Mitsubishi Heavy Industries, Ltd.'s Hiroshima Works and manufactured four 130-ton blowers for the Kamiyama Ventilation Station on the Shinjuku Line.Sources

Received an order from Yamaura Corporation and manufactured 160 tons of frame rails and a transfer trolley for Nippon Paper Industries.Sources

Received an order from JFE Engineering Corporation and manufactured 3,200 tons of legs for the JKT on the Haneda Airport connecting taxiway.Sources

Received an order from Universal Shipbuilding Corporation's Maizuru Works and manufactured main engine beds, generator beds, and crane posts for the Antarctic research vessel Shirase.Sources

Received an order from Choryo High-Tech Co., Ltd. and manufactured eight 200-ton blowers for the inward-bound track at Yoyogi on the Shinjuku Line.Sources

Began manufacturing beds and crowns for large presses for a manufacturer.Sources

Changed the company name from Kokubo Iron Works Limited to Kokubo Iron Works Co., Ltd.Sources

Manufactured adapters and other items for an HTV weight and center-of-gravity measuring device for Mitsubishi Heavy Industries, Ltd.'s Nagoya Guidance & Propulsion Systems Works, commissioned by Churyo Engineering Co., Ltd.Sources

Received ISO 9001:2000 certification (AUDIX Registrars; registration number: Q0082).Sources

Received an order from Hitachi Zosen Corporation and manufactured a 200-ton cluster stack at Cosmo Oil's Sakai Refinery.Sources

Received an order from Mitsubishi Heavy Industries Steel Structure Engineering Co., Ltd. and manufactured 106 tons of gas-holder accessories for Nippon Steel's Kimitsu Works.Sources

Received an order from Nippon Sharyo, Ltd. and manufactured 500 tons of sandwich composite deck slabs for the Tokushima East Circular Route.Sources

Began ongoing production of grizzlies for Nippon Steel's Nagoya Works in collaboration with a manufacturer.Sources

Received an order from Universal Shipbuilding Corporation's Keihin Works and manufactured 176 tons of stern rollers for four ships.Sources

Received an order from IHI Corporation and manufactured 30 tons of equipment for the No. 2 blast furnace project at Sumitomo Metal Industries' Wakayama Works.Sources

Received an order from Hishii Shoji Co., Ltd. and manufactured a Credor.Sources

Received an order from Churyo Engineering Co., Ltd. and manufactured two containers for F-2 aircraft for the Ministry of Defense.Sources

Received an order from a manufacturer and manufactured a 62-ton secondary combustion furnace for disaster waste treatment.Sources

Received an order from JFE Engineering Corporation and manufactured a 900-ton seawall for the Hamaoka Nuclear Power Plant.Sources

Received an order from Hitachi Zosen Corporation and manufactured an 82-ton flue duct for Nippon Steel Yawata.Sources

Received an order from JFE Engineering Corporation and manufactured 160 tons of JKT and grating for the Sendai Port quay wall.Sources

Began manufacturing 215 tons of outfitting items for the CANDO DRILLFHIP at IHI Corporation's Aichi Works.Sources

Began manufacturing 1,460 tons of tank support structures for four LNG vessels for Japan Marine United Corporation's Tsu Works.Sources

Began manufacturing 112 tons of external elevator shafts and external stairs for Nippon Steel & Sumitomo Metal's Kimitsu Works, commissioned by Mitsubishi Mechatronics Systems Co., Ltd.Sources

Began manufacturing four mobile work platforms totaling 200 tons for Mitsubishi Heavy Industries, commissioned by Tech Sasaki Co., Ltd.Sources

Began manufacturing and assembling 380 tons of plate wrapping for bridge piers in the Aoba district of the Yokohama Circular Northwest Route for JFE Engineering Corporation.Sources

Began manufacturing 65 tons of the stack shell and steel tower for the Hachijojima Internal Combustion Power Plant for Hitachi Zosen Corporation.Sources

Began manufacturing 172 tons for the Hekinan stack improvement project for Mitsubishi Heavy Industries Mechatronics Systems, Ltd.Sources

Began manufacturing a 172-ton S-6-type crane for the Sendai quay for JFE Engineering Corporation.Sources

Received an order from a manufacturer and manufactured a φ5,440 mm shield machine.Sources

Received an order from a manufacturer and manufactured accessories for a shield machine (three trailing cars and three steel-wheeled cars).Sources

Received an order from a manufacturer and manufactured a φ3,830 mm shield machine.Sources

Received an order from JFE Engineering Corporation and manufactured a φ4,039 mm shield machine.Sources

Received an order from JFE Engineering Corporation and manufactured two sets of main girders, totaling 99 tons, for Runway A at Haneda Airport.Sources

Received an order from a manufacturer and manufactured a φ2,310 mm shield machine.Sources

Received an order from Mitsubishi Heavy Industries Machinery Systems, Ltd. and manufactured an additional filtration holding tank for Asahi Breweries' Nagoya Plant.Sources

Received an order from JFE Engineering Corporation and manufactured 77 tons of longitudinal girders for the superstructure of the bridge on National Route 25 (Satsukibashi).Sources

Received an order from a manufacturer and manufactured a press frame for AMADA Co., Ltd.Sources

Received an order from Mitsubishi Heavy Industries Machinery Systems, Ltd. to expand a filtration tank at Asahi Breweries, Ltd.'s Nagoya Plant; manufactured the tank.Sources

Received an order from a manufacturer for a mobile pier for the Hokkaido Shinkansen; manufactured it.Sources

Received an order from a manufacturer for shield machine accessories (trailing cars and steel wheels); manufactured them.Sources

Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.Sources

Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.Sources

Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.Sources

Received an order from JFE Engineering Corporation for fabrication of 1,100 tons of temporary facilities for the bridge renewal project between Suita Junction and Chugoku-Ikeda Interchange; fabricated them.Sources

Received an order from JFE Engineering Corporation for fabrication of 200 tons of temporary facilities for the Kawachi River Bridge; fabricated them.Sources

Received an order from Meiko Construction Co., Ltd. for 320 tons of steel plate bending for seismic reinforcement work on the Onishi Interchange on-ramp bridge and three other bridges; completed the fabrication.Sources

Commenced production of ship outfitting components for a TEU-class container ship for Japan Marine United Corporation.Sources

Received an order from JFE Engineering Corporation for fabrication of a 161-ton steel caisson lifting frame for Mage Island; fabricated it.Sources

Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.Sources

Commenced production of ship outfitting components for a TEU-class container ship for Japan Marine United Corporation.Sources

Received an order from JFE Engineering Corporation for fabrication of 29 tons of temporary facilities for the superstructure work on Bridge No. 1 of Ramp A at Sakae Interchange/Junction on the Yokohama-Shonan Road; fabricated them.Sources

Commenced production of ship outfitting components for a DWT-class ore/bulk carrier for Japan Marine United Corporation.Sources

Commenced production of ship outfitting components for a TEU-class container ship for Japan Marine United Corporation.Sources

Received an order from JFE Engineering Corporation for fabrication of 84 tons of jigs for the superstructure work on the Yodogawa East Viaduct; fabricated them.Sources

Received an order from JFE Engineering Corporation for 923 tons of steel plate bending for the NTT Osaka utility tunnel; completed the work.Sources

Received an order from JFE Engineering Corporation for 121 tons of steel plate bending for a φ10,710 earth pressure balance shield machine for the Shimizu/Sotetsu Line undergrounding project; completed the work.Sources

Received an order from JFE Engineering Corporation for 0.7 tons of various bending work for the Kitatokyo Pedestrian Deck; completed the work.Sources

Start of production of ship fittings for DWT-type ore and bulk carrier from Japan Marine United Co., Ltd.Sources

Order and production of 1 ton of various bending processing for Shimizu Station Pedestrian Deck from JFE Engineering Co., Ltd.Sources

Start of production of ship fittings for DWT Suemac Stanker from Japan Marine United Co., Ltd.Sources

§07

News

12 ARTICLES

Incoming Mail Server Issue ResolvedSources

On January 10, 2023, heavy load on some Sun Internet incoming mail servers caused delays in email delivery. Emails affected during the incident are being delivered in order, and normal receipt has resumed. We apologize for the inconvenience.

Notice of Reception Mail Server Failure and RecoverySources

On January 10, 2023, high load caused delays on some of Sun Internet's reception mail servers. The failure has been recovered, and emails are being delivered sequentially. We apologize for the inconvenience caused to users.

Incoming Mail Server Issue ResolvedSources

High load made the incoming mail server difficult to access. An outage began at approximately 2:20 p.m. on November 3, 2021, and service was restored at 3:50 p.m. Emails affected during the outage are being delivered in order. We apologize for the inconvenience.

Notice of Reception Mail Server Failure and RecoverySources

On November 3, 2021, a failure caused by high load occurred on the reception mail server, lasting from around 14:20 to 15:50. It has now been recovered, and emails are being delivered sequentially. We apologize for the inconvenience caused to users.

Server Issue ResolvedSources

Some rental servers experienced an outage on Tuesday, October 22, 2019. It began at 5 p.m. and was resolved at 6 p.m. The service is now available as usual.

Notice of Server Failure and RecoverySources

On October 22, 2019, a failure occurred on some rental servers and was restored between 5:00 PM and 6:00 PM. Services are now available as usual.

Rental Server Issue ResolvedSources

Some rental servers experienced an outage at around 7:30 p.m. on July 10, 2019. Service was restored at around 11:30 p.m. and is now operating normally. We sincerely apologize for the inconvenience.

Notice of Rental Server Failure and RestorationSources

On July 10, 2019, a failure occurred on some rental servers, lasting from around 7:30 PM to around 11:30 PM. The issue has now been resolved, and services are being provided as usual. We apologize for any inconvenience caused by the failure.

Server Communication Issue ResolvedSources

A communication issue affected some server services at around 4 p.m. on January 12, 2019. The issue was resolved in about 50 minutes, and service is now operating normally. We sincerely apologize for the inconvenience.

Server Outage and Recovery NoticeSources

On January 12, 2019, communication failure occurred in some server services. The failure was restored after 50 minutes from 4:00 PM, and is now operating normally. We apologize for any inconvenience caused to users.

§08

Public records

GOV
National Tax Agency basic information3190001007758
Source: National Tax Agency Corporate Number Publication Site, basic three itemsSources
Trade name
株式会社小久保鉄工所
Trade name (kana)
コクボテッコウショ
Name in English
Corporation type
301
Address
〒517-0011 三重県鳥羽市鳥羽1丁目16番6号
Postal code
5170011
Prefecture code
24
City code
211
Address outside Japan
Prefecture in English
City in English
Address outside Japan in English
Corporate number assignment date
2015-10-05
Update date
2018-05-07
Change date
2015-10-05
Registry closure date
Reason for registry closure
Successor corporate number
Details of the change
Latest record
1
Excluded from search
0
Processing type
01
Correction type
1
Trade name image ID
Address image ID
Sequence number
3782314
METI gBizINFO3190001007758
Source: gBizINFO (Ministry of Economy, Trade and Industry)Sources
Corporate number
3190001007758
Trade name
株式会社小久保鉄工所
Trade name (kana)
コクボテッコウショ
Trade name (alphabet)
Registry closure date
Reason for registry closure
Registered address
三重県鳥羽市鳥羽1丁目16番6号
Postal code
5170011
Prefecture
三重県
Prefecture code
24
City or district
鳥羽市
City code
211
Street address
鳥羽1丁目16番6号
Organisation type
301
Processing type
01
Correction type
1
Status
Representative
Capital
Employees
63
Employees (male)
72
Employees (female)
3
Business summary
大物構造物加工 (大型製品の製作) ・船舶艤装品 ・橋梁 ・産業機械 ・火力煙突など
Website URL
http://kokubo.cc
Year founded
1958
Business category
E:製造業
Date established
Unified government qualification - grade
Unified government qualification - business items
Update date
2018-05-07
Key information
3190001007758
§09

Sources & updates

SOURCES
↑