Manufacture of industrial electric heating machineryManufacture of electric heatersManufacture of temperature control devicesManufacture of temperature measurement equipmentManufacture of hot air circulation dryersManufacture of baking furnacesManufacture of hot air generators
Names without a link are companies not yet registered in OpenBizGraph
§05
Network
NETWORK
Loading the relationship graph...
Drag to move · click to open
§06
History
15 EVENTS
Founded by Genjiro Umeda (former President and CEO) as a sole proprietorship in Higashikomatsugawa, Edogawa-ku
Relocated to Ichinoe, Edogawa-ku. Incorporated with capital of 600,000 yen
Established a parts factory in Shizuoka Prefecture due to business expansion
Built a new company building in Haruecho, Edogawa-ku, and moved headquarters
Established Tateyama factory due to business expansion
Built Chiba factory in Yachimata City, Chiba Prefecture, in preparation for future business expansion
Increased capital to 10 million yen
Received the Excellent Factory Award from Edogawa-ku
Consolidated Tateyama and Chiba factories into headquarters to improve productivity
Obtained ISO9001 certification
Expanded and relocated headquarters to Nishishinkoiwa, Katsushika-ku
Extended headquarters building due to business expansion
Toshiyuki Umeda appointed as President and CEO
ISO 14001 Certification Acquisition
Certified by the Ministry of Economy, Trade and Industry for Business Continuity Enhancement Plan
§07
News
23 ARTICLES
Notice of Holiday Closure for New Year's (December 26, 2026 – January 4, 2027)
Minamoto Electric Co., Ltd. will observe a holiday closure from December 26, 2026 to January 4, 2027 for the New Year. Production work will be suspended on December 25 for equipment maintenance, and while we will accept email inquiries during the holiday period, responses will be provided after business resumes.
Notice Regarding Outlook System Outage
Due to a Microsoft 365 system outage, Minamoto Electric Co., Ltd. is experiencing difficulties with checking and replying to emails in Outlook. Replies to inquiries and estimate requests may be delayed, and there is a possibility that emails have not been checked. Customers who need urgent assistance should contact us by phone (TEL: 03-5671-3710).
Notice of Outlook System Failure Recovery
The previously occurring Outlook email send/receive malfunction has been restored, and normal email sending and receiving is now possible. We deeply apologize for the delays in checking and replying to emails during the outage, which caused inconvenience and trouble.
Summer Holiday Notice (August 13–16, 2026)
Minamoto Electric Co., Ltd. will be closed for summer holidays from August 13 through 16, 2026. It will operate as usual on August 10 and 12 and be closed on August 11, a public holiday. Inquiries will be accepted during the closure and handled after business resumes.
Hot-Air Circulation Dryer and Baking Oven Renewed
Minamoto Electric renewed its hot-air circulation dryer and baking oven, changing the exterior color and control panel. Touchscreens were introduced to improve usability, and the product lineup was updated. See the individual product pages for details.
Business Suspension for Inventory
Minamoto Electric Co., Ltd. will suspend all operations for the full day on July 31, 2026, for its financial year-end inventory. Inquiries can be sent by fax or email, but replies may be delayed until the next business day.
Temporary Closure Due to Approaching Typhoon
Minamoto Electric Co., Ltd. will close for the entire day on June 3, 2026, because of an approaching typhoon. Normal business is scheduled to resume on June 4. Inquiries will still be accepted during the closure.
Minamoto Electric’s Equipment and Automation Initiatives
Minamoto Electric has in-house equipment for manufacturing industrial heaters and temperature control devices and works to improve automation and machining accuracy. It has automated hole drilling and tapping for protective tubes and can accommodate a range of specifications.
Minamoto Electric Golden Week Holiday Schedule for 2026
Minamoto Electric Co., Ltd. will be closed from May 2 through 6, 2026, and resume regular operations on May 7. Inquiries through the email form will be accepted during the closure and answered after business resumes.
Minamoto Electric Year-End and New Year Holiday Schedule
Minamoto Electric Co., Ltd. will be closed for winter holidays from December 27, 2025, through January 4, 2026. Manufacturing will stop on December 26 for equipment maintenance. Inquiries will be accepted during the holiday, and regular operations will resume January 5, 2026.
§08
Public records
GOV
National Tax Agency basic information3011801014878
Source: National Tax Agency Corporate Number Publication Site, basic three items
Trade name
ミナモト電機株式会社
Trade name (kana)
ミナモトデンキ
Name in English
Corporation type
301
Address
〒124-0025 東京都葛飾区西新小岩3丁目14番21号
Postal code
1240025
Prefecture code
13
City code
122
Address outside Japan
Prefecture in English
City in English
Address outside Japan in English
Corporate number assignment date
2015-10-05
Update date
2018-11-07
Change date
2015-10-05
Registry closure date
Reason for registry closure
Successor corporate number
Details of the change
Latest record
1
Excluded from search
0
Processing type
01
Correction type
1
Trade name image ID
Address image ID
Sequence number
1683319
METI gBizINFO3011801014878
Source: gBizINFO (Ministry of Economy, Trade and Industry)