Urawa Gakuin High School of Myojo Gakuen Educational Corporation was founded at 172 Yodoyama, Urawa City (now Saitama City), located east of Noda Sagayama and south of the historic castle site of the warlord Okubo Naozane of Ota Dogen. Principal: Yasuhiro Takahashi. Campus area: 21,521 m². Athletic field: 19,800 m² (second ground lease). Temporary school buildings: 3 units, 1,154 m².
School anthem established
First school building completed, 6,093 m². Golf practice field completed (60-year renovation, 16 bays).
Club rooms and dormitory completed
School flag established
Nasu Ground opened, 13,650 m² (2 dormitories, 50 capacity). Nasu Onsen dormitory opened, 650 m² (2 dormitories, 150 capacity).
Second school building completed, 1,823 m²
Third ground acquired, 18,880 m²
Third school building completed, 2,851 m². Gymnasium completed, 1,989 m². Rain‑proof gym completed, 1,194 m² (58‑year renovation). Student hall (including cafeteria, etc.) 571 m²
Kyudo hall completed, 110 m²
Chuo Alps Komagane dormitory and summer school opened in Komagane City, Nagano Prefecture, 1,110 m² (6 dormitories, 200 capacity).
New pottery studio completed, 148 m²
New judo dojo completed, 340 m²
Fourth school building completed, 3,582 m²
Sarusagi Memorial Natural History Museum completed, 869 m²
Expansion of Chuo Alps Komagane dormitory
Urawa Gakuin High School cooperative dormitory opened. West Urawa ground acquired, 18,245 m²
Glorious monument finished (graduation memorial). Awarded the Glory Prize by the Saitama Prefecture Physical Education Association
Fourth ground acquired, 18,360 m² (lease 2,332 m²)
Completion of the Memorial Monument (Baseball: Ken Suzuki, Tennis: Fumiko Yamazaki)
Expansion of the Clubroom
Opening of the Nishi-Urawa Dormitory at Urawa Gakuin
Adoption of the Cheer Song
Completion of the Memorial Monument (Men's Handball)
Completion of the Prefabricated Building / 393m²
Expansion of the Clubroom (Sumo Arena) / 166m²
Expansion of the Calligraphy Room and Storage / 2 buildings
Completion of the Memorial Monument (Figure Skating: Naoki Shigematsu)
Completion of the 5th Ground / 6,597m²
Opening of the Terayama Training Camp / 338m²
Principal Katsuhiro Takahashi Resignation
Principal Takamitsu Sekine Appointment
Renovation of the 1st Ground / 2,600m²
Closure of the Komagane Training Camp
Partial Sale of the 5th Ground to Urawa City for Reservoir Land / 4,328m²
Expansion of the 5th Ground / 3,063m²
Principal Takamitsu Sekine Resignation
Principal Kiyoshi Kuroiwa Appointment
Change of Address Display Due to the Merger of Three Cities: "Urawa City" → "Saitama City"
School camp facility demolition, pottery studio demolition / 148m², club cafeteria building completed / 188.5m²
School bus stop completed, main gate renovation
Erected a monument to the school motto (beside the main gate)
January 2002, bicycle parking lot completed (two‑storey steel frame clubroom attached) / 179 bikes (1,025.34m²), 11 clubrooms (423.88m²)
Principal Kuroiwa Yukio retired
Principal Naito Hideo appointed
Erected a monument to the founding of the school (donated by 2011 graduates) acquired land for pitching practice / 1,520m², acquired land for the Shirasagi Museum parking / 2,263.08m², acquired land beside the Kyoshi dormitory parking / 720m²