Construction of cinema, October construction progress and community collaboration
In October, the exterior wall painting and installation of interior partition walls progressed, and insulation material was installed on the theater wall. Students from Nozawa Kita High School set up a stall at a local event, and about 25 students from Nozawa Minami High School used approximately 2,000 pieces of locally produced cedar wood to create a world map on the wall of the cinema under construction.