Open company graph database — free web & API
Login

Tokushima Regional Energy General Incorporated Association

一般社団法人 徳島地域エネルギー
Ticker
—
Listed market
—
Country
Japan
Employees (non-consolidated)
—
Related companies
0
§01

Basic information

BASIC
Head office
Sources
Chief executive
Kazuomi ToyookaSources
Capital
Employees (non-consolidated)
Employees (consolidated)
Start date
2012-03-30
End date
§02

Websites

1 DOMAINS
§03

Business

18
Solar PowerSourcesBiomassSourcesSmall HydropowerSourcesWind PowerSourcesPlanning, Implementation, and Operational Support for Energy BusinessesSourcesSolar Power Generation BusinessSourcesBiomass Power Generation BusinessSourcesSmall Hydropower Generation BusinessSourcesWind Power Generation BusinessSourcesPlanning, Implementation, and Operational Support for Renewable Energy BusinessesSourcesConsulting for Natural Energy PromotionSourcesSolar Power GenerationSourcesWood Biomass Heat UtilizationSourcesSmall Hydropower GenerationSourcesWind Power GenerationSourcesMaintenance of Solar Power Plants and Small Hydropower PlantsSourcesImport Agency Business for Biomass Boilers from Austria ETA Co., Ltd. and OthersSourcesSurvey, Design, Installation, and Maintenance of Wood Biomass EquipmentSources
§04

Related companies

0 COMPANIES

—

§05

Network

NETWORK
Drag to move · click to open
§07

News

12 ARTICLES

Installation of Biomass Boiler at Fujiya Hotel Sengoku Golf CourseSources

Two wood chip boilers, eHACK 240kW, have been installed at the Fujiya Hotel Sengoku Golf Course to heat the bath and provide hot water. The former heavy oil steam boiler has been removed, and the operation of the biomass boiler is expected to reduce CO₂ emissions by approximately 284 tonnes annually.

Integration into the Sanakawachi Office (Closure of Izu-machi Office)Sources

On June 28, 2023, the office located in Izu-machi, Tokushima City was integrated into the Sanakawachi (Lab) and relocated as of July 1. The new contact number is TEL 050-2024-5033.

Public Call for the 2022 Supplementary Budget Grant for "Energy Efficiency Investment Promotion and Demand Structure Transformation Support Project Costs"Sources

The public call for the 2022 Supplementary Budget grant for Energy Efficiency Investment Promotion and Demand Structure Transformation Support Project Costs has begun. The application period is from March 27, 2023 to April 24, 2023, with a subsidy rate of up to two-thirds for small and medium-sized enterprises and up to one-half for large enterprises. Details can be confirmed on the official website.

Tokushima Regional Energy Commemorative Lecture Announcement (March 21)Sources

Tokushima Regional Energy is celebrating its 10th anniversary, and will hold a commemorative lecture on March 21, 2023 (Holiday, Tuesday) from 2:00 PM to 4:00 PM at JR Hotel Clement Tokushima. Professor Katsu Kaneko will speak on the future of energy and the region, taking into account economic and social issues. Please contact us by email or phone if you wish to attend.

Environmental Seminar for High School Students Held at Kobe Biomass LabSources

At the newly opened Kobe Biomass Lab in Yano Town, Kobe, an environmental seminar for high school students organized by Hyogo Prefecture was held. In the morning, participants toured the drying system and biomass boiler, and received lectures in the training room. In the afternoon, they visited logging sites, a solar sharing farm, and a clean center, learning about Hyogo Prefecture's environmental policies through these tours.

Production of Drying System Test Chips is AdvancingSources

In a demonstration experiment where chips are produced in a rural area and moisture content is adjusted using a biomass boiler-based drying system, the production of chips is progressing. The most common species in the chipped trees are oak and sycamore.

Trial Logging for Hardwood Chip ProductionSources

In the Hokusetsu Satoyama Regional Circular and Ecological Sphere, trial logging is underway in a prefectural forest’s hardwood stands in preparation for a demonstration project using hardwood chips for biomass heating. The plan is to first build a forest road and then carry out row thinning.

Advanced Equipment Subsidy and ETA Wood Chip BoilerSources

We provide information about a subsidy that supports part of the cost (equipment cost) for switching to energy-saving equipment designated as advanced equipment. The application period is from May 25, 2022 to June 30, 2022, and the ETA wood chip boiler is designated as advanced equipment. It is essential to combine it with a dedicated layered thermal storage tank, and it claims to reduce or convert almost 100% of the fossil fuel used during operation.

Tokushima Regional Energy: Public Offering Overview for Energy Efficiency Equipment Renewal SubsidySources

During the public offering period from May 25, 2022 to June 30, 2022, the Ministry of the Environment will accept applications for energy efficiency equipment renewal projects based on its review criteria. The subsidy covers only equipment costs, with a subsidy rate of up to 10% for small and medium-sized enterprises and up to 3% for large enterprises. The subsidy decision is scheduled for late August 2022, and the project period runs from the decision date until January 31, 2023.

Advanced Energy Conservation Investment Promotion Support Project Public Offering BeginsSources

The public offering for the 2022 "Advanced Energy Conservation Investment Promotion Support Project" began on May 25 and will run until June 30. The subsidy rate is set at up to 10% of equipment costs for small and medium-sized enterprises and 3–4% for large enterprises. Applications should be submitted to the Environmental Coexistence Initiative (SII), and details can be found on the official website.

§09

Sources & updates

SOURCES
↑