Hospital relocation and opening (Dan-yamamoto-machi, Kumamoto City) (50 beds: 20 general, 30 tuberculosis)
Opening of short-term health checkup
Approval of 140 additional beds (80 general, 60 tuberculosis)
Opening of neurosurgery (now Stroke Center) and approval of 193 additional beds (165 general, 28 tuberculosis)
First expansion project (6,361.40 square meters), approval of 176 additional beds (148 general, 28 tuberculosis)
Start of hemodialysis
Conversion of tuberculosis beds to general use (176 general beds), second expansion project (1,067.103 square meters)
Opening of gastroenterology (now Digestive Disease Center)
Opening of cardiology (now Cardio-Vascular Center)
Gynecology closed for maintenance, CT scanner installed
Third expansion construction, 300-bed expansion approved (general 300 beds)
350-bed expansion approved (general 350 beds): Cardiovascular surgery (now Cardiovascular Center) incorporated into Cardiology Department
400-bed expansion approved (general 400 beds)
Mixed surgery (emergency) ward (now Emergency: General: Treatment: Center) opened
Integrated medical and diagnostic department opened
New hospital construction commenced
All-new nursing (2-to-1 nursing) approved
New hospital opened (515 Konomichi, Kumamoto City) (40,074.86 square meters): 60th anniversary celebration
North building expansion construction commenced (disaster base hospital storage warehouse preparation): Address changed to 5-3-1 Konomichi due to land parcel change
Gamma Knife introduced, treatment started
Acute phase specific add-on approved
FY2001: New health check center construction commenced: National Rehabilitation Center Triangle Hospital transfer approved
FY2002: Branch Kumamoto Prefecture Saiseikai Board established: New health check center opened: Emergency outpatient, operating room expansion (to 10 rooms), outpatient treatment room installed
FY2005: Respiratory Center, Tumor & Diabetes Center opened: 70th anniversary celebration
FY2006: DPC target hospital, regional medical support hospital approved: Outpatient cancer treatment center construction commenced
FY2007: Outpatient cancer treatment center completed
FY2008: Regional cancer treatment collaboration base hospital approved: Hospital function evaluation (Ver5.0) reviewed, certification obtained: Day surgery & treatment room operational start
2009: Expansion of the operating room (to 12 rooms)
2010: Designation as a Life-Saving Emergency Center: Opening of the in-hospital childcare center "Haato Land"
2011: Introduction of electronic medical records: Opening of the Consultation Support Center (now the Medical Welfare Consultation Room): Establishment of intensive care unit system
2013: Introduction of the da Vinci surgical support robot: Hybrid operating room introduced for JCI review and certification: Hospital function evaluation (Ver.1.0) reviewed and certified (certification period: August 18, 2013 – August 17, 2018): Opening of the emergency workstation: Establishment of the staff health management office
2014: Review and certification of the health check facility function for the Human Dock: Start of construction of the education and training center
2015: 100th anniversary lecture of the Clinical Pathway Conference: Opening of the education and training center: Review and certification of post‑graduate clinical training evaluation (JCEP): 80th anniversary of establishment
2017: Personnel exchange agreement with Tantosken Hospital: JCI review and certification renewal: Establishment of the comprehensive medical department
2018: Acquisition of certification as a hospital comprehensive medical education program facility: Introduction of the linear accelerator for radiation therapy and start of treatment: Opening of the comprehensive medical department
2019: Opening of the robot and minimally invasive surgery center: Renaming of the neurology department to Neuro‑Neurology: Announcement of health declaration: JCI certification renewal
2020: 20th Clinical Pathway Society conference: Opening of the integrated cancer treatment center: Start of specific activity training: 85th anniversary of establishment
2021: Designation as a cancer genome medical collaboration hospital: Opening of the comprehensive oncology department, cancer genome center, and palliative care center: Revision of the philosophy and basic policy
2022: Registration as a second‑phase SDGs registrant in Kumamoto Prefecture: ISO15189 certification of the central laboratory: Opening of the catheter and minimally invasive vascular treatment center (CLIEvtC): JCI certification renewal
2023: Renovation of the outpatient cancer treatment center
2024: 76th Japanese Society of Surgery conference and 2024 Japanese Society of Surgery annual meeting: Introduction of the third da Vinci surgical robot (first in southern Kyushu)
2025: Establishment of the clinical research center: 90th anniversary of establishment: Start of program and CM broadcasting: Renewal of the recruitment website: JCI certification renewal
§07
News
2 ARTICLES
The Value Created by AI and the Value Created by Humans
The author reflects on the transition from an industrial society to an information society, stating that modern economics and society are driven by value emerging from information. He discusses the rapid development of generative AI, particularly using GPT-4o as an example of its response capabilities, and touches on the possibility that AI’s increasing abilities bring us closer to singularity.
War and Medicine Are Data-Driven
Using the conflict between Russia and Ukraine as an example, it points out that the amount of information and the speed of analysis determine the course of the war, and argues that medicine is similarly data-driven. It cites a lecture by Professor Nakajima of Kyushu University and explains that big data becomes the driving force that moves society as a whole.