Aluminum Corporation of China Limited
Basic information
Websites
Business
Related companies
| Company name | Group | Parent | Subsidiary | Customer | Supplier | Alliance | Bank | Shareholder |
|---|---|---|---|---|---|---|---|---|
|
中国铝业中铝香港有限公司
|
||||||||
|
中国铝业甘肃铝电有限责任公司
|
||||||||
|
中国铝业贵州分公司
|
||||||||
|
中国铝业遵义氧化铝有限公司
|
||||||||
|
中国铝业香港有限公司
|
||||||||
|
中铝西南铝企业
|
||||||||
|
中铝贵州企业
|
||||||||
|
西南铝
|
||||||||
|
|
||||||||
|
|
||||||||
|
俄罗斯铝业
|
||||||||
|
|
||||||||
|
清镇市工业投资有限公司
|
||||||||
|
贵州产业投资(集团)有限责任公司
|
||||||||
|
云铝股份
|
||||||||
|
萨帕集团
|
Network
History
China Aluminum Company (Preparatory) held a meeting on asset restructuring and overseas listing. Representatives from China International Finance Co., Ltd., Morgan Stanley, and other intermediaries attended.![]()
Vice Premier Wu Bangguo heard a report from Guo Shengkun, head of the China Aluminum Company preparatory group, on the restructuring and listing work.![]()
A temporary shareholders' meeting of China Aluminum Co., Ltd. was held in Beijing. Chairman Guo Shengkun presided. Representatives from China Xinda Asset Management, Oriental Asset Management, China Development Bank, Guangxi Development Investment Co., Ltd., Guizhou Provincial Material Development Investment Co., and executives Liang Zhongxiu, Xiong Weiping, Wu Weicheng, Ding Haiyan, Vice President Li Henglong, Zhang Chengzhong, and Chen Jihua attended. The meeting reviewed and approved 11 proposals, including the debt‑to‑equity conversion of China Aluminum Company, the conversion of China Aluminum Co., Ltd. to an overseas‑raised and listed company, and the new articles of association.![]()
China Aluminum Co., Ltd. shares were officially listed on the Hong Kong and New York stock exchanges.![]()
China Aluminum Co., Ltd. (traded as China Aluminum) was selected as a constituent of the Hang Seng Composite Index, effective March 1.![]()
The board of directors of China Aluminum Co., Ltd. convened in Beijing, chaired by Chairman, President and CEO Guo Shengkun. Senior Executive Directors Liang Zhongxiu and Xiong Weiping, Director Wu Weicheng, Independent Directors Wang Dianzhuo and Zhao Zhizhan, and Board Secretary Ding Haiyan attended.![]()
Standing Committee member of the Politburo and Vice President Hu Jintao inspected the production site of China Aluminum’s Qinghai branch and held a discussion.![]()
Metal Bulletin ranked the top 30 global non‑ferrous metal companies for 2001, placing China Aluminum at 22nd, a five‑place improvement over the previous year. China Aluminum is the only Chinese non‑ferrous metal company in the top 30.![]()
Standing Committee member of the Politburo and Vice Premier Huang Ju inspected Southwest Aluminum (Group) Co., Ltd.![]()
Standing Committee member of the Politburo and Secretary of the Central Commission for Discipline Inspection Wu Guanzheng inspected Qinghai Aluminum.![]()
Standing Committee member of the Politburo and Chairman of the National Committee of the CPPCC Jia Qinglin inspected China Aluminum’s Guizhou branch.![]()
Standing Committee member of the Politburo and Vice Premier Huang Ju visited China Aluminum’s Guizhou enterprise for inspection.![]()
Comrade Guo Shengkun was transferred to work in Guangxi Zhuang Autonomous Region; Comrade Xiao Yaqing was appointed General Manager and Party Secretary of China Aluminum Co., Ltd.![]()
China Aluminum Co., Ltd. held its 2003 Shareholders’ Annual Meeting in Beijing. The new board of directors, composed of eight directors, was approved by the shareholders. The new board members were Executive Directors Xiao Yaqing, Xiong Weiping, Luo Jianchuan, Chen Jihua; Non‑Executive Directors Chen Xiaozhou, Joseph C. Muscari; and Independent Non‑Executive Directors Zhao Zhizhan, Wang Dianzhuo. Subsequently, the second board of China Aluminum held its first meeting and elected Xiao Yaqing as Chairman and CEO.![]()
China Aluminum Co., Ltd. held its 2005 Work Meeting. Prior to the meeting, Standing Committee member of the Politburo and Vice Premier Huang Ju issued important instructions, fully affirming the company’s work.![]()
The first world‑class hot‑rolling continuous casting line in China was completed and inaugurated with a ribbon‑cutting ceremony at Southwest Aluminum.![]()
Baotou Aluminum’s shares were listed on the Shanghai Stock Exchange. Baotou Aluminum became the first listed stock in the industry after the resumption of new share issuance under national macro‑policy regulation.![]()
Business Week, a globally influential economics magazine, released its first "Asian Listed Companies Annual Ranking," ranking China Aluminum Co. third among the 50 mainland Chinese enterprises included.![]()
Li Changchun, a member of the Standing Committee of the CPC Central Committee, inspected China Aluminum's Guizhou enterprise.![]()
China Aluminum Co. was jointly rated the "Most Influential Enterprise of 2006" by the China Enterprise Federation and the China Entrepreneurs Association.![]()
The inaugural Central Enterprise Youth Innovation Award ceremony of the "China Aluminum Cup," jointly organized by the Central Enterprise Youth Work Committee, the Central Enterprise Youth League, the National Science and Technology Award Office, and the China Enterprise Federation, was grandly held at the Great Hall of the People.![]()
China Aluminum Co. was awarded the Public Welfare Star Unit by the China Children and Youth Foundation and the China Women Development Foundation.![]()
Wang Zhaoguo, a member of the CPC Central Committee, Vice Chairman of the Standing Committee of the National People's Congress, and Chairman of the All-China Federation of Trade Unions, inspected Northeast Light Alloy Co., Ltd.![]()
Li Keqiang, a member of the CPC Central Committee and Vice Premier, inspected China Aluminum's Lanzhou branch. He was accompanied by Guizhou Provincial Party Secretary Lu Hao and Governor Xu Shousheng.![]()
The Organization Department of the CPC Central Committee held a cadre conference for China Aluminum in Beijing. Wang Ercheng, Deputy Minister of the Organization Department, announced the decision on leadership changes at China Aluminum: Xiao Yaqing would no longer serve as General Manager and Party Secretary, and Xiong Weiping would take over those roles.![]()
Liang Guanglie, a member of the Central Military Commission, State Councilor, and Minister of National Defense, led a research team to inspect China Aluminum's Southwest Aluminum enterprise.![]()
The revolutionary achievement in aluminum electrolytic technology—new structural electrolytic cell technology—developed over six years by the Zhengzhou Research Institute passed the technology assessment organized by the Nonferrous Metals Industry Association, reaching an internationally leading level.![]()
The "China Aluminum Co. Alumina Production Process Comprehensive Automation System High-Tech Industrialization Demonstration Project," primarily undertaken by the Shanxi branch, received the "National High-Tech Industrialization Demonstration Project" award.![]()
Li Changchun, a member of the CPC Central Committee Standing Committee, and Li Keqiang, a member of the CPC Central Committee Standing Committee and Vice Premier, visited the China Aluminum Co. booth at the 2010 China Green Industry and Green Economy High-Tech International Expo under the accompaniment of relevant ministry leaders.![]()
China Aluminum Co. signed a joint venture agreement in Beijing with the SAPA Group for special aluminum materials for rail transit.![]()
China Aluminum Co.'s Guangxi branch was designated as one of the first national demonstration bases for comprehensive utilization of mineral resources.![]()
China Aluminum Co. was recognized as a demonstration unit for the implementation of the General Classification Standard of Enterprise Accounting Standards.![]()
Former CPC Central Committee Standing Committee member, Secretary of the Central Secretariat, Secretary of the Central Commission for Discipline Inspection, and Chairman of the All-China Federation of Trade Unions Wei Jianxing visited Dongqing Co. twice.![]()
The former member of the Standing Committee of the CPC Central Committee, Secretary of the Central Secretariat, Secretary of the Central Commission for Discipline Inspection, and Chairman of the All-China Federation of Trade Unions, Wei Jianxing, visited Dongqing Company twice.![]()
Southwest Aluminum assisted the "Shenzhou 9" launch, providing essential aluminum alloy materials and structural components for the spacecraft.![]()
The high‑efficiency Bayer process technology research and industrial application achievements completed by China Aluminum Corporation were certified, and the overall process technology reached an internationally leading level.![]()
China Aluminum Corporation received the 2012 China Securities Gold Zijing Award for "Most Influential Overseas Listed Company."![]()
The company released its corporate culture achievements. The corporate culture system covers ten core concepts, ten management principles, six behavioral advocacies, six work guidelines, and six etiquette norms.![]()
The Chinese Academy of Social Sciences released the "Corporate Social Responsibility Blue Book (2013)", and China Aluminum Co., Ltd. ranked in the top 20 of the 2013 China Corporate Social Responsibility Development Index.![]()
From January 17 to 18, 2014, the "600 kA Ultra‑Large Capacity Aluminum Electrolytic Cell Technology R&D" project passed the national science and technology ministry’s project acceptance, achieving internationally leading technology.![]()
On July 14, 2014, Fortune China published its 2014 China 500 ranking, placing China Aluminum Co., Ltd. at 27th.![]()
On August 16, 2014, Southwest Aluminum successfully developed an 11‑meter‑long ultra‑large aviation‑grade advanced plate, filling a domestic gap in similar products.![]()
The company held a cadre conference, and Comrade Ge Honglin was appointed Chairman and Party Group Secretary of China Aluminum Company.![]()
On April 10, 2015, Southwest Aluminum successfully developed the first 9‑meter‑class ultra‑large aluminum alloy ring component for a new type of launch vehicle. It is the largest aluminum alloy ring component worldwide to date.![]()
On June 17, 2015, China Aluminum Co., Ltd. disclosed the results of its private placement of shares and the changes in its share capital, marking the successful completion of its three‑year A‑share private placement.![]()
On July 8, 2015, Fortune magazine released its "China 500" ranking for 2015, placing China Aluminum Co., Ltd. at 33rd.![]()
On April 12, 2016, the Phase II project of Shanxi Huaxing Alumina was commissioned, marking the world's first single-series million-ton-level one-water hard alumina production line completed in 8 months.![]()
On September 19, 2016, China Aluminum held its first Party Representative Conference, establishing the Party Committee and Discipline Inspection Committee of China Aluminum Co., Ltd., and electing the first Party Committee and Discipline Inspection Committee members.![]()
On March 16, 2017, China Aluminum's first electrolytic waste tank lining harmless treatment production line was successfully commissioned in Baotou Aluminum, demonstrating advanced domestic technology for treating hazardous waste from aluminum electrolytic tank repairs.![]()
On March 23, 2017, China Aluminum invested in the Guizhou Light Alloy New Material Retired City Project, signing an investment cooperation agreement with private enterprise Hangzhou Jinjiang Group Co., Ltd., local state-owned Guizhou Industrial Investment (Group) Co., Ltd., and Qingzhen Industrial Investment Co., Ltd. to accelerate capacity transfer and upgrade, enhancing competitiveness. On May 8, 2017, China Aluminum and China Merchants International Trust Co., Ltd. established an industrial investment fund of 2 billion RMB.![]()
On June 28, 2017, China Aluminum Shanxi Branch merged with Shanxi Huaze Aluminum Electric Co., Ltd., integrating alumina and electrolytic aluminum enterprises in the Hejin area to realize synergies and reduce operating costs.![]()
On August 12, 2017, China Aluminum Hong Kong Ltd. signed a supplementary agreement for bauxite development cooperation with Guinea's Ministry of Mines, National Mining Company, in Beijing, marking a good start for China Aluminum's two-ocean strategy.![]()
On September 8, 2017, China Aluminum and China Pacific Insurance Group Co., Ltd. jointly established the Pacific-China Aluminum Credit Investment Plan, with a scale not exceeding 10 billion RMB.![]()
On January 11, 2018, China Aluminum's 3N aluminum achieved mass production. In 2017, the production of 3N aluminum exceeded 20,000 tons, making it the first domestic enterprise to produce 3N aluminum on a large scale.![]()
On February 22, 2018, China Aluminum successfully developed high-purity submicron alumina, which entered mass production and sales.![]()
On June 8, 2018 (local time in Guinea), China Aluminum Zhonglu Hong Kong Ltd. signed a mining agreement for the Boffa project with the Guinean government, marking a new journey in China Aluminum's global strategic development.![]()
On June 21, 2018, China Aluminum merged its wholly-owned subsidiary China Aluminum Zunyi Alumina Co., Ltd. with Zunyi Aluminum Co., Ltd. to enhance market competitiveness and risk resilience.![]()
On July 30, 2018, China Aluminum issued 2.119 billion shares at 6 RMB per share through a private placement, totaling about 12.7 billion RMB.![]()
On August 17, 2018, China Aluminum transformed its Lanzhou Branch into a subsidiary by transferring all assets and liabilities to its wholly-owned subsidiary China Aluminum Gansu Aluminum Electric Co., Ltd. (later renamed Lanzhou Aluminum Co., Ltd.), strengthening market competitiveness.![]()
On October 28, 2018, China Aluminum's first overseas large-scale aluminum project—the Guinea Boffa bauxite mine—commenced, marking a breakthrough in establishing an "overseas Zhonglu".![]()
On November 1, 2018, China Aluminum's first coastal aluminum industrial base project—the Guangxi Huasheng 2 million-ton alumina project—commenced in Fangchenggang.![]()
On May 6, 2019, the China Aluminum Zhengzhou Research Institute's ecological reclamation technology for red mud piles achieved low-cost, rapid ecological restoration of the red mud piles, reaching an internationally advanced level.![]()
On August 2, 2019, Fitch Ratings upgraded the credit rating of China Aluminum Co., Ltd. from "BBB+" to "A-" with a stable outlook, the highest rating in the global nonferrous metals industry.![]()
On August 7, 2019, China Aluminum successfully issued a 10-year corporate bond, raising 2 billion RMB.![]()
On August 21, 2019, the first production line of the alloying project at China Aluminum Guizhou Branch was completed and put into operation, marking a new progress in the branch's transformation and upgrade.![]()
On September 3, 2019, China Aluminum successfully issued a 3-year corporate bond, raising 1 billion RMB.![]()
On December 19, 2019, China Aluminum subscribed to 314 million shares of Yunlu Aluminum at a price of 4.10 RMB per share, totaling 1.287 billion RMB. After the subscription, China Aluminum held about 10.04% of Yunlu Aluminum's total shares.![]()
On February 26, 2020, the first alumina mine ship of the China Aluminum Guinea Bofang project was officially unloaded at Rizhao Port, marking the completion of the entire process of alumina mining and transportation back to China. This was a solid step forward for China Aluminum's 'Two Seas' strategy.![]()
On April 6, 2020, the China Aluminum Guinea Bofang project, the largest alumina mine project invested by China in Guinea, was fully connected and put into operation.![]()
On April 26, 2020, the 200 kA electrolytic series 2203 rectifier unit at Lanzhou Aluminum was successfully energized, marking the first success of domestic non-stop power rectification technology transformation.![]()
News
There is no news.