Renova Co., Ltd.

株式会社レノバRENOVA, Inc.Alias
Ticker
Listed market
TYO
Country
Japan
Employees (consolidated)
315
Related companies
52
§01

Basic information

BASIC
Head office
18F, Keibashi Edglen, 2-2-1 Keibashi, Chuo-ku, Tokyo 104-0031, Japan
Chief executive
Yousuke Kimina
Capital
11,354,000,000  (113 100 million)
Employees (non-consolidated)
233 people
Employees (consolidated)
315 people
Start date
2000-05-30
End date
§02

Websites

2 DOMAINS
§03

Business

7
Renewable energy business, including GX business such as energy storage batteriesCorporate PPASolar power generationEnergy storage businessWind power generationBiomass power generationGeothermal power generation
§04

Related companies

52 COMPANIES
Company name Group Parent Subsidiary Customer Supplier Alliance Bank Shareholder
Renova USA Inc.
Group
Renova Asset Management Co., Ltd.
Group
Futtsu Solar Corporation
Group
Suigo Itako Solar Co., Ltd.
Group
Kikukawa Horinouchi Valley Solar Co., Ltd.
Group
Kikugawa Ishiyama Solar Co., Ltd.
Group
Nasu Karasuyama Solar Anonymous Partnership Business
Group
Godo Kaisha Ishinomaki Hibari-no Biomass Energy
Group
Kanda Biomass Energy Co., Ltd.
Group
Mori no Miyako Biomass Energy LLC
Group
Karatsu Biomass Energy LLC
Group
Reihoku Wind Power LLC
Group
Fukushima Reconstruction Wind LLC
Group
Tokushima Tsuda Biomass Power Plant LLC
Group
Minami-Aso Yunotani Thermal Inc.
Group
Gomezaki Port Biomass Energy LLC
Group
LIEN LAP WIND POWER JOINT STOCK COMPANY
Group
PHONG HUY WIND POWER JOINT STOCK COMPANY
Group
PHONG NGUYEN WIND POWER JOINT STOCK COMPANY
Group
RENOVA RENEWABLES ASIA PTE. LTD.
Group
RENOVA Renewables Korea Co., Ltd.
Group
Renova Renewables Philippines Inc.
Group
United Renewable Energy Co., Ltd.
Group
九重ソーラー匿名組合事業
Group
Hitoyoshi Solar Anonymous Cooperative Business
Group
四日市ソーラー匿名組合事業(三重)
Group
大津ソーラー匿名組合事業
Group
第一太陽光発電合同会社(東京)
Group
軽米尊坊ソーラー匿名組合事業
Group
軽米東ソーラー匿名組合事業
Group
軽米西ソーラー匿名組合事業
Group
那須塩原ソーラー匿名組合事業
Group
(ベトナム・クアンチ)
PT RENOVA RENEWABLES INDONESIA
RENOVA VIETNAM COMPANY LIMITED
その他の法人
九重ソーラー匿名組合事業(大分)
Sumitomo Forestry Co., Ltd.
外国法人等
大津ソーラー匿名組合事業(熊本)
Japan Master Trust Bank Ltd.
Tokyo Gas Co., Ltd.
株式会社富津ソーラー(千葉)
Japan Custody Bank Inc.
株式会社水郷潮来ソーラー(茨城)
株式会社菊川堀之内谷ソーラー(静岡)
株式会社菊川石山ソーラー(静岡)
軽米尊坊ソーラー匿名組合事業(岩手)
軽米東ソーラー匿名組合事業(岩手)
軽米西ソーラー匿名組合事業(岩手)
那須塩原ソーラー匿名組合事業(栃木)
Suzuyo Trading Co., Ltd.
Names without a link are companies not yet registered in OpenBizGraph
§05

Network

NETWORK
Drag to move · click to open
§06

History

149 EVENTS

Established Recycling One Co., Ltd. (now our company) with a capital of 100 million yen in Akasaka, Minato-ku, Tokyo, for research and consulting in the environmental and energy sectors.Sources

Established Recycle One, Inc. (now RENOVA) at Akasaka, Minato-ku, Tokyo with capital stock of 10 million yen for the purpose of conducting survey and consulting business operations in the environmental and energy fields.Sources

Established Recycling One Co., Ltd. (now our company) in Akasaka, Minato-ku, Tokyo, with a capital of 100 million yen, for environmental and energy consulting.Sources

Moved headquarters to Sakuragaoka-cho, Shibuya-ku, Tokyo.Sources

Relocated head office to Sakuragaoka, Shibuya-ku, TokyoSources

Established Eco Factory Co., Ltd. (Saitama Prefecture) (transferred) and Green Loop Co., Ltd. (Shizuoka Prefecture) (transferred) to enter the plastic recycling business.Sources

Established Ecos Factory, Inc. (Saitama, ownership now transferred) and Green Loop, Inc. (Shizuoka, ownership now transferred) for the purpose of entry into the Plastic Recycling Business.Sources

Started container and packaging recycling operations at Eco Factory Co., Ltd. (transferred) and Green Loop Co., Ltd. (transferred).Sources

Commenced container recycling operations at Ecos Factory, Inc. (ownership now transferred) and Green Loop, Inc. (ownership now transferred).Sources

Moved headquarters to Shibuya, Shibuya-ku, Tokyo.Sources

Relocated head office to Shibuya, Shibuya-ku, TokyoSources

The newly established Sunwell Co., Ltd. (transferred) inherited the business of Sunwell Ltd. (formerly a limited company) through absorption division and started compound operations.Sources

Commenced compound business operations inherited by the newly established Nissen K.K. (ownership now transferred) from the former Nissen Y.K. in an absorption-type split.Sources

Entered the renewable energy business.Sources

Entered the renewable energy business.Sources

Based on entering the renewable energy business, changed the company name to the current Renova Co., Ltd.Sources

Moved headquarters to Otemachi, Chiyoda-ku, Tokyo.Sources

Changed company name to the current name RENOVA, Inc. in light of its entry into the renewable energy business.Sources

Relocated head office to Otemachi, Chiyoda-ku, TokyoSources

Changed our company name to Renova Co., Ltd. and moved headquarters to Otemachi, Chiyoda-ku, Tokyo.Sources

Changed company name to the current name RENOVA, Inc. in light of its entry into the renewable energy business; Relocated head office to Otemachi, Chiyoda-ku, TokyoSources

Started power generation at Mizugou Shioi Solar Co., Ltd., the first solar power generation business of our group.Sources

Commenced power generation at Suigo Itako Solar Power, Inc. as our first solar power generation business.Sources

Started power generation at Futtsu Solar Co., Ltd.Sources

Commenced power generation at Futtsu Solar Power, Inc.Sources

Started power generation at Kikukawa Ishiyama Solar Co., Ltd. and Kikukawa Horinouchi Valley Solar Co., Ltd.Sources

Commenced power generation at Kikugawa Ishiyama Solar Power, Inc. and Kikugawa Horinouchiya Solar Power, Inc.Sources

Started power generation at Kuo Solar Anonymous Partnership.Sources

Commenced power generation at Kokonoe Solar G.K.Sources

Commenced power generation at the Nasu-Shiobara Solar Anonymous Partnership project.Sources

Commenced power generation at Nasu-Shiobara Solar T.K.Sources

Commenced power generation at the Otsu Solar Anonymous Partnership project.Sources

Commenced power generation at Ozu Solar G.K.Sources

Commenced power generation at United Renewable Energy Co., Ltd.Sources

Commenced power generation at United Renewable Energy Co., Ltd.Sources

Established the 'Mission/Corporate Philosophy', 'Vision/Desired Corporate Image', and 'Management Principles/Renova's Commitment'.Sources

Established Our Mission, Our Vision and Our CommitmentsSources

Transferred all shares of Eco Factory Co., Ltd., Green Loop Co., Ltd., and Nissui Co., Ltd., which were part of the plastic recycling business, and focused on renewable energy business.Sources

Transferred all shares in Ecos Factory, Inc., Green Loop, Inc., and Nissen K.K. (all part of the plastic recycling business) and specialized in the renewable energy businessSources

Listed on the Tokyo Stock Exchange Mothers market (ticker: 9519).Sources

Listed on the Tokyo Stock Exchange Mother's market (securities code: 9519)Sources

Established Chisaku Holdings Co., Ltd. and made United Renewable Energy Co., Ltd. a consolidated subsidiary.Sources

Established Sensyu Holdings Co., Ltd. and acquired United Renewable Energy Co., Ltd. as a consolidated subsidiarySources

Changed market to the First Section of the Tokyo Stock Exchange.Sources

Reassigned to the First Section of the Tokyo Stock ExchangeSources

Inauguration ceremony of the Karume Takafun Solar project.Sources

Ground-breaking ceremony at Karumai-Sonbou SolarSources

Moved headquarters to Kyobashi, Chuo-ku, Tokyo.Sources

Inauguration ceremony of the Karita Biomass project.Sources

Moved headquarters to Kyobashi, Chuo-ku, Tokyo, and commenced construction of Karita Biomass.Sources

Relocated head office to Kyobashi, Chuo-ku, Tokyo; Ground-breaking ceremony at Kanda BiomassSources

Relocated head office to Kyobashi, Chuo-ku, TokyoSources

Ground-breaking ceremony at Kanda BiomassSources

Signed financing-related contracts at Tokushima Tsuda Biomass Power Plant LLC.Sources

Formed financing agreement with Tokushima Tsuda Biomass Power Plant G.K.Sources

Commenced power generation at the Yokkaichi Solar Anonymous Partnership project.Sources

Commenced power generation at Yokkaichi Solar G.K.Sources

Established a local corporation in Singapore.Sources

Established a local subsidiary in SingaporeSources

Commenced power generation at the Nasu Karasuyama Solar Anonymous Partnership project.Sources

Commenced power generation at Nasukarasuyama Solar G.K.Sources

Commenced power generation at the Karume West Solar Anonymous Partnership project.Sources

Commenced power generation at Karumai West Solar G.K.Sources

Signed financing-related contracts at Hinoji Solar Anonymous Partnership project.Sources

Signed financing-related contracts at Gomenzaki Port Biomass Energy LLC.Sources

Signed financing-related agreements with Katsuura Biomass Energy LLC.Sources

Formed financing agreement with Hitoyoshi Solar G.K. and Omaezakikou Biomass Energy G.K.Sources

Formed financing agreement with Hitoyoshi Solar G.K.Sources

Formed financing agreement with Omaezakikou Biomass Energy G.K.Sources

Commenced power generation at the Karume East Solar Anonymous Partnership project.Sources

Commenced power generation at Tokushima Tsuda Biomass Power Plant LLC.Sources

Commenced power generation at Karumai East Solar G.K.Sources

Signed financing-related contracts at Ishinomaki Hibari-no Biomass Energy LLC.Sources

Formed financing agreement with Ishinomaki Hibarino Biomass Energy G.K.Sources

Decided to participate in the Quang Tri wind power project in the Socialist Republic of Vietnam.Sources

Participation in Onshore Wind Power Projects in Quang Tri Province in VietnamSources

Established a local subsidiary in South Korea.Sources

Established a local subsidiary in South KoreaSources

Signed financing-related contracts with LLC Du no Mi Biomass Energy.Sources

Formed financing agreement with Morinomiyako Biomass Energy G.K.Sources

Established a local subsidiary in Vietnam.Sources

Signed the first virtual PPA of our group with Murata Manufacturing Co., Ltd.Sources

Established a local subsidiary in VietnamSources

Started power generation at Karita Biomass Energy Co., Ltd., the first biomass power generation project of our group.Sources

Signed financing-related contracts with Nansouso Tono Gijutsu Co., Ltd.Sources

Commenced power generation at Nankasu Yatani Geothermal, the first geothermal power project of our group, operated by Nankasu Yatani Geothermal Co., Ltd.Sources

Commenced power generation at Kanda Biomass Energy K.K. as our first biomass power generation business; Formed financing agreement with Minami-Aso Yunotani Geothermal Power Co., Ltd.Sources

Signed financing-related contracts with LLC Karatsu Biomass Energy.Sources

Formed financing agreement with Karatsu Biomass Energy G.K.Sources

Started power generation at Karume Takafun Solar Anonymous Partnership.Sources

Started power generation at Quang Tri Onshore Wind Power Project in Vietnam, the first wind power generation project of our group.Sources

Commenced power generation at Quang Tri Land Wind Power Project in Vietnam.Sources

Commenced power generation at Karumai sonbou Solar T.K.; Commenced in Onshore Wind Power Projects in Quang Tri Province in Vietnam as our first wind power generation businessSources

Commenced power generation at Karumai sonbou Solar T.K.Sources

Commenced in Onshore Wind Power Projects in Quang Tri Province in Vietnam as our first wind power generation businessSources

Established a local subsidiary in the Philippines.Sources

Established local subsidiary in the PhilippinesSources

Decided to participate in the battery-integrated onshore wind power project in American Samoa.Sources

Participation in Onshore Wind Project with storage battery in American SamoaSources

Renova and PTSC signed a Memorandum of Understanding (MOU) on cooperation for offshore wind power projects in Vietnam.Sources

Established the GX (Green Transformation) headquarters to accelerate new businesses.Sources

Signed Memorandum of Understanding (MOU) with PTSC on Collaboration for Offshore Wind Power Project in Vietnam; Established Green Transformation (GX) Division to accelerate new businessSources

Signed Memorandum of Understanding (MOU) with PTSC on Collaboration for Offshore Wind Power Project in VietnamSources

Established Green Transformation (GX) Division to accelerate new businessSources

Signed a power purchase agreement (PPA) for the first Non-FIT solar power plant of our group with Tokyo Gas Co., Ltd.Sources

Concluded the First Non-FIT solar power purchase agreement (PPA) with Tokyo GasSources

Established a local subsidiary in Indonesia.Sources

Established a local subsidiary in IndonesiaSources

Started power generation at Nansouso Tono Gijutsu Co., Ltd., the first geothermal power project of our group.Sources

Commenced power generation at Minami-Aso Yunotani Geothermal Power Co., Ltd. as our first geothermal power generation businessSources

Signed the first virtual PPA of our group with Murata Manufacturing Co., Ltd.Sources

Concluded the First Virtual PPA with Murata ManufacturingSources

Started power generation at LLC Hinoji Solar.Sources

Commenced power generation at Hitoyoshi Solar G.K.Sources

Started the first grid-scale storage business of our group by establishing the Himeji Energy Storage LLC with Idemitsu Kosan, Nagase Sangyo, and SMFL Mirai Partners.Sources

Started the first grid storage battery business with the establishment of Himeji Energy Storage Facility G.K., a joint venture with Idemitsu Kosan, Nagase & Co., and SMFL Mirai PartnersSources

Started power generation at LLC Du no Mi Biomass Energy.Sources

Commenced power generation at Morinomiyako Biomass Energy G.K.Sources

Commenced power generation at Tokushima Tsuda Biomass Power Plant LLC.Sources

Commenced power generation at Tokushima Tsuda Biomass Power Plant G.K.Sources

Decided to invest in Pathway Power Holdings LLC, a U.S. company engaged in renewable energy and energy storage development.Sources

Decided to invest in Pathway Power Holdings LLC, a developer of renewable energy and storage battery business in the U.S.Sources

Commenced power generation at Ishinomaki Hibari-no Biomass Energy LLC.Sources

Commenced power generation at Ishinomaki Hibarino Biomass Energy G.K.Sources

Signed a capital and business alliance agreement with Tokyo Gas Co., Ltd.Sources

Concluded a capital and business alliance agreement with Tokyo Gas Co., Ltd.Sources

Concluded a capital and business alliance agreement with Tokyo Gas Co, Ltd.Sources

Established a U.S. local corporation.Sources

Established a local subsidiary in USASources

Commenced power generation at Omaezaki Port Biomass Energy LLC.Sources

Commenced power generation at Omaezakikou Biomass Energy G.K.Sources

Commenced power generation at Fukushima Reconstruction Wind LLC.Sources

Commenced power generation at Fukushima Fukko Furyoku, LLC.Sources

Announced the Mid-Term Management Plan 2030.Sources

Announcing the Mediun-term Management Plan 2030Sources

Commenced power generation at Karatsu Biomass Energy LLC.Sources

Commenced power generation at Karatsu Biomass Energy G.K.Sources

Commenced operations at Himeji Energy Storage LLC.Sources

Commenced power generation at Himeji Energy Storage Facility G.K.Sources

Commenced commercial operation Himeji Energy Storage Facility G.K.Sources

Signed financing-related agreements for the Non-FIT small-scale distributed solar business at Daiichi Solar Power LLC.Sources

First Solar Power G.K. has concluded financing-related agreements for non-FIT small-scale, distributed solar power projects.Sources

Signed financing-related agreements for the Kikugawa Nishimura Energy Storage at R1 Energy Storage LLC.Sources

R1 Energy Storage Facility G.K. has concluded financing-related agreements for Kikugawa Nishimura Energy Storage FacilitySources

R1 Energy Storage Facility G.K. has concluded financing-related agreements for Kikugawa Nishimura Energy Storage Facility.Sources

Started operation at Anrai Energy Storage FacilitySources

Commenced operation at Yasugi Energy Storage FacilitySources

Signed financing-related agreements at the Fuki-Ukari Energy Storage Facility under R6 Energy Storage LLCSources

R6 Energy Storage Facility G.K. has concluded financing-related agreements for Fukuroi Ugari Energy Storage Facility.Sources

§07

News

50 ARTICLES

RENOVA Announces Q2 FY2027 Financial ResultsSources

RENOVA, Inc. released its financial results presentation materials for the second quarter of the fiscal year ending March 31, 2027. The briefing was announced on November 12, 2026, and is available for review in the company's IR archives.

2027 Q2 Financial Results Presentation Materials ReleaseSources

Today, Renova Inc. released the financial results presentation materials for the second quarter of fiscal year 2027. The materials include performance and financial information.

RENOVA Announces Q2 FY2027 Financial ResultsSources

RENOVA, Inc. released its financial results for the second quarter of the fiscal year ending March 31, 2027. The announcement includes consolidated financial results for the six months ended September 30, 2026 under IFRS (non-audited) and supplementary material for Q2 FY2027.

Renova Q2 FY2027 Earnings AnnouncementSources

Renova Inc. announced the Q2 FY2027 earnings on November 11, 2026. The announcement included a consolidated earnings release based on IFRS standards and supplementary materials.

Third-Party Verification of Biomass Power Generation Sustainability CompletedSources

NTT Anode Energy Corporation and RENOVA, Inc. have completed third‑party verification of the sustainability of their jointly developed biomass power generation scheme. The verification demonstrates compliance with RE100 technical criteria and supports corporate environmental reporting. The assessment was conducted at four power plants operated by RENOVA.

Completion of Third-Party Verification of Biomass Power SustainabilitySources

The scheme jointly built by NTT Anode Energy and Renova was applied to Renova's four power plants, and third-party verification was completed. This enables customer companies to present the necessary sustainability evidence when explaining compliance with RE100 technical requirements.

Website Restored After PHP Vulnerability FixSources

The website was temporarily suspended to address a PHP vulnerability. Maintenance was completed, and the site is now fully operational. The downtime lasted from approximately 12:30 p.m. on October 22, 2026, to approximately 4:30 p.m. on October 27, 2026, and the company apologized for the inconvenience.

Website Restoration and Reopening NoticeSources

The website, which had been temporarily suspended due to addressing a PHP vulnerability, has been restored after maintenance and was back online around 16:30 on October 27, 2026. The downtime lasted from approximately 12:30 on October 22, 2026, to around 16:30 on October 27, 2026, and we apologize for any inconvenience caused to users.

September 2026 Electricity Sales NoticeSources

RENOVA announced electricity sales figures for its major renewable energy power plants in Japan. The provided excerpt shows first-half figures for fiscal 2027, including April actual sales and comparisons with planned sales for large-scale solar, biomass, and small-scale distributed solar.

September 2026 Power Sales Volume NoticeSources

For the March 2027 fiscal year, we publish the power sales volume by power source, including generation output, planned sales volume, actual sales volume, planned ratio, and year-over-year comparison. Data for large-scale solar, biomass, and small-scale distributed solar are included.

§08

Public records

GOV
National Tax Agency basic information7011001037180
Source: National Tax Agency Corporate Number Publication Site, basic three itemsSources
Trade name
株式会社レノバ
Trade name (kana)
レノバ
Name in English
Corporation type
301
Address
〒104-0031 東京都中央区京橋2丁目2番1号
Postal code
1040031
Prefecture code
13
City code
102
Address outside Japan
Prefecture in English
City in English
Address outside Japan in English
Corporate number assignment date
2015-10-05
Update date
2018-10-12
Change date
2018-10-01
Registry closure date
Reason for registry closure
Successor corporate number
Details of the change
Latest record
1
Excluded from search
0
Processing type
12
Correction type
0
Trade name image ID
Address image ID
Sequence number
2234954
METI gBizINFO7011001037180
Source: gBizINFO (Ministry of Economy, Trade and Industry)Sources
Corporate number
7011001037180
Trade name
株式会社レノバ
Trade name (kana)
レノバ
Trade name (alphabet)
Registry closure date
Reason for registry closure
Registered address
東京都中央区京橋2丁目2番1号
Postal code
1040031
Prefecture
東京都
Prefecture code
13
City or district
中央区
City code
102
Street address
京橋2丁目2番1号
Organisation type
301
Processing type
12
Correction type
0
Status
Representative
代表取締役社長CEO 木南 陽介
Capital
11342000000
Employees
220
Employees (male)
Employees (female)
Business summary
Website URL
Year founded
Business category
Date established
2000-05-30
Unified government qualification - grade
||B|
Unified government qualification - business items
303
Update date
2018-10-12
Key information
7011001037180
§09

Sources & updates

SOURCES
↑