Shibata Kako Sekkei was established in 1965 as a plant design business.
Started operations with a focus on piping arrangement design for oil, petrochemical, and chemical plants
PWR型原子力発電プラント設計業務開始
Started operations for PWR nuclear power plant design
Started operations for PWR nuclear power plant design.
東京出張所開設
Established Tokyo Detached Office
Established Tokyo Detached Office.
東京出張所を東京支店に昇格
神戸設計室開設
高速増殖炉「もんじゅ」設計業務開始
Promoted Tokyo Detached Office to Tokyo Branch Office
Established Kobe Design Office
Started operations for “Monju” fast-breeder reactor design
東京出張所を東京支店に昇格 神戸設計室開設 高速増殖炉「もんじゅ」設計業務開始
Promoted Tokyo Detached Office to Tokyo Branch Office. Established Kobe Design Office. Started operations for “Monju” fast-breeder reactor design.
BWR型原子力発電プラント設計業務開始
Started operations for BWR nuclear power plant design
Started operations for BWR nuclear power plant design.
東京支店を東京原子力設計センターに改名
Changed name of Tokyo Branch Office to Tokyo Nuclear Energy Design Center
Changed name of Tokyo Branch Office to Tokyo Nuclear Energy Design Center.
高速増殖炉「実証炉」基本設計業務開始
Started operations for the basic design of a demonstration fast-breeder reactor
Started operations for the basic design of a demonstration fast-breeder reactor.
高温工学試験研究炉 (HTTR) 設計業務開始
青森県六ヶ所核燃料サイクル施設設計業務開始
Started operations for highengineering test reactor (HTTR) design
Started operations for the design of the Rokkasho Nuclear Fuel Reprocessing Facility in Aomori Prefecture
高温工学試験研究炉 (HTTR) 設計業務開始 青森県六ヶ所核燃料サイクル施設設計業務開始
Started operations for high engineering test reactor (HTTR) design. Started operations for the design of the Rokkasho Nuclear Fuel Reprocessing Facility in Aomori Prefecture.
特定労働者派遣事業届出
Submitted Notification of Specified Worker Dispatching Undertaking
Submitted Notification of Specified Worker Dispatching Undertaking.
原子力設計センターを横浜市に移転
原子力エネルギー設計センターを横浜市に移転
Moved Nuclear Energy Design Center to Yokohama City.
神戸出張所開設
Established Kobe Detached Office
Established Kobe Detached Office.
海外向けプラント設計開始
PWR型原子力発電プラント 耐震バックチェック業務開始
Started design for plants abroad
Started operations for PWR nuclear power plant design seismic back-checks
海外向けプラント設計開始 PWR型原子力発電プラント 耐震バックチェック業務開始
Started design for plants abroad. Started operations for PWR nuclear power plant design seismic back-checks.
創立45周年記念行事開催
45th Anniversary Commemorative Event Held
45th Anniversary Commemorative Event Held.
PWR型原子力発電プラント 再稼働関連業務開始
ISO9001:2008 認証取得
Started operations related to PWR nuclear power plant design plant re-operation
Obtained ISO 9001:2008 certification
PWR型原子力発電プラント 再稼働関連業務開始 ISO9001:2008 認証取得
Started operations related to PWR nuclear power plant design plant re-operation. Obtained ISO 9001:2008 certification.
創立50周年記念行事開催
神戸事務所開設
BWR型原子力発電プラント 再稼働関連業務開始
50th Anniversary Commemorative Event Held
Established Kobe Office
Started operations related to BWR nuclear power plant design plant re-operation
創立50周年記念行事開催 神戸事務所開設 BWR型原子力発電プラント 再稼働関連業務開始
50th Anniversary Commemorative Event Held. Established Kobe Office. Started operations related to BWR nuclear power plant design plant re-operation.
一般労働者派遣事業許可取得
三菱重工業㈱パワードメイン原子力事業部殿より優良ビジネスパートナー賞受賞
Obtained license for General Worker Dispatching Undertaking
Received Outstanding Business Partner Award from the Mitsubishi Heavy Industries, Ltd. Power Systems Domain Nuclear Energy Systems Division
Obtained license for General Worker Dispatching Undertaking. Received Outstanding Business Partner Award from the Mitsubishi Heavy Industries, Ltd. Power Systems Domain Nuclear Energy Systems Division.
ISO9001:2015 認証取得
本社 新社屋落成
Obtained ISO 9001:2015 certification
本社用新築ビルの建設を完了
ISO9001:2015 認証取得 本社 新社屋落成
Obtained ISO 9001:2015 certification. Completed construction of new building for head office.
資本金を5,000万円に増資(繰越利益剰余金の資本組入れによる)
第18回 堺市景観賞 受賞 【本社社屋:建築物等部門】
Capital increased to 50 million yen
(Depending on the capital structure of retained earnings carried forward)