Moved to a rented factory in Yanagihara, Wadayama Town.
September 1959: Founded as Fuji Spring Works in Tamaki, Wadayama-cho.
Founded as Fuji Spring Manufacturing Works in Tamaoki, Wadayama Town.
Founded: September 11, 1959.
Capital: ¥1.25 million.
Installed a manual coiling machine (3 sales employees and 5 manufacturing employees).
Expanded sales channels, focusing on small precision springs.
February 1960: Established Fuji Spring Co., Ltd. with capital of 1.25 million yen. Introduced a manual coiling machine (3 sales employees and 5 manufacturing employees). Expanded sales channels, focusing on small precision springs.
Fuji Spring Co., Ltd. established.
Established: February 4, 1960.
1961: Installed a small press.
Installed a small press machine.
1966: The New Three Sacred Treasures, the “3 Cs” (color television, car, and cooler).
July 1966: Increased capital to 4 million yen.
Increased capital to 4 million yen.
Workforce reached approximately 30 employees.
March 1968: Relocated the head office factory to Hirano, Wadayama-cho. Workforce reached approximately 30 employees.
Relocated the head office factory to Hirano, Wadayama-cho.
June 1969: Honored as an exemplary tax-reporting corporation.
Recognized as a model taxpayer corporation.
Early July 1972: Teradani Factory completed in Teradani, Wadayama-cho.
Completed the Teratani Plant in Teratani, Wadayama-cho.
1973: First oil crisis.
July 1973: Increased capital to 8 million yen.
Increased capital to 8 million yen.
1975: Began transactions with a major home appliance manufacturer. Produced dynamo wire springs for bicycle lights, constant-force springs for electric fans, cord-rewind springs for vacuum cleaners, and other products.
Began doing business with a major home appliance manufacturer.
Manufactured dynamo wire springs for bicycle lights, constant-force springs for fans, cord-rewind springs for vacuum cleaners, and other products.
1976: Started manufacturing torsion springs and began development of quartz crystal resonators. Built a dedicated press factory with an investment of 200 million yen, introduced two transfer presses, and began taking orders for deep-drawing work. Manufactured antenna caps and other products.
Began manufacturing torsion springs.
Began developing crystal oscillators.
Invested 200 million yen to build a dedicated press plant.
Installed two transfer presses.
Began accepting orders for deep-drawing work and manufacturing products such as antenna caps.
1980: Installed a forming machine.
Installed a forming machine.
1981: Began development of the hand mixer’s “center-shaftless blade.” Began transactions with a major heavy electrical equipment manufacturer and produced automotive electrical components.
Began developing a “center-shaftless blade” for hand mixers.
Began doing business with a major heavy electrical equipment manufacturer.
Manufactured automotive electrical components.
1982 Development begins on NiCd battery sealing assemblies (with safety valves)
Development of a nickel-cadmium battery sealing assembly with a safety valve began
1983 Machine tools, including wire EDM machines and machining centers, are introduced to expand in-house die manufacturing
Machine tools, including wire EDM and machining centers, were introduced to strengthen in-house mold production
1984 Research into nickel plating begins
Research into nickel plating began
Became a production site for “center-shaftless blades” (1 million units produced in total)
Development of a square steel sealing assembly began
1988 March Mabeshiba Plant completed (Mabeshiba, Wadayama-cho) Becomes a production base for “center-shaftless blades” (total production: 1 million units) Development begins on steel rectangular battery sealing assemblies
1989 Company trip to Taiwan Fujiexceed Co., Ltd. established
Fujiexceed Co., Ltd. established
1990 Full-scale mass production of NiCd battery sealing assemblies begins One 60-ton transfer press is installed
Full-scale mass production of nickel-cadmium battery sealing assemblies began
One 60-ton transfer press was introduced
1993 Company trip to Singapore
Workforce reached approximately 100 employees
1994 October Capital increased to 10 million yen Workforce reaches approximately 100 employees
Capital increased to 10 million yen
Prototype production of lithium-ion battery components for mobile phones began
1995 Great Hanshin-Awaji Earthquake April Hiroshi Fujii appointed Representative Director Prototype production begins for lithium-ion battery components for mobile phones
Kei Fujii appointed Representative Director
Mass production of lithium-ion battery components for mobile phones began
1996 March Nomura Plant purchased (Nomura, Wadayama-cho) Mass production begins for lithium-ion battery components for mobile phones
Nomura Plant purchased (Nomura, Wadayama Town)
1997 Prototype production begins for automotive nickel-metal hydride cylindrical battery components
Prototype production of nickel-metal hydride cylindrical battery components for vehicles began
1998 April Capital increased to 20 million yen Company trip to Hawaii
Capital increased to 20 million yen
1999 Safety-valve-equipped sealing plates become mandatory for lithium-ion batteries for mobile phones Lithium-ion battery components for mobile phones enter the era of full-scale mass production (at peak, shipments reached 22 million units per month)
Full-scale mass production of lithium-ion battery components for mobile phones began (shipments peaked at 22 million units per month)
2000 Techno Forest Co., Ltd. established
Technoforest Co., Ltd. established
2001 Mass production begins for automotive nickel-metal hydride cylindrical battery components Workforce reaches approximately 200 employees
Mass production of nickel-metal hydride cylindrical battery components for vehicles began
Workforce reaches approximately 200 employees
2002 January Head office plant relocated to Wadayama Industrial Park (Tsutsue) Surface Treatment Building constructed
Head office factory relocated to Wadayama Industrial Park (Tsutsue)
New surface treatment building constructed
2002 July Capital increased to 30 million yen
Capital increased to ¥30 million
2002 September New head office press building completed (now Press Building No. 1)
New head office press building constructed (now Press Building No. 1)
Full-scale production of components for automotive cylindrical nickel-metal hydride batteries begins
2003 September Second Surface Treatment Building completed Full-scale mass production begins for automotive nickel-metal hydride cylindrical battery components
New No. 2 surface treatment building constructed
Full-scale production of airbag inflator components begins
In-house prototyping of components for automotive prismatic batteries begins
2004 September Capital increased to 48 million yen Full-scale mass production begins for airbag inflator components In-house prototype production begins for automotive rectangular battery components
Capital increased to ¥48 million
Full-scale production of components for seat belt emergency locking retractors begins
Workforce reaches approximately 300 employees
2005: The Heisei-era municipal merger объединed Asago Town, Ikuno Town, Santo Town, and Wadayama Town to form Asago City. April: Added a second factory (renovated the technical building) at Wadayama Industrial Park (Tsutsue). Began full-scale production of seat belt emergency retractor components. Workforce reached approximately 300.
Second factory added at Wadayama Industrial Park (Tsutsue) (technology building renovated)
Joint development of components for automotive prismatic batteries begins with a major automaker
Operations begin as a dedicated factory for the hybrid business
2006: Began joint development of prismatic battery components for automotive applications with a major automaker. April: Constructed Building B of the second factory at Wadayama Industrial Park (Tsutsue) and began operations as a dedicated hybrid business facility.
Building B of the second factory constructed at Wadayama Industrial Park (Tsutsue)
2007: March: Relocated the Teratani Factory to Building D of the second factory.
Teratani Factory relocated to Building D of the second factory
Recognized by the Ministry of Economy, Trade and Industry as one of 300 Vibrant Manufacturing SMEs
Employee count of 400
2008: April: Expanded the head office factory (Tsutsue). Recognized as one of 300 Vibrant Manufacturing SMEs by the Ministry of Economy, Trade and Industry.
Head office factory (Tsutsue) expanded
2008: August: Relocated the Nomura Factory (the manufacturing site for aluminum cases for mobile phones) to the head office factory (Tsutsue).
Nomura Factory (manufacturing base for portable aluminum cases) relocated to the head office factory (Tsutsue)
Subsidy approved for the Ministry of Economy, Trade and Industry's Low-Carbon Employment Creation Industrial Location Promotion Project
Production of automotive-shaped lithium-ion battery components commenced
2009: March: Increased capital to ¥95 million. Began production of prismatic lithium-ion battery components for automotive applications.
Capital increased to 95 million yen
2010: February: Held a ceremony celebrating the company’s 50th anniversary. Revised the management philosophy and created a management philosophy handbook. Received the Tajima Industry Award. April: Constructed Building C of the second factory.
Great East Japan Earthquake
Full-scale production of automotive-shaped lithium-ion battery components began
Employee count of 500
2011: Great East Japan Earthquake. Began full-scale production of prismatic lithium-ion battery components for automotive applications. April: Constructed Building E of the second factory. May: Constructed Building F of the third factory (Santo Town). Workforce reached approximately 500.
Second factory, Building E newly constructed
Third factory (Yantō Town), Building F newly constructed
2013: Introduced a new personnel system.
Introduction of a new personnel system
Joint venture Fuji FNS KOREA established in Asan City, South Korea
Employee count of 600
2014: November: Constructed Building G of the third factory. Established joint venture Fuji FNS KOREA in Asan, South Korea. Workforce reached approximately 600.
Third factory, Building G newly constructed
2016: Began mass production of the second generation of prismatic lithium-ion battery components for automotive applications. Absorbed and merged with Technoforest Co., Ltd., which began operations as the Osaka-Toyonaka Factory.
Second-generation automotive-shaped lithium-ion battery components mass production commenced
Techno Forest Inc. absorbed and merged, operating as Osaka Toyonaka plant
2017: Opened the Nagoya satellite office. Absorbed and merged with Fuji Exceed Co., Ltd.
Satellite office in Nagoya opened
Fuji Excite Inc. absorbed and merged
2018: Recognized as one of 300 SMEs and small businesses poised for growth by the Ministry of Economy, Trade and Industry. Achieved sales of ¥10.6 billion (fiscal year ended March 2018).
300 SMEs and small-scale enterprises certified as 'flapping' (Ministry of Economy, Trade and Industry)
Achieved sales of 10.6 billion yen (FY March 2018)
Reiwa era commencement
Long-Term Vision 2030 Announcement
Purchase of new factory site in Kameyama City, Mie Prefecture
Establishment of Fuji Hatsu Technology (Suzhou) Co., Ltd. in Suzhou, Jiangsu Province, China
2019: September: Held a ceremony celebrating the 60th anniversary of the company’s founding. The Reiwa era began. Announced the Long-Term Vision 2030. Purchased land for a new factory in Kameyama, Mie Prefecture. Established Fuji Hatsugi Technology (Suzhou) Co., Ltd. in Suzhou, Jiangsu Province, China.
60th Anniversary Founding Commemoration Ceremony
§07
News
20 ARTICLES
Horizontal recycling of aluminum materials for automotive batteries receives Minister of the Environment Award
Fuji Hattori Co., Ltd. announced that the horizontal recycling of aluminum materials for automotive batteries, carried out in collaboration with four companies, received the Minister of the Environment Award at the 9th SX Awards.
Winner of the Minister of the Environment Award at the 9th SX Awards
A four-company collaboration to horizontally recycle aluminum materials for automotive batteries won the Minister of the Environment Award at the 9th SX Awards.
Realizing horizontal recycling of aluminum materials for automotive batteries
Through collaboration among four companies, including Fuji Fattori Co., Ltd., we achieved horizontal recycling of aluminum materials used in automotive batteries.
Achieved Closed-Loop Recycling of Aluminum Materials for Automotive Batteries
Four companies collaborated to achieve closed-loop recycling of aluminum materials used in automotive batteries.
Summer Holiday Notice
We will be closed from Saturday, August 8, 2026, to Sunday, August 16, 2026. We will respond to inquiries and entries received during the closure starting Monday, August 17, 2026, in order.
Notice of Summer Holiday Closure
We will be closed from Saturday, August 8, 2026, through Sunday, August 16, 2026. We will respond to inquiries and applications received during this period starting Monday, August 17, in the order received.
Notice of Golden Week Closure
We will be closed from Thursday, April 30, 2026 to Wednesday, May 6, 2026. Inquiries and entries received during the closure period will be handled sequentially starting Thursday, May 7, 2026.
Golden Week Holiday Closure Notice
We will be closed from Thursday, April 30, 2026, through Wednesday, May 6, 2026. We will respond to inquiries and applications received during the closure period in the order received, starting Thursday, May 7.
We held an induction ceremony
On April 1, 2026, 14 new employees joined the company for the current fiscal year. After about a month of new employee training, they are scheduled to be officially assigned by the end of this month.
We held the 2026 induction ceremony
This year, 14 new employees joined. After about a month of new employee training, they are scheduled to be officially assigned by the end of this month.
§08
Public records
GOV
National Tax Agency basic information5140001046874