59 EVENTS
Merger of Yawata and Fuji; Nippon Steel Corporation established
NISCONI established in Indonesia as a fabrication and assembly base for steel structures for the oil and gas industry
Contract awarded for Ashiyahama high-rise housing: Japan's first massive redevelopment project awarded through a competition
Contract awarded to build a platform for offshore oil extraction off Aga: Japan's first fabrication and installation project for an offshore marine steel structure
Engineering Division established
Wuhan Project (China) launched: a pioneering project for a large-scale steelmaking plant for overseas markets
CSN Third Blast Furnace (Brazil) blown in: a pioneering overseas blast furnace construction project
Contracts awarded for waste-melting furnaces in Kamaishi and Ibaraki: the waste-melting process was put to practical use for the first time in the world
Contract awarded for the Shanghai Baoshan Project (China): a major national project
Contracts awarded for Mutsu-Ogawara oil storage tanks and subsea pipeline: national oil reserve tanks under the Petroleum Stockpiling Act and a large-scale subsea pipeline
Contracts awarded for the Iwaki offshore platform, fabrication, and subsea pipeline: deepwater subsea pipeline construction in the open waters of the Pacific
First contract awarded for a TEPCO LNG receiving pipeline: the first contract for LNG receiving pipeline facilities for an electric utility
Contract awarded for the Tanjung Uban LPG receiving terminal (Indonesia): a comprehensive contract for propane/butane separation and production, refrigerated storage, and shipping facilities
Contract awarded for structural steel work on the Bank of China Hong Kong branch: a landmark tower in Hong Kong
TNS established in Thailand as a fabrication base for offshore structures
Awarded the Makuhari Techno Garden contract: Participated from the planning stage of the project initiated by the development of Makuhari New City
Awarded the contract for the Kawasaki artificial island (jacket-type revetment) on the Trans-Tokyo Bay Highway: Full-scale adoption of jackets for artificial island construction
Awarded the I/N Kote CGL contract: A galvanizing line developed to meet the expansion of Japanese automakers into North America
Awarded the structural steelwork contract for the Yokohama Landmark Tower in Minato Mirai 21: Japan's tallest office building
Awarded the structural steelwork contract for the passenger terminal building (main roof) at Kansai International Airport: A long-span roof with complex three-dimensional curves; materials procured internationally
Awarded the East Java Gas Pipeline contract (Indonesia): The company's first long-distance subsea pipeline (358 km)
Awarded the Akashi Kaikyo Bridge cable contract: Cable work for the world's longest suspension bridge
NS-BATAM established as a base for the storage and maintenance of the offshore work vessel Kuroshio and for the fabrication and processing of offshore structures
PNS Construction Inc. (PNS) established
Awarded the Meikai IPP contract: Coal-fired boiler-turbine power generation facility for wholesale electricity supply
Awarded the contract for the Roppongi 6-chome specified electricity business and DHC plant: On-site energy supply facility combining high energy-saving performance with environmental conservation
Entered the electricity retail business
Awarded the Sakhalin-1 Pipeline contract (Russia): Large-scale pipeline construction for the Sakhalin development project
Awarded the contract for the development and other works of Central Government Building No. 7 (PFI): Japan's largest-scale PFI project, including urban redevelopment and a public-private joint building
Beijing Sino-Japanese United Energy Conservation and Environmental Protection Engineering Technology Co., Ltd. established
Gangxin Nippon Steel Equipment Engineering (Shanghai) Co., Ltd. established
Awarded the contract for the construction of Runway D and related works at Tokyo International Airport
Awarded the South Sumatra–West Java Gas Pipeline contract (Indonesia)
The Engineering Division became independent, and Nippon Steel Engineering Co., Ltd. was established
Consolidated and relocated the headquarters area business base (headquarters building, Sagamihara office, Nippon Steel Pipeline headquarters) to Osaki, and moved the Technology Development Research Institute (Sagamihara) to Futtsu.
Established Chongqing Xinyuan Steel Equipment Technology Co., Ltd. (CNSE).
Integrated the bridge and steel structure businesses of Nippon Steel Bridge Co., Ltd. and Topi Steel Structure Co., Ltd., and established Nippon Steel Topi Bridge Co., Ltd.
Established Nippon Steel Engineering India Plant & Machinery Pvt. Ltd. (NSEI).
Completion of Building E at Kitakyushu Technology Center (Tobata).
Established Nippon Steel Engineering USA Inc. (NSEUSA).
Renamed to Shin Nippon Steel & Sumitomo Metal Engineering Co., Ltd.
Merged the operations of Nippon Steel Pipeline Co., Ltd. and Sumitomo Metal Pipe Engineering Co., Ltd., and established Nippon Steel Sumitomo Metal Pipeline & Engineering Co., Ltd.
Established NS-OG Energy Solutions (Thailand) Ltd. (NSET).
Established PNS Advanced Steel Technology, Inc. (PNS-ASTech).
Established Philippine NSE Design Services, Inc. (PNSED).
Established Steinmüller Babcock Environment GmbH.
Reorganized the steel structure business and established Nippon Steel Sumitomo Metal Steel Structure Co., Ltd.
Converted Nippon Steel Engineering India Plant & Machinery Pvt. Ltd. (NSEI) into a business company.
Acquired the dry desulfurization and denitrification equipment (DDDS) business from Sumitomo Heavy Industries Ltd.
Signed a comprehensive cooperation agreement with Toyo Engineering Co., Ltd.
Nippon Steel Sumitomo Metal Pipeline & Engineering Co., Ltd. and Capti Co., Ltd. signed a joint cooperation agreement on medium-pressure gas pipeline construction business.
Renamed to Nippon Steel Engineering Co., Ltd.
Moved and consolidated the Technology Development Research Institutes (Futtsu and Wakamatsu) to Tobata (within Kitakyushu Technology Center).
Absorbed and merged Nippon Steel Plant Design Co., Ltd.
Nippon Steel Environment Plant Solutions Co., Ltd. and Nippon Steel Energy Services Co., Ltd. merged operations, establishing Nippon Steel Environment Energy Solutions Co., Ltd.
Contract awarded for construction of Ishikari Bay New Port offshore wind farm.
Contract awarded for construction of Kitakyushu Hibiki Bay offshore wind facility.
Absorbed merger with Nippon Steel Steel Structure Co., Ltd.
Establishment of the Manufacturing Technology Center.
§07
News
10 ARTICLES
Showcasing Sewage Sludge Fuel Conversion Technology at the COP31 Japan Pavilion
Nippon Steel Engineering will give a presentation on its J-CONBI® sewage sludge solid fuel conversion technology at the Ministry of the Environment’s “Japan Pavilion” at COP31. The company will highlight its efforts to convert sewage sludge into an alternative to coal, along with its commercial operating track record in Japan, and share how the technology contributes to reducing fossil fuel consumption and CO₂ emissions and promoting resource circulation.
CDQ Completed at JFE Steel’s Fukuyama District
Nippon Steel Engineering completed one coke dry quenching facility (CDQ) for JFE Steel’s West Japan Works, Fukuyama District. The facility has a processing capacity of 144 tonnes per hour and was installed in conjunction with the construction of No. 6 coke oven. Energy-saving subsidies were used. Including this facility, the Nippon Steel Engineering Group has received orders for a total of 181 CDQ units.
Publishes the Sustainability Report 2026
Nippon Steel Engineering has published its Sustainability Report 2026, which summarizes the Group’s initiatives and business activities aimed at realizing a sustainable society. The report introduces the new corporate philosophy framework established to mark the company’s 20th anniversary, as well as its long-term vision looking ahead to 2035. It features the autonomous plant concept “Think Plant®” and the STEAM education program “Passion and Advanced Technology Mission-E,” and also marks the start of disclosure of Scope 3 emissions.
Partnership Agreement with Kitakyushu City to Realize a Decarbonized, Circular Society
Nippon Steel Engineering has concluded a “Partnership Agreement on the Advanced Use of Regional Energy and the Promotion of Decarbonization” with Kitakyushu City. The parties will work together to promote waste-to-energy generation and the use of renewable energy, optimize energy supply and demand through an EMS, and utilize hydrogen and ammonia.
Relief Fund Contribution to Areas Affected by the 2026 Kumamoto Earthquake
Nippon Steel Engineering contributed a total of 3 million yen in relief funds to Kumamoto Prefecture to support recovery and reconstruction in the affected areas.
Exhibiting at SMART ENERGY WEEK 2026 [Autumn]
Nippon Steel Engineering will exhibit at SMART ENERGY WEEK 2026 [Autumn], held at Makuhari Messe from September 9 to 11. The company will showcase technologies related to CO₂ separation, capture, and storage (CCS), as well as its renewable energy aggregation services. Admission is free, and advance visitor registration is required.
Contracts Signed for Two Grid-Scale Battery Storage Facilities in Hachioji
Tama Kousan and Nippon Steel Engineering have signed a contract under which Nippon Steel Engineering will manage power operations using Think EMXS™ for the Tama Kousan Hachioji Plant No. 1 and No. 2 Battery Storage Facilities, which Tama Kousan plans to install and operate. The facilities will be located in Miyama-cho, Hachioji, Tokyo. Each battery storage system will have an output of 1,999 kW, and operations are scheduled to begin around December 2026.
Regarding the Summer 2026 Work Style Campaign
Nippon Steel Engineering will implement initiatives for summer 2026 from the perspectives of energy conservation and work style reform. It will designate a total of nine encouraged annual leave days from late July through August and recommend attire suited to the time, place, and occasion throughout the year. In its offices, it will move the start of air conditioning operations up to 7:00 a.m. and implement measures such as automatic lighting and air conditioning controls.
Awarded contract for equipment upgrades and 15 years of operations at Eco-Clean Matsue
Nippon Steel Engineering was awarded a contract by Matsue City for the “Eco-Clean Matsue Core Facility Equipment Improvement Project” and long-term comprehensive operations, and has signed the contract. While continuing normal waste treatment, the company will replace and upgrade equipment such as generators and condensers, aiming to reduce CO₂ emissions through greater facility efficiency and extend the facility’s service life. Operations and maintenance will be carried out for 15 years, until March 2041.
STEAM Education Program “Passion & Advanced Mission-E” Kicks Off
Nippon Steel Engineering held appointment ceremonies in the Kanto and Kitakyushu regions to kick off the 2026 “Passion & Advanced Mission-E” program. This company-developed STEAM education program challenges junior and senior high school students to tackle social issues. Engineers support the students for eight months through lectures, workshops, and other activities, with the final review held the following March. Since the program began in 2015, a total of 653 students had participated through the previous fiscal year.