Open company graph database — free web & API
Login

Shanghai First Precision Molding Co., Ltd.

上海第一精工模塑有限公司
Ticker
—
Listed market
—
Country
Japan
Employees (non-consolidated)
—
Related companies
4
§01

Basic information

BASIC
Head office
〒612-8024 Kyoto City Fushimi-ku Momoyama-cho Nerai 12-4
Chief executive
Koishi Hideki
Capital
8,502,002,000 JPY (85 100 millionJPY)
Employees (non-consolidated)
Employees (consolidated)
Start date
1963-07-10
End date
§02

Websites

1 DOMAINS
§03

Business

20
ConnectorSemiconductor manufacturing equipmentMEMS FoundrySensorManufacturing outsourcingMold and automation equipmentBattery storage systemOdor sensorCustom automatic assembly machine optimized for productsPrecision molding moldProduction process and line proposalSolar street lampVariable batteryCapacitive torque sensor ESTORQElectric hand "ES-Hand"Connector automatic fitting system "CARA"Custom connectorMolded productPrecision moldingAssembly and contract production
§04

Related companies

4 COMPANIES
Company name Group Parent Subsidiary Customer Supplier Alliance Bank Shareholder
I-PEX (SHANGHAI) Co., Ltd.
尔培精密模型(上海)有限公司(中国上海工厂)
爱沛精密模塑(上海)有限公司
I-PEX Corporation
Shareholder
Names without a link are companies not yet registered in OpenBizGraph
§05

Network

NETWORK
Drag to move · click to open
§06

History

65 EVENTS

The mold manufacturing process "module system" is realized through comprehensive separation construction, complete heat treatment hardening, and full mechanical processing.Sources

In July 1963, during Japan's rapid economic growth, First Precision Co., Ltd. was founded in Fushimi, Kyoto, Japan.Sources

The factory was expanded, and a fixture department was established using the precision machining technology accumulated during the mold production process.Sources

Export of precision plastic molds to the United States, Canada, Mexico, and Singapore began.Sources

To prepare for business expansion, a 26,400‑square‑meter factory site was acquired in Kokuragi, Fukuoka Prefecture.Sources

At the NPE (North American Plastics Expo) held in Chicago, the company became the first Japanese mold industry enterprise to exhibit.Sources

A resident office was established in Singapore.Sources

An automatic semiconductor packaging system was developed.Sources

The company first exhibited as a mold specialist at the Japan Plastics Expo.Sources

A Tokyo branch was established.Sources

First Precision began OEM production of precision plastic parts after receiving an order for mass production of connector molded products using its own molds in the early 1970s.Sources

The company began accepting contract production of connector molded parts and expanded its scale. First Precision started contract production of precision plastic components in the early 1970s by taking orders to mass‑produce connector molded parts using molds produced by its own company. Through the process of accepting a wide variety of mass production orders, it deepened proprietary knowledge of the entire production process, advanced high‑precision manufacturing of high‑quality products, and expanded its business scale.Sources

In the 1980s, it released the world's first fully automatic semiconductor resin sealing device, the "GP System."Sources

The world’s first fully automatic semiconductor resin packaging equipment "GP‑SYSTEM" was developed.Sources

Looking to the future, Fukuoka is being developed as a business base.Sources

Singapore: Kaku Cold Factory (Singapore Dai‑ichi Pte. Ltd.)Sources

Philippines factory (Philippine, D‑I Inc.)Sources

Malaysia: Johor Bahru Factory (MDI Sdn. Bhd.)Sources

In China (Shanghai), it established Shanghai First Precision Molding Co., Ltd. (now Aipei Precision Molding (Shanghai) Co., Ltd.) as a production base.Sources

Established Shanghai Dai-ichi Seiko Mold Co., Ltd. in China (now Aipei Precision Mold (Shanghai) Co., Ltd.)Sources

Singapore: Woodland Plant (Hitool (s) Pte. Ltd., now I-PEX Singapore Pte Ltd, Woodland Plant)Sources

Dai-ichi Seiko established Shanghai Dai-ichi Seiko Mold Co., Ltd. (Shanghai First Factory) in China.Sources

Philippines: Cebu Factory (Cebu Dai-ichi, Inc.)Sources

Singapore: Yishun Factory (Singapore Dai-ichi Pte. Ltd., Yishun Plant, now I-PEX Singapore Pte Ltd, Yishun Plant)Sources

Philippines: Laguna Factory (Laguna Dai-ichi, Inc., now I-PEX Philippines Inc.)Sources

Started production of hard disk componentsSources

First worldwide launch of mass production of HDD critical component "Ramp"Sources

Started mass production of automotive component "Rotary Sensor"Sources

Established Taiwan Office in Kaohsiung, TaiwanSources

Established Thailand Office in Bangkok, ThailandSources

Established Thai Dai-ichi Seiko Co., Ltd. (now I-PEX (Thailand) Co., Ltd.) as a production base in Bangkok, ThailandSources

Established a Malaysia office in Ipoh, MalaysiaSources

Established PT. Pertama Precision Bintan (now PT IPEX Indonesia Inc) as a production base in Bintan Island, IndonesiaSources

Thailand: Chonburi Factory (Thai Dai-ichi Seiko Co., Ltd., now I-PEX (Thailand) Co, Ltd.)Sources

Indonesia: Bintan Island Factory (PT. Pertama Precision Bintan, now PT IPEX Indonesia Inc)Sources

Established local corporation Touchstone Precision, Inc. in Auburn, Alabama, USA to build automotive component-related factoriesSources

Commenced mass production of RF coaxial line connectors "MHF®" seriesSources

Established a Shanghai office in Shanghai, ChinaSources

Established Hong Kong First Precision Co., Ltd. in Hong KongSources

Commenced operations from 2002Sources

Achieved integrated development, production, and sales; integrated operations with I-PEX Co., Ltd., a pioneer in high-speed, wide-area communication connectorsSources

Shanghai Second Factory, ChinaSources

Vietnam: Ho Chi Minh Factory (Vietnam Dai-ichi Seiko Co., Ltd., now I-PEX Viet Nam Co, Ltd.)Sources

Launched mass production of PCB connectors for automotive devices designed in-houseSources

Expanded the factory based on foresight of business scale growthSources

Commenced mass production of board-to-board (FPC) connectors "NOVASTACK®" seriesSources

Established the Heiwa Test Site (now Shizuoka R&D Center Heiwa Test Station) in Shizuoka City, Shizuoka PrefectureSources

Established Shanghai Technical Center (Shanghai Third Factory) as the first overseas technology base.Sources

Developed the MEMS-based odor sensor "nose@MEMS"Sources

Established Dai-ichi Seiko (M) Sdn. Bhd. (now IPEX Global Manufacturing (M) Sdn. Bhd.) as a production base in Johor Bahru, MalaysiaSources

Malaysia: Johor Bahru New Factory (Dai-ichi Seiko (M) Sdn. Bhd., now IPEX Global Manufacturing (M) Sdn. Bhd.)Sources

Established I-PEX Global Operations Co., Ltd. in Tokamichi City, Okinawa PrefectureSources

Established an Okinawa factory in Yunoura City, Okinawa PrefectureSources

In June 2020, reorganized and established "I-PEX University" on the former site of Kyushu Information University Kagurazaka Campus in Kagurazaka City, Fukuoka Prefecture; the development and design departments, technology development department, and indirect department previously scattered in Kagurazaka and Onojo factories were moved to the newly built "I-PEX University Main Building" from the former university campusSources

In August 2020, clarified the corporate goals and, to enhance global brand awareness, changed the company name from "First Precision Co., Ltd." to "I-PEX Co., Ltd." and unified the corporate brand to I-PEXSources

Shanghai Third Factory, ChinaSources

The mold production plant "Tech Forest" of I-PEX University was completedSources

In February 2022, to promote sustainable growth, value creation, and corporate restructuring of the I-PEX Group, a mid-to-long-term business plan "I-PEX Vision 2030" was formulated for 2030. The 2030 goal was depicted as "Innovative Product Development & Engineering Solutions eXpert – a company with the technical strength to practice 'digital manufacturing'". To realize this vision, six key initiatives were set: "contributing to a comfortable, safe digital society through innovation", "business structure reform and expansion of business fields", "building the best manufacturing system and advancing capital cost and cash flow management", and the entire group was mobilized to vigorously implement all measures."}]}Sources

The listing segment at the Tokyo Stock Exchange has been converted to the "Prime Market"Sources

Established a Yokohama office in Yokohama City, Kanagawa PrefectureSources

Issued the Group's first integrated reportSources

Launched the piezoelectric MEMS casting businessSources

Established I-PEX Piezo Solutions Co., Ltd. to conduct MEMS casting operationsSources

On July 10, 2023, celebrated the company’s 60th anniversarySources

Entered the energy solutions sector through the RENERATH battery system seriesSources

§07

News

0 ARTICLES

There is no news.

§09

Sources & updates

SOURCES
↑