Open company graph database — free web & API
Login

Japan Machinery Maintenance Co., Ltd.

日本機械保線株式会社
Ticker
—
Listed market
—
Country
Japan
Employees (consolidated)
435
Related companies
2
§01

Basic information

BASIC
Head office
5F, JR Tokai Shinagawa Building B, 2-1-95 Konan, Minato-ku, Tokyo 108-0075, Japan
Chief executive
Yoshihiko Uchida
Capital
100,000,000
Employees (non-consolidated)
428 people
Employees (consolidated)
435 people
Start date
1967-03-03
End date
§02

Websites

1 DOMAINS
§03

Business

8
Rail TransportTechnical Development SupportTrack maintenance operations on the Tokaido ShinkansenTrack maintenance operations on JR Tokai conventional linesTrack condition diagnosisTrack distortion correctionTrack safety inspectionInspection, repair, and fabrication of machinery
§04

Related companies

2 COMPANIES
Company name Group Parent Subsidiary Customer Supplier Alliance Bank Shareholder
Central Japan Railway Company
Group Parent
Kaneko Corporation
Shareholder
Names without a link are companies not yet registered in OpenBizGraph
§05

Network

NETWORK
Drag to move · click to open
§06

History

85 EVENTS

Opening of the Tokaido Shinkansen (Tokyo to Shin-Osaka)Sources

October 1964: Tokaido Shinkansen Opening CeremonySources

Members involved in company establishment preparationsSources

The world’s first high-speed railway, the Tokaido Shinkansen, opened in 1964, requiring advanced track maintenance technology at a millimeter precision tailored for high-speed rail, unlike before. Our company was founded to maintain and repair the Tokaido Shinkansen tracks. Because Shinkansen trains run at about twice the speed of conventional express trains, the tracks are more than twice as prone to distortion, and train sway is greater, necessitating higher-precision track maintenance. Traditional maintenance was performed manually, but that was insufficient, so the introduction of the large track maintenance machine “Multiple Titan Putter” (commonly called “Marutai”) became necessary.Sources

Establishment of Japan Machinery Maintenance Co., Ltd. with capital of 40 million yenSources

Completion of the construction of a work system covering the entire Tokaido Shinkansen lineSources

We became involved in the construction of the Sanyo, Tohoku, and Joetsu Shinkansen, and were entrusted with maintaining all four of Japan’s Shinkansen lines at the time. Shortly after our establishment, we handled maintenance work on the Tokaido Shinkansen, and our performance was recognized, leading us to participate in the construction of the Sanyo, Tohoku, and Joetsu Shinkansen. After each line opened, we were assigned maintenance work, and our operations expanded rapidly.Sources

Contracted track maintenance work by Marutai for the construction of the Sanyo Shinkansen (Shin-Osaka to Okayama)Sources

Opening of the Sanyo Shinkansen (Shin-Osaka to Okayama)Sources

The Sanyo Shinkansen (Shin-Osaka to Okayama) began operations. Commencement of regular track maintenance by MarutaiSources

Addressed Shinkansen noise issues in the Nagoya area of the Tokaido Shinkansen, trialing rail straightening with a single-head straightening machineSources

Established the Hamamatsu maintenance plantSources

The Sanyo Shinkansen (Okayama to Hakata) began operations and started regular maintenance by Marutai. Established the Kokura track sectionSources

Contracted rail welding work using a Soviet-style flash butt welding machine at the Tokaido Shinkansen Yuzuki baseSources

Contracted rail straightening work for Nagoya City SubwaySources

Contracted design and management work for the construction of Fukuoka City SubwaySources

Capital increased from 40 million yen to 80 million yenSources

Opening of the Tohoku Shinkansen (Omiya to Morioka)Sources

Opening of the Joetsu Shinkansen (Omiya to Niigata)Sources

Following the full outsourcing of the Japan National Railways Hamamatsu Rail Center, we have taken on rail welding work.Sources

Based on the policy to outsource the directly managed sections of Shinkansen Marutai work, we are now fully taking on the orders.Sources

Started long rail unloading and loading operations on the Shinkansen.Sources

Commenced rail straightening work on the Tokaido Shinkansen using a 40-car Spanish (Swiss) rail straightening car.Sources

The length of track maintenance expanded to a total of 1,600 km, roughly three times the distance between Tokyo and Osaka. Since the opening of the Tokaido Shinkansen, our company had been involved in maintenance except for some sections, but in 1984 we were assigned to the entire line. This dramatically increased the maintenance length. In 1969, when we began operations, the maintenance length was 830 km per year, but by 1985 it reached 1,600 km per year, roughly doubling over 16 years. We maintained more than three times the length of the approximately 500 km between Tokyo and Osaka.Sources

Capital increased from 80 million yen to 100 million yen (free capital increase).Sources

JR companies were established following the privatization of Japan National Railways.Sources

Commenced rail straightening work on the Sanyo Shinkansen using a 32-car Spanish rail straightening car.Sources

Started operations in the Hamamatsu area of the Tokaido Shinkansen using our own 09-32CSM Marutai from Pallas (Austria).Sources

Tokaido Shinkansen Opening CeremonySources

Commenced rail straightening work on the Tokaido Shinkansen using a 48-car Spanish rail straightening car.Sources

Started track bed maintenance work in the Shizuoka area of the Tokaido Shinkansen using Pallas's KVP-2000 track bed maintenance vehicle.Sources

Our company became a subsidiary of JR Central. With the birth of the 270 km/h “Nozomi”, we placed even greater emphasis on “comfort”. The national railway transformed into JR, and five years later, our company became part of the JR Central group. That year, the Nozomi, the fastest Shinkansen at 270 km/h, began operation, achieving remarkable speed increases. We further focused on improving ride comfort.Sources

Transferred the Tohoku and Joetsu Shinkansen operations to Tohoku Engineering Co., Ltd.Sources

JR Central acquired our shares and became a group company.Sources

Transferred operations west of Osaka to Nishinihon Machinery Maintenance Co., Ltd. (H4.4.1 spin-off).Sources

Started track bed stabilization work in the Shizuoka area of the Shinkansen using Pallas's DTS62N track bed stabilization vehicle.Sources

Commenced rail inspection work on conventional lines using Gemco's (Australia) RTV-A3 rail inspection vehicle.Sources

Started inspection and maintenance of Shinkansen maintenance machinery.Sources

Commenced track and electrical comprehensive testing on conventional lines using the Doctor Tokai test vehicle.Sources

Established a rescue system on the Shinkansen to prepare for maintenance vehicle failures during nighttime operations.Sources

Our new Marutai 09-2X began operations in the Hamamatsu area.Sources

Started inspection and maintenance of three types, including the Multiple Ty Tamer, in the newly completed inspection facility at the Shinkansen Hamamatsu maintenance base.Sources

Started rail straightening work on conventional lines using the 8-car Speno rail straightening vehicle.Sources

We began inspection operations of the “Doctor Yellow” at 270 km/h, the same speed as the Nozomi, to precisely inspect tracks. We were assigned to conduct inspection work with the comprehensive test train “Doctor Yellow”, which examines the condition of Shinkansen tracks. That year, the 700 series Doctor Yellow, identical to the Nozomi, was introduced. Previously, inspections were conducted at 210 km/h, but now they could be performed at 270 km/h, allowing us to measure ride comfort aspects such as sway with high precision under the same conditions as the Shinkansen.Sources

Commenced inspection work on the Shinkansen electric and track comprehensive test vehicle.Sources

Commenced inspection work on the Shinkansen rail flaw detection vehicle.Sources

Commenced inspection work on the new electric and track comprehensive test vehicle 'Doctor Yellow'.Sources

Obtained ISO 9001 certification.Sources

Produced and delivered the first NBS (New Track Bed Replacement Maintenance Vehicle).Sources

Started conventional line Marutai work, contributing to JR Central's maintenance education institutions.Sources

Introduced a new metric 'Comfort Level Improvement by Marutai Work'.Sources

Launched 'NKH News'.Sources

Established corporate philosophy.Sources

Started Marutai work on the main conventional line.Sources

Produced and delivered a new Shinkansen rail flaw detection vehicle.Sources

Commenced flaw detection work using the new Shinkansen rail flaw detection vehicle.Sources

Delivered the new Shinkansen maintenance vehicle proximity alarm system and completed installation.Sources

Held a celebration to commemorate the 40th anniversary of establishment.Sources

Started rail straightening work on the Tokaido Shinkansen using the new Speno rail straightening vehicle.Sources

Fully contracted the inspection vehicle work for the Shinkansen.Sources

Merged the Tokyo, Shizuoka, Nagoya, Osaka, Tokai Shizuoka, and Tokai Nagoya branches to establish 'Shinkansen Eastern Branch', 'Shinkansen Western Branch', and 'Tokai Branch'.Sources

Relocated the Inazawa facility and renamed it 'Nagoya East Facility'.Sources

Merged the Hamamatsu Rail Center and Hamamatsu STM facilities to establish the 'Hamamatsu Rail Management Office'.Sources

Designated as an educational institution for obtaining and renewing qualifications related to maintenance vehicle escort instruction (Shinkansen).Sources

Shizuoka East office relocates and changes its name to 'Kakegawa office'.Sources

Commenced inspection operations using a new rail inspection vehicle for conventional lines.Sources

Our newly acquired Marutai '09-2X-SD' began operations in the Hamamatsu area.Sources

Completed rail welding work using a flash butt welder accompanying the introduction of 150m rails.Sources

Started transporting 150m rails from Nishi-Hamamatsu Freight Station to the Hamamatsu Rail Center premises.Sources

The new Shinkansen Marutai '09-2X/SH' began operations in the Odawara area.Sources

The new Shinkansen Marutai '09-2X/SH' began operations in the Shizuoka area.Sources

Held a celebration to commemorate the 50th anniversary of establishment.Sources

Shinagawa office relocated and changed its name to 'Tokyo office'.Sources

Yoshiwara office relocated and changed its name to 'Fuji office'.Sources

The new Shinkansen Marutai '09-2X/SH' began operations across all regions.{Sources

Existing branches and overseas offices were discontinued, and new "Kansai Branch", "Shizuoka Branch", and an "Office Center" were established.Sources

Certified as a Health Management Excellence Corporation 2020 (Large Enterprise Division).Sources

Received contracts for all conventional line Marutai works, opened the "Ogaki Office", renamed the Hamamatsu Maintenance Factory to "Maintenance Factory", and split the Hamamatsu Rail Office into "Rail Management Office" and "Rail Transportation Office".Sources

The Toyohashi East Office relocated and was renamed "Gamagori Office".Sources

Commenced work using the new inspection vehicle "R600".Sources

Certified as a Health Management Excellence Corporation 2023 (Large Enterprise Division).Sources

Certified as a Health Management Excellence Corporation 2024 (Large Enterprise Division).Sources

Certified as a Health Management Excellence Corporation 2025 (Large Enterprise Division).Sources

Certified as a Health Management Excellence Corporation 2026 (Large Enterprise Division)Sources

Acquired shares of KANEKO Co., Ltd.Sources

§07

News

446 ARTICLES

The Thoughts of a Railway Maintenance Worker Revealed in a Televised InterviewSources

In an interview with METELe (Nagoya Television), a railway maintenance worker from the Nagoya East Office spoke about his daily work. The video showcased the maintenance work that supports safety and comfort, not missing even a 7mm deviation, and depicted the worker protecting 1,970 km of JR Central's tracks.

Notice of the July 2026 Entrance CeremonySources

The entrance ceremony for the 2026 academic year will be held on July 27, 2026.

Job Experience Seminar Reservations for University Graduates of 28th YearSources

Japan Mechanical Railway Maintenance Co., Ltd. has started accepting reservations for a job experience seminar targeted at university graduates of the 28th year. The seminar is scheduled to be held on July 27, 2026.

Notice of FY2026 July Welcoming CeremonySources

This is a notice regarding the FY2026 welcoming ceremony scheduled for July 27, 2026.

Work Experience Seminar Reservations for University Students Graduating in 2028Sources

Nippon Kikai Hosen Co., Ltd. has opened reservations for a work experience seminar for university students graduating in 2028. The seminar is scheduled for July 27, 2026. Interested students can register on the official website.

Announcement of Participation in JR Central Group Online BriefingSources

Japan Machinery Maintenance Co., Ltd. announced on July 24, 2026, that it will participate in the JR Central Group online briefing. The target audience is students expected to graduate in 2028, and the company will provide recruitment information through the online briefing.

Exhibiting at JR Central Group Online Information Session on July 24, 2026Sources

Nippon Kikai Hosen Co., Ltd. announced that it will exhibit at the JR Central Group online information session on July 24, 2026. The session is for students expecting to graduate in 2028.

Announcement of Kaneko Co., Ltd. Share AcquisitionSources

Japan Machine Maintenance Co., Ltd. announced the acquisition of shares of Kaneko Co., Ltd.

Notice Regarding Acquisition of Shares in Kaneko Co., Ltd.Sources

This is a notice regarding the acquisition of shares in Kaneko Co., Ltd. No further details were provided.

High School Student 1-Day Work Experience SessionSources

Japan Machine Maintenance Co., Ltd. announced that it will hold a one-day work experience session for high school students. The event will take place on June 1, 2026, and participants will be able to experience the company's operations.

§08

Public records

GOV
National Tax Agency basic information2010401022508
Source: National Tax Agency Corporate Number Publication Site, basic three itemsSources
Trade name
日本機械保線株式会社
Trade name (kana)
ニホンキカイホセン
Name in English
Corporation type
301
Address
〒108-0075 東京都港区港南2丁目1番95号JR東海品川ビルB棟
Postal code
1080075
Prefecture code
13
City code
103
Address outside Japan
Prefecture in English
City in English
Address outside Japan in English
Corporate number assignment date
2015-10-05
Update date
2018-07-09
Change date
2015-10-05
Registry closure date
Reason for registry closure
Successor corporate number
Details of the change
Latest record
1
Excluded from search
0
Processing type
01
Correction type
1
Trade name image ID
Address image ID
Sequence number
1445779
METI gBizINFO2010401022508
Source: gBizINFO (Ministry of Economy, Trade and Industry)Sources
Corporate number
2010401022508
Trade name
日本機械保線株式会社
Trade name (kana)
ニホンキカイホセン
Trade name (alphabet)
Registry closure date
Reason for registry closure
Registered address
東京都港区港南2丁目1番95号JR東海品川ビルB棟
Postal code
1080075
Prefecture
東京都
Prefecture code
13
City or district
港区
City code
103
Street address
港南2丁目1番95号JR東海品川ビルB棟
Organisation type
301
Processing type
01
Correction type
1
Status
Representative
Capital
Employees
435
Employees (male)
399
Employees (female)
29
Business summary
東海道新幹線、JR東海在来線の線路保守業務
Website URL
http://www.nkh-cjrg.co.jp/
Year founded
Business category
D:建設業
Date established
Unified government qualification - grade
Unified government qualification - business items
Update date
2018-07-09
Key information
2010401022508
§09

Sources & updates

SOURCES
↑