Open company graph database — free web & API
Login

Tohoku Power Generation Industry Co., Ltd.

東北発電工業株式会社Tohoku Electric Power Engineering & Construction Co.,Inc.Alias
Ticker
—
Listed market
—
Country
Japan
Employees (consolidated)
1,709
Related companies
5
§01

Basic information

BASIC
Head office
2-15-29 Omachi, Aoba-ku, Sendai, Miyagi 980-0804, Japan
Chief executive
Sadahiko Ono
Capital
1,000,000,000  (10 100 million)
Employees (non-consolidated)
1,709 people
Employees (consolidated)
1,709 people
Start date
1963-10-01
End date
§02

Websites

1 DOMAINS
§03

Business

16
Electrical equipment constructionEmergency power supply constructionInstrumentation, control, and communication constructionTurbine equipment constructionBoiler equipment constructionUtility equipment constructionBoiler solutionsAdvanced welding constructionSale of materials for concrete and civil engineering worksSurveying, design, manufacture, construction, sale, leasing, diagnosis, and inspection of power generation and transformation facilities, facilities related to the nuclear fuel cycle, telecommunications facilities, and various industrial facilities, as well as their operation and maintenance.Surveying, design, and construction of civil engineering, piping, building, and painting works.Sale of civil engineering and construction materials.Collection, transportation, treatment, disposal, processing, and sale of industrial waste, and collection and transportation of general waste.Businesses related to environmental conservation and pollution prevention.Manufacture, repair, processing, sale, and leasing of electrical appliances and equipment, and machinery and equipment.Security and protection of power generation and transformation facilities.
§04

Related companies

5 COMPANIES
Company name Group Parent Subsidiary Customer Supplier Alliance Bank Shareholder
Tohoku Green Environment Conservation Co., Ltd.
Group
Tōhatsu Hydropower Engineering Co., Ltd.
Group
Tōhoku Electric Power Group
Group
Aqua Power Tohoku Co., Ltd.
Group
Tohoku Electric Power Co., Inc.
Names without a link are companies not yet registered in OpenBizGraph
§05

Network

NETWORK
Drag to move · click to open
§06

History

1201 EVENTS

At the time of establishment, the organization was started by directly inheriting the structure from Tōhoku Kōgyō Co., Ltd. The head office rented part of the third floor of the Tōhoku Den'gyō Kaikan from Tōhoku Kikai Keisan Co., Ltd. (now Tōhoku Information Systems Co., Ltd.). Although not formal, the company began with a three-division structure of Electrical, Painting, and Automotive departments in line with its business categories.Sources

When the company was established, the capital of 30 million yen was fully paid up on January 26, 1959, through the subscription of shares.Sources

The company's registration application was filed on January 31, 1959.Sources

Held the founding general meeting of Tohoku Hatsu Substation Construction Co., Ltd., with capital of 300 million yen.Sources

Tohoku Transmission and Transformation Construction Co., Ltd. (company establishment)Sources

The company "Tohoku Hatsu Den Kōji Co., Ltd." (now Tohoku Hatsu Den Kōgyō Co., Ltd.) was established with the primary mission of efficiently and effectively constructing and repairing power transmission and transformation equipment.Sources

In February 1959, two branch offices were established in Hachinohe and Aizu.Sources

Our company was established on February 1, 1959.Sources

In conjunction with the establishment on February 1, 1959, we enacted the "Employee Working Regulations" and "Special Management Position Working Regulations", as well as ancillary regulations on wages, retirement benefits, clothing allowance, travel expenses, and disaster compensation.Sources

Company founded: Tohoku Hatsu Substation Construction Co., Ltd.Sources

Hachinohe, Aizu Branch OfficeSources

Founded Tohoku Hatsu Substation Construction Co., Ltd.Sources

The registration was completed on February 2.Sources

The handling bank for transfers was set to the 77 Bank Headquarters, and on February 2, accounts for notice deposits, current deposits, and ordinary deposits were opened.Sources

Company established.Sources

Official filings such as the "Employee Working Regulations".Sources

On February 28, a notification deposit was made to Fuji Bank (now Mizuho Bank).Sources

The automotive maintenance factory rented the Kutsukake Factory, which was under construction by Tōhoku Kōgyō Co., Ltd. and completed in March of the same year.Sources

On April 2, an ordinary deposit account was opened at Nihon Kanyō Bank (now Mizuho Bank).Sources

As a result of deliberation, on May 19, the work of Genichi Matsui from Tohoku Electric Power Co., Ltd., Hachinohe Thermal Power Plant, was adopted.Sources

Corporate emblem design decided.Sources

Held the first regular shareholders' meeting.Sources

In June, it was established as the company emblem.Sources

Established the employee badge system.Sources

The company opened a current account at Fuji Bank in July and deposited 10 million yen in the same month.Sources

In November, 5 million yen.Sources

Started in three departments—Electrical, Painting, and Automotive—according to the business categories.Sources

Hachinohe, Aizu Branch OfficeSources

Contract awarded for regular maintenance of thermal power plants.Sources

Automotive Maintenance Kutsukake FactorySources

In May 1960, the head office moved by renting part of the second floor of the Denryoku Building.Sources

In May of the following year, the company borrowed funds, including 5 million yen, for the payment of the right‑of‑use fee for occupying the power building.Sources

3rd Ordinary General Meeting of ShareholdersSources

Employees from the head office, Sendai Thermal Power Plant work site, vehicle factory, and other locations form a company-wide labor unionSources

In August 1960, the automotive maintenance operations were decided at the Hachinohe branch office's workroom.Sources

Sendai Thermal Power WorksiteSources

In November of Showa 35, the company’s labor union was formed by the regular workers of the Sendai Thermal Works, who sought improved treatment.Sources

In the fiscal year Showa 36, as a result of successfully securing thermal construction orders and reducing costs, the company was able to implement its first 8% dividend.Sources

Capital increase; new capital of ¥30 billionSources

In April 1961, we established the "Administrative Regulations" outlining the basic company organization, as well as the "Special Decision Regulations" and "Proposal Regulations".Sources

In April 1961, the head office formally established three departments: Administration, Electrical, and Painting.Sources

Officially started in the three departments of Administration, Electrical, and Painting.Sources

In May of Showa 36, a labor union was formed by employees of the Hachinohe branch office.Sources

4th Ordinary General Meeting of Shareholders heldSources

First issue of the company newsletter publishedSources

On June 24 of the same year, a nearly company‑wide labor union with 114 members was formed when young employees from the headquarters, Sendai Thermal Works, and vehicle factory joined forces with the Hachinohe union.Sources

Jōban Joint Thermal Power No.4 (75,000)Sources

Hachinohe Branch Office Workshop (Vehicle Maintenance)Sources

Safety Committee agreement concludedSources

Jōban Joint Thermal Power No.5 (75,000)Sources

Detailed agreement on the Production Council concludedSources

Niigata Liaison Office (hydropower, thermal power) / Aizu Branch Office → Aizu BranchSources

Labor agreement concludedSources

Kamigo (15,400)Sources

Arakawa Hydroelectric Power, Iwafune (11,500)Sources

Founding Anniversary establishedSources

On February 22 of Showa 37, the previously formed Sendai Thermal Works labor union was dissolved, and the "Tohoku Hatsu Substation Construction Labor Union" (now Tohoku Hatsu Electric Power Industrial Labor Union) became the company‑wide labor union.Sources

Aizu Branch → Aizu Branch, Electrical Department / Niigata Liaison Office → Niigata Branch, Electrical Department (hydropower) / Nigatake Automotive Maintenance Plant → Sendai Vehicle Maintenance PlantSources

Employee training center establishedSources

5th Ordinary General Meeting of Shareholders heldSources

The company newsletter was first issued in June of Showa 37 as the "Internal Public Relations" with a B5 single‑sided copy of about five pages.Sources

Sendai Thermal Power Unit 3 (175,000)Sources

Summer vacation system introducedSources

Mutual Aid Association established to provide employee welfare servicesSources

Safety Management Procedures put into effectSources

Otokorogawa No. 1 (13,500)Sources

Kajikawa (17,000)Sources

By 1964, Hachinohe, Sendai, and Niigata were designated as thermal branch offices, establishing a system for repairing thermal power plants.Sources

In 1964, personnel renewal and enhancement, establishment of workplace discipline, and promises of improved employee welfare and stable livelihoods were made.Sources

From February of Showa 38, February 1 was designated as the company’s founding anniversary and declared a holiday.Sources

Agekawa Unit 1 (53,600)Sources

6th Ordinary General Meeting of Shareholders heldSources

Emergency restoration team organized in response to the Niigata EarthquakeSources

Niigata Thermal Power Unit 1 (125,000)Sources

In September 1964, the Thermal Construction Division was established and the Electrical Division was renamed the Electrical Construction Division.Sources

Administrative Affairs Department → General Affairs Department / Electrical → Electrical Construction DepartmentSources

Four departments: General Affairs, Thermal Power Construction, Electrical Construction, and PaintingSources

First company-wide baseball tournament held (Kawauchi Ground, Sendai City)Sources

Niigata Thermal Power Unit 2 (125,000)Sources

In November of the same year, Akita was established as a branch office, creating a system to handle contract and construction of hydroelectric and thermal power plants.Sources

Hyugawa (14,300)Sources

In January 1964, the 'Regular Employee Employment Rules' were established.Sources

In 1964, the company pursued modernization and increased productivity through the establishment of additional business units, the organization of various regulations, and improvements in labor conditions.Sources

In the fiscal year Showa 39, the Tokyo Olympics were held, and the company’s sales exceeded 400 million yen for the first time due to expanded orders from Tohoku Electric Power Co., Ltd. That year, there were changes in the order classification at Tohoku Electric Power.Sources

In March of Showa 39, an instruction was issued by Tohoku Electric Power Co., Ltd. regarding the order classification for power procurement works, stating that the substation equipment‑related works previously handled would be transferred to Tohoku Electric Works Co., Ltd. (now YUATech Inc.), which dealt a heavy blow to the company’s electrical division.Sources

Engineering Department / Painting Department → Fabrication DepartmentSources

Niigata Liaison Office (thermal power) → Niigata Thermal Power WorksiteSources

7th Ordinary General Meeting of Shareholders heldSources

Agreement on emergency disaster restoration concluded among Tohoku Electric Power, Tohoku Electrical Construction, and our companySources

In April 1965, the Technical Department was established and the Painting Department was changed to the Fabrication Department. As the office became cramped, part of the 6th floor of the Sendai Fuji Building was leased as a sub-office. The sub-office housed the Technical Department, the Thermal Construction Department, and the Electrical Construction Department.Sources

Saturday half-day leave system introducedSources

The 8th Annual General Meeting of Shareholders was heldSources

Weekly regular meeting day for the department managers' meeting establishedSources

The Management Promotion Meeting Guidelines were establishedSources

The first labor-management discussion meeting was heldSources

10th anniversary ceremonySources

The first company-wide volleyball tournament was held (Eiraku Elementary School, Shichigahama Town)Sources

The Management by Objectives System was introducedSources

President Koga received the Medal with Blue RibbonSources

The 11th Annual General Meeting of Shareholders was heldSources

Employee ID cards were discontinued and personal identification cards issuedSources

Niigata Thermal Power Unit 3 (250,000)Sources

A practical test of artificial snow melting using Green Ash was conductedSources

A trial of abalone farming using heated wastewater began (Sendai Thermal Power Station)Sources

In March 1966, the sub-office was moved to the 7th floor of the Sendai Fuji Building. The three departments already occupying the space were moved back to the Power Building, and the executive office and General Affairs Department moved into the sub-office.Sources

In June 1966, the company began formulating a long-term management plan, setting 'advanced technology,' 'responsible construction,' and 'a disciplined and bright workplace' as key guiding principles.Sources

Ryotsu Thermal Power Unit 1 (3,000)Sources

Jōban Joint Thermal Power Nakoso Unit 6 (175,000)Sources

In December 1966, the 'Business Improvement Proposal Regulations' were established.Sources

Engineering Department → Consulting Department / Thermal Power Construction Department → Thermal Power DepartmentSources

Electrical Construction Department → Electrical DepartmentSources

Abolition of the Works DepartmentSources

In March 1967, the Fukushima branch office was established.Sources

In May 1967, the company decided on a basic management policy stating that, in accordance with the purpose of its establishment, it would base its operations on the completion of repair and maintenance of Tohoku Electric Power Co., Ltd.'s hydro and thermal power generation facilities, and also undertake painting work and vehicle maintenance, thereby playing a role in the electric business. Additionally, it would provide consulting services related to power transformation and distribution equipment, and offer technology for the construction and repair of power equipment outside Tohoku Electric Power, striving to contribute to the local community.Sources

At the 9th regular shareholders’ meeting on May 31 of Showa 42, the company changed its name from "Tohoku Hatsu Substation Construction Co., Ltd." to "Tohoku Hatsu Electric Power Industrial Co., Ltd.".Sources

Company name changed to Tohoku Electric Power Engineering Co., Inc.Sources

Following the name change in Showa 42, from issue No. 41 issued in June of that year, the company newsletter was renamed "Tohatsu Dary" and began monthly publication.Sources

In July 1967, branch offices in Aomori and Yamagata were established.Sources

In July of Showa 42, the company successfully secured a contract for installing power generation equipment at the Iwanuwa plant of Nippon Paper Co., Ltd. from Mitsubishi Heavy Industries Co., Ltd. Nagasaki Shipyard.Sources

Isosawa No. 1 (11,000)Sources

In February 1968, the 'Safety Management Regulations' were established.Sources

In February 1968, the Fabrication Department was abolished, and the Technical Department was renamed the Consulting Department, the Thermal Construction Department became the Thermal Department, and the Electrical Construction Department became the Electrical Department. With the addition of the General Affairs Department, the company adopted a four-department structure.Sources

In February 1968, branch offices were established in Tsuruoka, Iwaki, Takada, and Sado, along with the Iwate branch office.Sources

In February 1968, the Hachinohe, Sendai, and Niigata thermal branch offices were reorganized into thermal offices, and deputy managers were appointed at the section level to promote flexible operation of business activities.Sources

The Safety Management Regulations were establishedSources

In April 1968, the Ryōtsu branch office was established.Sources

In April of Showa 43, the company was awarded and executed the installation of filtration water tanks at Niigata Thermal Power Plant, thereby laying the groundwork for subsequent large tank orders.Sources

The 10th Annual General Meeting of Shareholders was heldSources

The Rules on Duties and Authorities were establishedSources

In June 1968, the 'Job Authority Regulations (Provisional Version)' were established.Sources

In July 1968, the company first issued its long-term management plan, and it has been formulated annually since then.Sources

In July 1968 (Showa 43), we received a contract from Ishikawajima-Harima Heavy Industries Co., Ltd. for plant piping work in the Republic of Kuwait and completed our first overseas project.Sources

Ryotsu Thermal Power Station Unit 2 (3,000)Sources

Employee ID cards were issuedSources

Hachinohe Thermal Power Station Unit 3 (250,000)Sources

The “Izayoi-kai,” launched in October 1968 by West Japan Plant Engineering Co., Ltd., Chubu Plant Service Co., Ltd., and our company to exchange information within the industry and promote mutual cooperation,Sources

The first Izayoi-kai (three companies) was held in NagoyaSources

The 'Izayoi Association (Night of the 16th)' was established, comprising Kyushu Thermal Construction Co., Ltd. (now Nishinihon Plant Industry Co., Ltd.), Chubu Thermal Construction Co., Ltd. (now Chubu Plant Service Co., Ltd.), and our company. Its purpose was to exchange information on thermal construction, conduct joint research, and cooperate mutually.Sources

On February 1, Showa 44 (1969), a commemorative ceremony was held at the headquarters and operational facilitiesSources

Akita became our company's first branch office.Sources

The 12th Annual General Meeting of Shareholders was held, and capital was increased to ¥60 millionSources

Niigata Thermal Power Station Unit 4 (250,000)Sources

We contracted and performed the installation work of the filtration water tank at the Akita Thermal Power Plant.Sources

Established a company flag with a white background and a red-dyed corporate emblem, and distributed it to the operational departments.Sources

An extraordinary general meeting of shareholders was held (number of directors changed)Sources

Tohoku Fly Ash was absorbed through a mergerSources

Employee nuclear training beginsSources

Ryotsu Thermal Power Station Unit 3 (5,000)Sources

To avoid competition with some of our operations and for efficient management, Tohoku Fly Ash Co., Ltd. merged with our company.Sources

Akita Thermal Power Station Unit 1 (350,000)Sources

The Fly Ash Department was established.Sources

Jōban Joint Power Nakoso Unit 7 (250,000)Sources

We revised the 'Road Accident Review Committee Guidelines', among other changes.Sources

Placement of 'Safety Specialist' positionsSources

13th regular shareholders' meeting heldSources

Our company and Yachiyo Port Transport Co., Ltd. jointly invested to establish Yachiyo Port Oil Transport Co., Ltd. (now Tohoku Port Services Co., Ltd.) with the purpose of constructing, managing, and operating tanker mooring facilities and oil transport facilities.Sources

Shin-Sendai Thermal Power Station Unit 1 (350,000)Sources

Established subsidiary 'Hachinohe Port Oil Transport' (now Tohoku Port Services)Sources

Our company was commissioned to conduct an experiment aimed at commercializing the 'abalone seedling experiment' that used warm wastewater at the Sendai Thermal Power Plant, which was carried out by the 'Kaki Research Institute'.Sources

Commenced experimental abalone farming under contract from Tohoku Electric PowerSources

We leased the 3rd, 4th, and 5th floors of the newly built Otaichi Power Building from Higashi-Nippon Kogyo Co., Ltd. and relocated our headquarters there.Sources

Moved headquarters to Oomachi Power BuildingSources

We established the Niigata branch, Sendai office, and Tokyo sales office, and reorganized the Sendai vehicle plant. Additionally, Aomori, Yamagata, Aizu, Fukushima, Hachinohe, and Morioka (Iwate branch) became offices, and the Tsuruoka branch office was renamed Sakata branch office.Sources

The Fly Ash Department was reorganized into the Development Department, and an Aquaculture Section was established. The Electrical Department was changed to the Hydropower Department, and a Labor Section was placed under the General Affairs Department.Sources

In 1972, the 13th anniversary of our establishment, we decided to adopt a company anthem to boost employee morale.Sources

Akita Thermal Power Station Unit 2 (350,000)Sources

Our company and Tohoku Electric Power Co., Ltd. jointly invested to establish Tohoku Greening Environmental Conservation Co., Ltd. with the aim of carrying out environmental conservation projects around power facilities.Sources

Established 'Hygiene Management Regulations'Sources

The inaugural general meeting was held in the third-floor conference room of our headquarters, and the Tohoku Power Industry Cooperation Mutual Aid Association was established with the purpose of fostering mutual camaraderie and welfare among members, as well as mutual assistance among members and employees.Sources

Ryotsu Thermal Power Station Unit 4 (5,000)Sources

Hachinohe Thermal Power Station Unit 4 (250,000)Sources

Established 'Document Management Regulations'Sources

15th regular shareholders' meeting heldSources

After the experiment began, we shipped 97,000 units to Niigata Prefecture for the first time.Sources

We revised the 'Job Authority Regulations', among other changes.Sources

We revised the 'Health Management Regulations', among other changes.Sources

We revised the 'Document Management Regulations', among other changes.Sources

Published in February Showa 48 (1973), B5 edition P117, words of publication / President KogaSources

The company anthem was adopted.Sources

Signed basic agreement with Tohoku Electric Power for operation outsourcing of thermal power plant facilitiesSources

The General Affairs Department was expanded to five sections by adding a Planning Section and a Safety and Health Section. Additionally, a Project Office responsible for consulting services related to the construction of the Sakata Joint Thermal Power Plant was established in the Consultant Department, and the Construction and Engineering Sections of the Hydropower Department were abolished and replaced by a Hydropower Section.Sources

The Hachinohe branch, Sendai branch, Shin-Sendai office, Motonaka office, Higashi-Niigata office, and Sendai Machinery Factory were each reorganized and established.Sources

The machine shop was established in April 1973 as our manufacturing division, handling tasks such as smoke ducts and various ducts in power plant construction, and later expanded its scope to include design and fabrication of industrial machinery equipment like tunnel jumbo, continuing its operations.Sources

Project Office established within the Consulting DepartmentSources

Sendai Machinery Factory was established in April 1973 as our manufacturing division, with the goal of producing plant components in-house and leveraging ownership of a manufacturing plant to enhance business operations. It has produced items such as smoke ducts, various ducts, and tower tanks for power plant equipment of companies like Tohoku Electric Power Co., Ltd., and expanded its business by designing and manufacturing industrial machinery equipment such as tunnel jumbo and rotary feeders. It has also manufactured and sold products such as secural fences and capsule egg dome housings.Sources

We succeeded in artificial spawning, opening the way to mass production.Sources

Kanose No. 2 (55,000)Sources

16th regular shareholders' meeting heldSources

Shin-Sendai Thermal Power Station Unit 2 (600,000)Sources

We invited Professor Furuji to hold a company anthem presentation event.Sources

We revised the 'Equipment Management Rules', among other changes.Sources

Held special shareholders' meeting (addition of vice president system)Sources

Conducted joint funeral of former President Koga with Tohoku Electric PowerSources

In November 1973, the “Tohatsu Akebono-kai” was established as a social association for employees who had retired from our company upon reaching the mandatory retirement age.Sources

In November Showa 48 (1973), the 'Tōhatsu Akebono Club' was established as a social club for retireesSources

We entered into a basic agreement for outsourced operation and maintenance of this equipment with Tohoku Electric Power Co., Ltd.Sources

We received and carried out the installation of the flue gas desulfurization equipment at the New Sendai Thermal Power Plant from Kawasaki Heavy Industries Co., Ltd.Sources

We received and carried out the installation of the flue gas desulfurization equipment at the Yachiyo Thermal Power Plant from Mitsubishi Heavy Industries Co., Ltd.Sources

We established various welfare systems to improve employees' wealth formation, housing acquisition, and other welfare-related matters.Sources

Although the 1975 fiscal year was a tough business environment, we increased sales to 7.39 billion yen, a 9.2% rise from the previous year, by actively securing orders for regular inspection and maintenance work at all Tohoku Electric Power Co., Ltd. thermal power plants, as well as various improvement projects such as pollution control at Sakata Joint Thermal Power Co., Ltd.Sources

To address the construction of the Sakata Joint Power Generation Co., Ltd. power plant, the first team from the project office entered the local office.Sources

To cope with fierce competition for orders, the sales department was established, with Sales Section 1 and Sales Section 2. Additionally, the thermal department created a new Planning and Design Section and a Project Office, and in conjunction with these, the Consultant Department was abolished.Sources

The Shin-Sendai and Higashi-Niigata offices were reorganized into branches respectively.Sources

The Sales Department, headed by a director and deputy director, established Sales Section 1 and Sales Section 2, and was launched in August 1975.Sources

In the 1976 fiscal year, sales reached 8.66 billion yen, and the number of non-electricity customers increased to more than 60 companies.Sources

Established 'Household Allowance'Sources

18th regular shareholders' meeting heldSources

In response to the construction work of the Sakata Joint Power Generation Co., Ltd. power plant, all project office staff worked on site.Sources

In the 1977 fiscal year, we handled projects such as the flue gas desulfurization equipment for Unit 3 of the Akita Thermal Power Plant, and for the first time surpassed 12.63 billion yen in sales.Sources

19th regular shareholders' meeting heldSources

Established union-exclusive systemSources

The former General Affairs Department Accounting Section was abolished, and a new Accounting Department was established, with an Accounting Section and a Materials Section.Sources

The first unit of the Sakata Joint Power Generation plant commenced operation.Sources

Held the first company-wide Go and Shogi tournament (until the 30th, Kamogawa Inn, Sendai City)Sources

Our company, as the organizer, held a discussion meeting in Niigata City.Sources

The Sakata office and Sakata branch office were merged into a branch. Additionally, the Katsukenda branch office was established, and the Takada, Iwaki, and Sado branch offices were merged into offices.Sources

Based on the experience of the offshore Miyagi earthquake, the establishment of a major disaster response headquarters and the formulation of operating standards were carried out.Sources

Responded to the offshore Miyagi Prefecture earthquake recoverySources

20th regular shareholders' meeting heldSources

Enactment of the Emergency Disaster Measures RegulationSources

The second unit of the Sakata Joint Power Generation plant commenced operation.Sources

To establish the construction and maintenance system for the Onagawa Nuclear Power Plant, a nuclear division was established within the thermal department.Sources

Establishment of accounting regulations.Sources

20th Anniversary Founding Ceremony (Dental Association Hall)Sources

On February 1, Showa 54 (1979), the headquarters held a commemorative ceremony at the Sendai City Dental Association Hall, and operational facilities held ceremonies at various locations at 10 a.m. that daySources

Enactment of the Accounting Regulation and its SubrulesSources

Held the 21st Regular Shareholders' MeetingSources

Submitted the Security Business Commencement Notice to the Miyagi Prefecture Public Safety CommissionSources

Held the 20th Anniversary Company-wide Safety and Health Experience Presentation Conference (Sendai City, until the 22nd)Sources

Published in September Showa 54 (1979), B5 edition P369, greeting / President GotoSources

An office was also established in Onagawa.Sources

Introduced a bi-weekly two-day weekend system using the half-deck landing methodSources

In 1980 (Showa 55), the focus was on "revitalizing order‑taking activities and reducing costs through overall strength", "enhancing technical skills and strengthening management systems", and "establishing safe work practices and creating a vibrant workplace."Sources

20th Anniversary Art Exhibition (Sendai Art Museum, until February 1st)Sources

Enacted the Outline of the Nuclear Power Promotion CommitteeSources

Enacted the Outline of the Cooperation Company Development Guidance Measures CommitteeSources

Held the 22nd Regular Shareholders' MeetingSources

Akita Thermal Power Station Unit 4 (600,000)Sources

Established the Management Measures Committee (abolished the Emergency Budget Measures Committee)Sources

Chokaigawa No. 3 (20,300)Sources

Our company, as the organizer, held a discussion meeting in Hama-maki City, Iwate Prefecture.Sources

In 1981 (Showa 56), key measures for implementing operations based on the company’s basic management policy, which could be called the corporate ethos, and the three‑year management plan were adopted. The basic policy for strengthening the company’s management foundation in the future is to act as a member of the local community externally, and to promote efficient management based on respect for people internally. The company also committed to "serving the local community through power plant construction for Tohoku Electric Power Co., Ltd." and "strengthening the corporate structure based on respect for people."Sources

In fiscal year 1981, the total exceeded 20.37 billion yen and 20 billion yen due to increased repair work and fuel conversion projects such as the coal‑burning expansion of Unit 1 at Sendai Thermal Power Plant. From that year, the company entered the nuclear field and, through construction and installation of tank units for the Onagawa Nuclear Power Plant and installation of water supply and drainage treatment equipment, recorded its first nuclear division sales.Sources

Establishment of material regulations.Sources

Enacted the Materials Regulation and its SubrulesSources

A Nuclear Division was established to handle radiation management and construction and repair of power plant equipment, and a Safety Management Division was established to oversee security of power plant equipment.Sources

Ryotsu Thermal Power Station Unit 8 (7,500)Sources

Submitted the Security Business Office Establishment Notice to the Niigata Prefecture Public Safety CommissionSources

Sendai Thermal Power Station Unit 1 (completion of coal-firing expansion)Sources

Held the 23rd Regular Shareholders' MeetingSources

Daini Numazawa Unit 1 (230,000)Sources

Commenced security operations within the Kawanohara Nuclear Construction SiteSources

In fiscal year 1982, in addition to the production and installation of tank units for the Onagawa Nuclear Power Plant construction, equipment installation work increased, bringing the total completion cost to 21.67 billion yen, and further expansion in the nuclear field was expected.Sources

Hachinohe Thermal Power Plant Units 1 and 2 decommissionedSources

Daini Numazawa Unit 2 (230,000)Sources

Shin-Sendai Thermal Power Plant Unit 2 (LPG-firing conversion completed)Sources

Held the 24th Regular Shareholders' MeetingSources

The Onagawa office was reorganized into a branch office.Sources

Enacted the Order Acceptance OutlineSources

Hokuriku Power Generation Construction Co., Ltd. joined.Sources

In fiscal year 1983, the five focus areas were "securing orders and reducing costs", "promoting operational efficiency", "enhancing management systems", "strengthening safety management systems", and "implementing key training and education."Sources

Enacted the Safety Management Guidance Guidelines for Cooperation CompaniesSources

Sendai Thermal Power Plant Unit 3 (conversion to coal-only firing completed)Sources

Carried out the funeral of the late Chairman Goto jointly with Tohoku Pole (Genkouan)Sources

Establishment of the Radiation Management GuidelinesSources

Sendai Thermal Power Plant Unit 2 (conversion to coal-only firing completed)Sources

Higashi-Niigata Thermal Power Plant Unit 2 (600,000)Sources

Held the 25th Annual General Meeting of ShareholdersSources

A branch office of Nissho LNG was established.Sources

The company performed the "fuel loading" that had previously been carried out by Tohoku Electric Power Co., Ltd. or the main equipment manufacturer, thereby meeting Tohoku Electric Power’s expectations.Sources

Establishment of the Radiation Management Committee GuidelinesSources

In fiscal year 1984, with the completion of related works for Nissho LNG Co., Ltd., which had begun operations, sales of 24.3 billion yen were recorded.Sources

Held the 1st Company-wide Table Tennis Tournament to commemorate the 25th anniversary of establishmentSources

Administrative assistance, vehicle operation, warehouse work, waterway guard, miscellaneous duties, and maintenance of water and thermal power plants were integrated into employee job categories. Of the 86 regular employees in those categories, a selection test was held for those who applied, and 28 were promoted. Additionally, regular employees were renamed staff, and labor conditions for promoted employees and staff were improved to boost morale.Sources

Established the cost accounting administration guidelines, detailed handling of labor cost calculation by project name, and the guidelines for setting project name symbol numbers.Sources

Implemented retirement age extension (55→60 years)Sources

The quality assurance system for the nuclear division was established in conjunction with Unit 1 of the Noda Nuclear Power Plant, which began operation in June 1984.Sources

Held the 27th Annual General Meeting of ShareholdersSources

Agreed with the labor union on the outline of wage system revisionSources

Established regulations for the Board of Directors, Executive Committee, Management Planning Committee, Technical Committee, Executive Joint Meeting, and Executive MeetingSources

Established the Emergency Disaster Measures Implementation GuidelinesSources

From issue No. 256 in January 1985 (Showa 60), it was titled 'Tohoku Power Industry NEWS'.Sources

At the 13th general meeting in 1985, the establishment of branches was approved.Sources

In fiscal year 1985, the improvement works for de‑oilization as a response to the 1950s oil shock were almost completed, and repair work on thermal power plant equipment due to aging and long‑term shutdowns also decreased significantly. However, increased external power projects such as Mitsubishi Paper Co., Ltd. Hachinohe plant, Kitahoku Paper, and Kajima Joint Thermal Power contributed, resulting in sales of 24.2 billion yen.Sources

Established the Order Promotion Meeting RulesSources

Initiated the Challenge 365 Understanding and Permeation CampaignSources

Established the Disciplinary RegulationsSources

Held the 1st Order Promotion MeetingSources

Held the 28th Annual General Meeting of ShareholdersSources

By July of the same year, six branches had been established.Sources

Awarded Challenge 365 poster finalists (94 entries)Sources

The 'Three-Company Discussion Meeting' was merged into the 'Izayoi Meeting' in a form that resolved the development, and was renamed the 'Six-Company Discussion Meeting'.Sources

In fiscal year 1986, there were also equipment installation works for Jōban Joint Thermal Power, Mitsubishi Paper Co., Ltd. Shirakawa plant, and Hodogaya Chemical Co., Ltd. Koriyama plant, totaling 25.24 billion yen.Sources

The "Challenge 365 Campaign", which set a daily sales target of 100 million yen, was launched starting in fiscal year 1986.Sources

Established the Office Automation Promotion CommitteeSources

Joined the Tohoku Electric Power Health Insurance AssociationSources

Implemented a two-day weekend system including designated Saturday workdaysSources

Held the 29th Annual General Meeting of ShareholdersSources

The challenge was to realize the strengthening and enrichment of the management foundation based on a medium‑to‑long‑term outlook with existing personnel, necessitating the promotion of personnel and labor policies that fully utilize human capabilities. A Labor Department was established with Labor, Payroll and Welfare, and Occupational Safety and Health divisions, and a Personnel Division was set up in the General Affairs Department, creating three divisions alongside the General Affairs and Planning divisions.Sources

Established the Employee Invention and Design RegulationsSources

A branch office in Haramachi was established.Sources

Agreement on wage system revisionSources

At the first 'Six-Company Discussion Meeting', the addition of Hokkaido Plant Services Co., Ltd. (now Hokkaido Power Engineering Co., Ltd.) was approved, and it was renamed the 'Seven-Company Discussion Meeting'.Sources

Our company, as the organizer, held a discussion meeting in Koriyama City, Fukushima Prefecture.Sources

In fiscal year 1987, the focus areas were "strengthening sales activities and increasing revenue", "developing new technologies and exploring new business fields", "strengthening and enriching the management foundation", "actively promoting workplace dialogue activities and creating a vibrant workplace", and "achieving Zero Accidents."Sources

In fiscal year 1987, new wage system regulations related to a competency‑based management system were established. Additionally, the duties of special managers (now: special position holders) were classified into managerial and professional roles, and professional roles were subdivided into professional, safety professional, and technical professional, to utilize professional capabilities.Sources

Sales steadily increased to 26.49 billion yen in fiscal year 1987 and to 27.57 billion yen in fiscal year 1988.Sources

First company-wide results presentation conference of 'Challenge 365 Workplace Dialogue Activities' held (until the 24th)Sources

Implementation of new wage system, announcement of competency level gradingSources

Establishment of Hydropower Specialist CommitteeSources

Introduction of Mutual Aid Association systemSources

30th regular shareholders' meeting heldSources

Establishment of Nuclear Specialist CommitteeSources

At the 16th general meeting in 1988, the name was changed to 'Tohoku Power Industry Cooperation Mutual Aid Association'.Sources

In fiscal year 1988, the focus was on "strengthening sales capabilities and increasing profitability", "developing new technologies and expanding into new business areas", "improving and organizing corporate structure", "creating a bright and energetic workplace", and "realizing Zero Accident."Sources

Established standards for setting up offices and internal organizational structures, aiming to secure efficient sales activities and construction operations.Sources

The mutual aid association was established in August 1988 under the principle of mutual assistance, with the aim of providing employee benefits.Sources

In fiscal year 1990, although the domestic economy was on an upward trend, the impact of repeated electricity rate cuts in the power industry and revenue reductions due to the introduction of consumption tax were expected. Therefore, efforts were made to "strengthen sales activities and reduce costs", "develop new technologies and expand into new business areas", "strengthen the management foundation", "create a bright and energetic workplace", and "realize zero accidents and enhance health management."Sources

In fiscal year 1990, there were projects such as the revival of a suspended power plant of Tohoku Electric Power Co., Ltd., but due to a decline in general market projects, sales revenue amounted to 26.62 billion yen.Sources

Third company-wide results presentation conference of 'Challenge 365 Workplace Dialogue Activities' heldSources

Establishment of 'Coal-fired Power Plant Fire Prevention Measures' guidelinesSources

Start of procurement and outsourcing system operation (mainframe processing)Sources

Opening of mental health counseling office (Tohoku Productivity Headquarters)Sources

32nd regular shareholders' meeting held, capital increased to 800 million yenSources

Start of equipment and material management system operationSources

Start of cost accounting system operationSources

Establishment of 'Organizational Regulation Clarification'Sources

Establishment of 'Quality Management Guidelines'Sources

In March 1989, “Tohatsu-kai” groups were established in each prefecture.Sources

On March 11, Heisei 1 (1989), the headquarters held a commemorative ceremony at Hotel Sendai Plaza, and operational facilities held ceremonies at various locationsSources

Published in October Heisei 1 (1989), B5 edition P211, greeting / Our company: President Endo, Electric: President AkamaSources

Establishment of 'Equipment and Material Management System Operation Guidelines'Sources

Investment in Intelligent Cosmos Research InstituteSources

The Noshiro office was established in March 1991.Sources

Noshiro SiteSources

Fourth company-wide results presentation conference of 'Challenge 365 Workplace Dialogue Activities' heldSources

Establishment of Welfare CommitteeSources

Established the Company-wide Construction Support Management Guidelines.Sources

Held the 33rd regular shareholders' meeting and increased capital to 100 million yen.Sources

Abarock (decorative items) won the Gold Award at the 1991 Tohoku Village Revitalization Merchandise Exhibition and began external sales.Sources

Norio Iwamoto received the Goto Kiyotaro Award from the Chairman of the Society for Thermal Nuclear Power Generation Technology.Sources

Headquarters computer LAN trial operation started.Sources

In fiscal year 1992, the sales target of 36.5 billion yen set by the "Challenge 365 Campaign" was achieved.Sources

Held the 5th company-wide results presentation conference of the 'Challenge 365 Workplace Dialogue Activity' (until the 27th).Sources

Started collaborative research on the demonstration of Tohoku Electric Power's collective wind power system, Ryufuu Wind Park (275 kW × 5 units), (300 kW × 5 units), and (500 kW × 1 unit).Sources

Headquarters computer LAN operation started.Sources

Abarock becomes a recommended product of Miyagi Prefecture's quality products.Sources

Held the 34th regular shareholders' meeting and increased capital to 150 million yen.Sources

Appointed a sales specialist.Sources

Held the first company-wide art competition (headquarters).Sources

The Shinchi office was established in March 1992.Sources

Shinchi SiteSources

In fiscal year 1993, the five-year period (1993-1997) was positioned as a foundation-building phase toward the 21st century, and the "Challenge 500 Campaign" was launched with a sales target of 50 billion yen.Sources

Held the 1st company-wide results presentation conference of the 'Challenge 500 Promotion Campaign' (overall 6th) (until the 25th).Sources

Revised the competency level standard document (merging and eliminating departments).Sources

Started preparations for establishing the Technology Development Research Center.Sources

Started coal ash shipping operations at Sendai Thermal Power Plant.Sources

Held the 35th regular shareholders' meeting and increased capital to 200 million yen.Sources

In March 1993, a Technology Department was established to respond to technological advances, strengthen technical management, and enhance engineering operations.Sources

Technical DepartmentSources

In December 1993, the Noshiro office was reorganized into a branch office.Sources

Noshiro Site → Branch OfficeSources

In fiscal year 1994, to achieve a sales revenue of 50 billion yen, the focus was on "changing mindset and strengthening corporate structure", "strengthening sales activities and reducing costs", "improving technical capability and developing new technologies", "developing human resources and creating a bright and energetic workplace", and "realizing zero accidents and enhancing health management". This goal was achieved three years ahead, in fiscal year 1994.Sources

In fiscal year 1994, during the second year of the "Challenge 500 Campaign", proactive proposal sales were conducted, resulting in sales revenue of 58.56 billion yen, far exceeding the target.Sources

Shinchi Site → Branch OfficeSources

Noshiro Thermal Power Plant Unit 1 (600,000)Sources

In October 1994, the Shinchi office was reorganized into a branch office.Sources

In November 1994, standards for the maintenance and operation management of information and communication networks were established.Sources

In November 1994, the Haramachi office was established.Sources

Haramachi SiteSources

Our company, as the organizer, held a discussion meeting in Sendai City.Sources

In fiscal year 1994, total liabilities on the balance sheet exceeded 20 billion yen.Sources

From fiscal year 1994, due to the amendment of the consolidated financial statements regulations expanding the consolidation scope, it became a consolidated subsidiary of Tohoku Electric Power Co., Ltd.Sources

Established the Technology Development Research Center as a 30th anniversary celebration.Sources

Obtained a permit for industrial waste collection and transportation in Sakai City.Sources

Registered the 'Abarock' trademark.Sources

Held the 2nd company-wide results presentation conference of the 'Challenge 500 Promotion Campaign' (overall 7th) (until the 24th).Sources

Uenotai Geothermal Field OfficeSources

Noshiro Thermal Power Plant Unit 2 (600,000)Sources

In April 1995, the company presented the management vision "Long-Term Management Development Plan for the 21st Century (Active 21)" to ensure that all employees, without being buried in past successes, adapt flexibly to changing social environments and develop steadily.Sources

Sakata Joint Thermal Power Plant Unit 2 (conversion to coal firing completed)Sources

Aikawa Thermal Power Plant Unit 1 (10,000)Sources

Presentation of the Long-Term Management Development Plan for the 21st Century (Active 21)Sources

Revision of 'Safety Work Guidelines (Comprehensive Edition)'Sources

Technology Development Research CenterSources

Aikawa Thermal Power Plant Unit 2 (10,000)Sources

36th Annual General Meeting of Shareholders, capital increased to 300 hundred million yenSources

Soma Kyodo Thermal Power Shinchi Unit 1 (1,000,000)Sources

New deployment of a chemical fire truck at the Onogawa branchSources

In August 1995, the Technology Development Research Center was established as a facility for technology development and practical training aimed at reducing construction costs and labor.Sources

Patent acquisition of FA-MICS treatment agentSources

30th anniversary event of the company-wide baseball tournament heldSources

Operation commencement of protective equipment related to Unit 2 of Onogawa Nuclear Power (Generation)Sources

In December 1995, major revisions were made to accounting-related regulations.Sources

The structure of accounting regulations was changed from "Regulation" - "Rule" - "Guideline" to a two-tier system of "Regulation" - "Standard", and a "Standard Manual" was created as a guide, which remains to this day.Sources

Building on experience in operating nuclear power plants, the company has been subcontracting operation duties for Japan Hōnen Co., Ltd. since 1975, and currently performs the tasks listed in Table 2‑10‑1 in the Operation and Radiation Management Division.Sources

Presentation on the deployment of management measures to respond to economic environmental changesSources

Operation commencement of the integrated transfer data transmission systemSources

The welding plant of the Technology Development Research Center was certified as a 'Quality Management Excellent Factory' by the Power Generation Equipment Technical Inspection Association (8th Eastern Review No. 1)Sources

Sumikawa Branch OfficeSources

Sumikawa Geothermal Power Station (50,000)Sources

Yanaizu-Nishiyama Branch OfficeSources

Yanaizu-Nishiyama Geothermal Power Station (65,000)Sources

Research student visit from the China Education International Exchange AssociationSources

38th Annual General Meeting of Shareholders held, capital increased to 600 hundred million yenSources

Soma Kyodo Thermal Power Shinchi Unit 2 (1,000,000)Sources

Onagawa Nuclear Power Station Unit 2 (825,000)Sources

In September of Heisei 7, the Welfare Committee was established.Sources

Position revisions such as appointment of 'Safety Specialist' and 'Technical Specialist'Sources

In November of Heisei 7, the Financial Housing Transfer Loan System was established.Sources

Obtained a permit for industrial waste collection and transportation in Fukushima PrefectureSources

From fiscal year Heisei 8 onwards, in response to changes in the industrial structure, it was deemed necessary to form markets with an overseas perspective to ensure the company's sustainable stable management. Therefore, together with Tohoku Electric Power Co., Ltd. and YourTech Co., Ltd., we undertook overseas business development targeting major ASEAN countries.Sources

In fiscal year 1996, the capital became 600 million yen, and under the "Special Law on Audits of Corporations" for large companies, it began to be audited by certified public accountants.Sources

First skill competition of the thermal power division held (Technology Development Research Center)Sources

10th company-wide results presentation conference of 'Active 21 Workplace Dialogue Activities' held (until 30th)Sources

Operation commencement of the employment management systemSources

Change of holidays, addition of December 29 (swap of year-end holiday and founding anniversary)Sources

39th Annual General Meeting of Shareholders held, capital increased to 800 hundred million yenSources

Shifted payroll calculation from external outsourcing to in-house processing (changed payroll date from the 20th to the 22nd)Sources

Awarded Minister of Labor's Progress Award (Sendai Branch)Sources

Introduction of half-day leave systemSources

Establishment of Management Efficiency Promotion CommitteeSources

Visit by Vietnam Electric Power Corporation executivesSources

In March of Heisei 8, the Quality Assurance Section was established within the Technical Department.Sources

Kakkonda Geothermal Power Station Unit 2 (33,400)Sources

In August of Heisei 8, the Independent System for Safety and Technical Specialists was established.Sources

In November of Heisei 8, the Haramachi branch office was reorganized into a branch.Sources

Haramachi Office → Branch OfficeSources

Triggered by the loss of the tank piping contract in fiscal year 2007 due to not obtaining the High-Pressure Gas Minister certification, we began obtaining the certification.Sources

In the Heisei 9 fiscal year, the first company-wide skills competition was held to inherit and improve technical skills.Sources

When the Haramachi Thermal Power Plant began operation between 1997 and 1998, the workforce numbered as many as 173 people.Sources

The company-wide skills competition began in fiscal 1997 as a thermal division skills competition.Sources

In March of Heisei 9, the Nuclear Technology Training Room was established within the Nuclear Department.Sources

Rokkasho OfficeSources

In March 1978, the Noda Nuclear Technology Training Center was established, and in January 1983, the Higashidō Nuclear Technology Training Center was set up, both to undertake operator and maintenance personnel training contracted by Tōhoku Electric Power Co., Ltd.Sources

In April of Heisei 9, we enacted, revised, and abolished procurement-related regulations, and revised various personnel and labor regulations.Sources

In obtaining ISO9001 certification, we substantially revised each standard to operate the quality system based on the Quality Manual and procedures.Sources

Haramachi Thermal Power Station Unit 1 (1,000,000)Sources

In October of Heisei 9, the Rules of the Management Efficiency Promotion Committee were established.Sources

In fiscal year Heisei 10, to respond quickly and flexibly to various measures of the power reform aimed at achieving an international cost standard, we set objectives of 'promoting sales development through strengthening sales capabilities', 'rigorous cost reduction', 'enhancing technical strength', 'developing human resources', and 'achieving zero accidents'.Sources

In fiscal year Heisei 10, sales revenue reached 55.11 billion yen.Sources

From the following year, the target was expanded to all young technical employees, and the company-wide skills competition has been held annually, organized by the Engineering Department.Sources

23rd Company-wide Safety and Health Conference held (Shinchi Town)Sources

Katsumata, advisor, received the Third Class, Medal of the Rising SunSources

Company-wide Art and Craft Exhibition held (until 11th)Sources

Active 21 Workplace Dialogue Activity 12th Company-wide Results Presentation Conference held (until 22nd)Sources

Tobishima Branch OfficeSources

We were contracted to operate the Tokashima Thermal Power Plant and carried out operations with a team of employees and partner companies.Sources

20th Company-wide Go and Shogi Tournament held (until 24th, Niigata City)Sources

We received ISO9001 QMS certification from the (Ichi Zai) Power Equipment Technical Inspection Association in June 2010.Sources

Employee Stock Ownership Plan Founding and Membership Board Meeting heldSources

Vietnamese trainees, non-destructive testing training (3 persons, until 22nd)Sources

Establishment of 'Sales Group', organizational restructuring such as direct control of offices by headquartersSources

President Sato (Akira), received the Blue Ribbon AwardSources

In July of Heisei 10, the Tōdō branch office was established.Sources

Higashidori OfficeSources

Company 40th Anniversary, Industrial High School Students' Technology Development Research Center Tour heldSources

15th Company-wide Table Tennis Tournament held (until 13th, Soma City)Sources

41st Annual General Meeting of Shareholders heldSources

3rd Company-wide Skill Competition held (until 25th, Technology Development Research Center)Sources

35th Company-wide Baseball Tournament heldSources

Hanoi Representative OfficeSources

Vietnamese trainees, non-destructive testing training (2 persons, until November 30th, Higashi-Niigata Branch)Sources

President Sudo and others, visit to Myanmar and Vietnam (until 31st)Sources

The 13th company-wide results presentation for the “Active 21 Workplace Dialogue Activities” was held (through the 28th).Sources

Investment in “Tohoku Natural Energy Development”Sources

In the same month, we strengthened sales by assigning sales responsibilities and positioning sales bases, and also implemented major organizational changes such as abolishing the department structure of the headquarters' business agencies and making branch offices directly under the headquarters.Sources

Takada Office → Joetsu OfficeSources

Maki Office → Maki Branch OfficeSources

The Management Efficiency Promotion Committee was abolished.Sources

The Management Structure Innovation Committee was established.Sources

With the organizational revision, the name of the 'Material Regulations' was changed to 'Purchasing Outsourcing Regulations' and the wording of the standards was revised.Sources

Trial operation of the Job Management System began for employees in special positions.Sources

The 42nd Ordinary General Meeting of Shareholders was held.Sources

The 31st company-wide volleyball tournament was held.Sources

The General Affairs Department appointed a person in charge of discovering environmental business.Sources

The General Affairs Department changed “Environmental Business” to “New Business Development.”Sources

The 4th company-wide skills competition was held (through the 24th, Technical Development Research Center).Sources

The 1st company-wide softball tournament was held (through the 17th).Sources

In view of ensuring the safety of local employees associated with the establishment of overseas resident staff offices, we established the 'Crisis Management Procedures'.Sources

The Technical Development Research Center received its ISO 14001 certification registration certificate.Sources

The “Environmental Action Guidelines” and “Environmental Action Plan” were established.Sources

Investment in “Tohoku Energy Service”Sources

Published in January Heisei 12 (2000), A4 edition P135, greeting / Our company: Chairman Sato & President SudoSources

Trainees from the Myanmar Electric Power Enterprise (2 people, through March 7, Higashi-Niigata Branch).Sources

The 21st company-wide Go and Shogi tournament was held (through the 21st, Noshiro City).Sources

The 14th company-wide results presentation for the “Active 21 Workplace Dialogue Activities” was held (through the 26th).Sources

Full-scale operation of the Job Management System began.Sources

From the March fiscal year 2000, the "New Consolidated Financial Reporting System" was introduced under the Securities Trading Act, emphasizing the importance of rapid and accurate disclosure of financial information centered on consolidated financial statements rather than individual statements.Sources

The 43rd Ordinary General Meeting of Shareholders was held.Sources

We implemented a 'Job Management System' for special managerial positions, assigning organizational goals to each individual after obtaining their agreement, and evaluating their actions and achievements.Sources

The 5th company-wide skills competition was held (through the 22nd, Technical Development Research Center).Sources

The 16th company-wide table tennis tournament was held (through the 23rd, Hachinohe City).Sources

The 14th Seven-Company Meeting was held in Niigata, with our company serving as the organizing company.Sources

The 36th company-wide baseball tournament was held (through the 22nd at the Miyagi Employees’ Pension Sports Center).Sources

The person in charge of discovering environmental business in the General Affairs Department was designated as the new business development officer.Sources

We formulated the 'Management Structure Innovation Plan' and presented it in October.Sources

Our company, as the organizer, held a discussion meeting in Niigata City.Sources

Fiscal year 2001 sales were 56.22 billion yen, a 6.5% increase over the previous year.Sources

The job management system was fully introduced in fiscal 2001.Sources

This system was established in conjunction with the introduction of the job management system in fiscal 2001, following a review of positions, grades, and evaluation and promotion. Most of it had remained in place.Sources

We summarized measures such as clarifying the command and control system for construction management, the contracting form, and strengthening employment management for contracting companies.Sources

We contract most of the inspection and routine maintenance work for hydroelectric equipment, except for some parts.Sources

We carried out organizational changes centered on the headquarters' business agencies, renaming the General Affairs Department to 'Planning General Affairs Department', the Labor Department to 'Human Resources and Labor Department', and the Technical Department to 'Engineering Department', and established a Quality Assurance Office within the Engineering Department.Sources

Aiming for total engineering, the Technology Department was reorganized into the Engineering Department.Sources

From issue No. 451 in April 2001 (Heisei 13), it was renamed 'Partnership'.Sources

We fully implemented the 'Job Management System', including general staff positions.Sources

In November 2001, Tohoku Natural Energy Development Co., Ltd. contracted the operation monitoring of the Noshiro Wind Power Plant. The Noshiro branch carries out this work (checking the site and notifying the client when anomalies occur). Note that on July 1, 2015, Tohoku Natural Energy Development Co., Ltd. merged with the successor company Tohoku Seiko Co., Ltd. and became Tohoku Natural Energy Co., Ltd.Sources

In November 2001, the company was commissioned by Tohoku Natural Energy Development Co., Ltd. to monitor the operation of the Noshiro Wind Power Plant. The Noshiro Branch carries out this work by checking the site when an abnormality occurs and notifying the commissioning party.Sources

Fiscal year 2002 was significantly affected by the liberalization of electricity retailing, and due to a decline in maintenance work in the thermal and nuclear divisions, sales fell to 49.39 billion yen, a 12.1% decrease from the previous year.Sources

In fiscal year 2015, we introduced the Occupational Safety and Health Management System (OSHMS).Sources

Since the Heisei 14 fiscal year, the Research and Improvement Achievement Report Meeting, which merged the research results presentation and business improvement results presentation, has been held annually except for cancellations due to heavy snowfall and the Great East Japan Earthquake.Sources

We contracted the 'Small Hydroelectric Plant Maintenance Service', a full outsourcing of equipment maintenance management for hydroelectric facilities under 3,000 kW (74 sites).Sources

To clarify the training system and concretely develop capabilities, the 'Nuclear Division Technical Personnel Development Guidelines' were established in March 2003, and since then, based on these guidelines, OJT has been the foundation, along with group education (basic technical education, specialized education, etc.), manufacturer‑sent education, and Tōhoku Electric Power Co., Ltd.Sources

Changes to company-wide welfare events: baseball to be held annually; the arts and crafts exhibition every three years; and volleyball, table tennis, and go and shogi to be organized independently.Sources

The Nuclear Power Division ISO 9001 Certification Working Group (applicable site: Rokkasho Office) and the Hydropower Division ISO 9001 Certification Working Group (applicable site: Aizu Office) were established.Sources

The Quality Control Regulations and the Internal Quality Audit Rules were established.Sources

The 44th Ordinary General Meeting of Shareholders was held.Sources

The “Partnership 2002 Workplace Dialogue Activities” were launched.Sources

The development of a new system to strategically utilize information became urgent, and development began in August 2002.Sources

The 37th company-wide baseball tournament was held (through September 1 at Wellness Sumpia Miyagi Izumi).Sources

The New Management Structure Innovation Committee was established.Sources

The Partner Company Measures Committee was established.Sources

The 6th company-wide skills competition was held (through the 3rd at the Technology Development and Research Center).Sources

The Occupational Safety and Health Management System was introduced.Sources

Fiscal year 2003 saw an increase in the base of regular inspections, as well as construction projects such as the Shiriro Wind Power Plant, and an increase in general market projects, resulting in sales of 53.79 billion yen, an 8.9% increase over the previous year.Sources

To address the issue of workers from multiple subcontractors working together, the HR and construction management departments conducted a 'Comprehensive Improvement Caravan' to clarify the responsibilities of the main contractor and each subcontractor. Additionally, in collaboration with the construction management department, we created 26 types of 'Unit Work Procedure Manuals', which can be used to supplement work procedures for each construction event and for safety work procedure confirmation sheets for general maintenance tasks.Sources

In fiscal year 2003, in response to changes in the social environment and the realities of the company, we revised and integrated the safety management regulations and the health management regulations, establishing them as the Safety and Health Management Regulations.Sources

In 2003, we organized the Quality Control Office as an independent inspection department.Sources

The 1st Research and Development and Business Improvement Reporting Session (FY 2002).Sources

Trial operation began in April 2003.Sources

Launch ceremony for the new information system (R3).Sources

The 45th Ordinary General Meeting of Shareholders was held.Sources

Developed the 'New Management Structure Innovation Plan' and presented it in July 2003.Sources

Full operation commenced in July of the same year.Sources

The new information system (R3) began operation.Sources

The New Management Structure Innovation Plan was issued.Sources

Abolished the Environmental Department and established an Environmental Technology Office within the Thermal Power Division. Additionally, the Quality Assurance Office within the Engineering Division was separated and established as the Quality Management Office, becoming a corporate function of the headquarters.Sources

In August 2003, we organized five groups: Sales Planning and Management, Power Sales, Non-Power Sales, Sales, and Sales Development.Sources

In August 2004, the Rokkasyo office, and in August 2006, the Noda and Higashidō branches adopted ISO 9001 QMS.Sources

Childcare and family-care leave system.Sources

The 7th company-wide skills competition was held (through the 26th).Sources

Established the “Corporate Ethics Committee Operating Rules” to strengthen the functions of the Corporate Ethics Committee.Sources

The welding factory has been certified by the Power Equipment Technical Inspection Association as a "welding construction factory" under the first domestic "private product certification system" targeting welding parts of electrical equipment.Sources

Certification for the Welding Management Process was obtained.Sources

Establishment of the Corporate Ethics Committee Operating RulesSources

Investment in the establishment of Tohoku Geothermal EnergySources

Held the first Corporate Ethics Committee meeting, where it was decided that the committee would issue notices on the “Internal Promotion Structure” and “Establishment of a Consultation Desk.”Sources

Fiscal year 2004 also saw sales exceed 64.31 billion yen, a 19.6% increase over the previous year, due to the removal of Unit 1 at the Akita Thermal Power Plant, construction of Unit 1 at the Tōdō Nuclear Power Plant, reliability maintenance work at thermal power plants, and an increase in general market projects including construction of large wind power plants at three sites.Sources

In 2004, with the cooperation of customers (installers), we received and completed a project to obtain ministerial certification for high-pressure gas.Sources

The 'Radiation Management Operations' were transferred to Tōhoku Green Environment Conservation Co., Ltd. in 2005 and have since been discontinued.Sources

In March 1978, the Noda Nuclear Technology Training Center was established, and in January 1983, the Higashidō Nuclear Technology Training Center was set up, both to undertake operator and maintenance personnel training contracted by Tōhoku Electric Power Co., Ltd.Sources

2003 Research and Development and Business Improvement ReportSources

Closed the geothermal branch office of the Hydropower Division through integration with nearby facilities, and also closed the Kaku branch office following the cancellation of the Kaku Nuclear Power Plant construction plan.Sources

Commencement of information system equipment and data preservation at Toinx Data Center (IDC)Sources

On March 31, 2004, the 'Defined Benefit Corporate Pension (Contractual Type)' was established as a mechanism to compensate for living expenses after retirement.Sources

Establishment of the Environmental Strategy CommitteeSources

Announcement of the Environmental Policy and Environmental Action GuidelinesSources

Announcement of the Personal Information Protection Policy and Implementation of the Personal Information Handling StandardsSources

Held the 47th Annual Shareholders' MeetingSources

Reorganized the Tōdō Office into a branch office following the commencement of Unit 1 at the Tōdō Nuclear Power Plant.Sources

Termination of the abalone aquaculture businessSources

Established an emergency disaster response headquarters due to the 8/16 offshore Miyagi earthquake (until August 26)Sources

Held the 9th company-wide skills competition (until the 8th)Sources

Established an emergency disaster response headquarters due to the Niigata Shikoku region snow disaster (until the 26th) (Established an emergency disaster response office from December 26 to 28 due to the first emergency system transition)Sources

In fiscal year 2005, a significant decline in orders was expected due to a downturn in large construction projects, but the actual revenue exceeded expectations, reaching 50.47 billion yen, resulting in a 21.5% decrease compared to the previous year.Sources

2005 Research and Development and Business Improvement ReportSources

Trial placement of Deputy Director and Deputy Branch ManagerSources

Completely withdrew from the vehicle maintenance business, which had been in operation since the company's founding, and closed the Sendai Vehicle Factory.Sources

Submission of the Ministerial Certification Application for the High-Pressure Gas Safety ActSources

Withdrawal from the fisheries businessSources

Appointment of the general position 'Chief Leader'Sources

From issue No. 498 in June-July 2005 (Heisei 17), it was published roughly twice per quarter.Sources

Board resolution on the 'Basic Policy on the System to Ensure Proper Operations' for building an internal control system, announcement of the Corporate Conduct Guidelines, and other reorganization of corporate ethics-related regulationsSources

Discontinued the aquaculture facilities due to the shutdown of the Sendai Thermal Power Plant, which caused the loss of warm water supply.Sources

Establishment of an internal corporate ethics consultation deskSources

In August 2003, the Rokkasyo Office, and in August 2005, the Onagawa and Tōdō Branches adopted ISO 9001 QMS.Sources

Held the 48th Annual Shareholders' Meeting and amended the articles of incorporation, including changes to the business purposeSources

Establishment of Internal Audit RegulationsSources

10th Company-wide Skills Competition held (until the 24th)Sources

In fiscal year 2006, in addition to the completion of construction work for the Tokushinagata Power Station Unit 4-2 series and the decommissioning of Unit 3 at Sendai Power Station, and an increase in the base number of periodic inspection work at Onagawa Nuclear Power Plant, sales revenue reached 58.38 billion yen, a 15.7% increase over the previous year.Sources

Subsequently, the same system was upgraded in fiscal year 2006.Sources

Our operational audits commenced.Sources

We established a system to run a PDCA cycle based on construction specifications and work procedures incorporating risk assessment, and implemented effective safety management through the introduction of a new TBM-KY method.Sources

Implemented common technical training for new employees in the technical field since the Heisei 18 fiscal year.Sources

In March 2006, the Business Promotion Department of the Tohoku Electric Power Co., Inc. Group instructed the company to use business computer usage times as objective data for determining working hours and to ensure thorough management of working hours.Sources

Completely withdrew from the aquaculture business.Sources

Presented the 'Maintenance, Consolidation, and Strengthening' policy in April 2006.Sources

Revised the corporate conduct guidelines and amended related regulations concerning the corporate ethics committee and related systems in response to new laws such as the Personal Information Protection Law, the Whistleblower Protection Law, and the Companies Act (internal controls).Sources

Revised the meeting requirements to enable an immediate response in emergencies and renamed the rules the “Corporate Ethics Committee Regulations.” Also clarified that notices from the committee would govern the consultation desk and internal promotion structure, and established the “Standards for Handling the Corporate Ethics Consultation Desk, etc.”Sources

Established the “Basic Policy on Systems to Ensure the Proper Conduct of Business.”Sources

At the 289th meeting of the Board of Directors held on June 13, 2006, the “Basic Policy for Systems to Ensure the Proper Conduct of Business” was adopted.Sources

At the 289th Board of Directors meeting, adopted the 'Basic Policy on the System to Ensure Proper Operations.'Sources

Internal Audit Regulations were established in July 2006.Sources

Established the Internal Audit Regulations.Sources

Internal Audit Regulations established; operational audits conducted by the relevant departments commencedSources

The Internal Audit Regulations were established and took effect on August 1, 2006.Sources

From issue No. 508 in August-September 2006 (Heisei 18), it became a bi-monthly publication.Sources

Clarified its role as a construction implementation agency and, to further improve quality management, separated the welding section of the Technology Development Research Center and established a 'Welding Factory.'Sources

The welding shop was established independently from the Technology Development Research Center in August 2006, handling welding of critical equipment such as those subject to Article 52 of the Electric Business Act (welding contractor inspection). Its advanced welding technology was highly praised by customers.Sources

After acquiring welding skills such as large-diameter thick-walled pipe welding, the welding factory gained construction capabilities as a project execution entity and became independent from the headquarters' Technology Development Research Center.Sources

In fiscal year 2007, due to an increase in the base number of periodic inspection work, including the periodic inspection of Unit 1 at Tohoku Nuclear Power Plant, sales revenue reached 66.13 billion yen, a 13.3% increase over the previous year.Sources

Since FY2007, the company has aimed to promote mental health and has regularly administered the Central Labour Accident Prevention Association’s Brief Job Stress Questionnaire (stress check) twice a year, in April and October. It has worked to encourage self-care and line care, and to understand and improve the workplace environment by using aggregated data.Sources

Since January 2007, the TWCS (Tōhatsu Waste Communication Sheet) has been issued to provide the entire company with information on regulatory changes related to industrial waste disposal.Sources

FY 2006 R&D and Business Improvement Report MeetingSources

Hiroshi Nagano, recipient of the Encouragement Award from the Japan Energy SocietySources

At the Aikawa Thermal Power Station, following remote monitoring and control from Tohoku Electric Power Co., Ltd. Sado Sales Office, we have been contracted for on-site operations since March 2007, conducting inspections and routine checks, on-site operation support, fuel oil reception, etc., under a 4-shift 3-rotation work system.Sources

A rehabilitation work program was established in April 2010.Sources

On April 1, 2007, the 'Cumulative Compensatory Leave System' was established. The purpose of this system is to further promote work‑life balance and improve labor productivity. It stipulates that if the cumulative overtime and holiday work hours exceed the prescribed working hours for each work type, compensatory leave will be granted, and the grant period will be from the day after overtime or holiday work occurs until the end of the following month. Additionally, the rule for substitute holidays was amended from 'designated by the end of the second month' to 'designated within the same week.'Sources

After examination by the High-Pressure Gas Safety Association, we obtained ministerial certification (pipe category) for high-pressure gas in April 2007.Sources

Launch of the T-EMS (Tōhoku Electric Power Group Environmental Management System)Sources

Cumulative Compensatory Leave SystemSources

Establishment of an External Corporate Ethics Consultation Desk (Mishima Law Office)Sources

At the 35th general meeting, the organization was changed to be operated primarily by partner companies, and our company will participate as one auditor and as a participant.Sources

Fire incident at the coal ash handling plant of Soma Joint Power Generation Co., Ltd., Shinchi Power Plant Unit 2Sources

49th Annual General Meeting of Shareholders heldSources

11th Company-wide Skills Competition held (until the 30th)Sources

Since September 2007, the company had created and rolled out company-wide a “Computer Usage Record Ledger” that compared each employee’s business computer usage time with the time recorded in the R/3 attendance system and documented the reasons for any discrepancies.Sources

From the 'Fall 2007' issue published in October 2007 (Heisei 19), it was made a quarterly publication (once every three months).Sources

In fiscal year 2008, sales revenue was 59.251 billion yen, a 10.4% decline compared to the previous year, due to a downturn in large construction projects such as the completion of the Nobechi Wind Farm and Sakata Recycling Center, and a decrease in the base number of periodic inspections at nuclear power plants.Sources

Following the replacement work of Unit 4 of the Sendai Thermal Power Plant in 2008, replacement projects for the Niigata Thermal Power Plant Series 5, Hachinohe Thermal Power Plant Unit 5, and the Shin-Sendai Thermal Power Plant Series 3-1 and 3-2 for combined-cycle power plants followed.Sources

In 2008, shipments by sea as cement raw-material ash began, as did transportation to privately operated disposal sites under direct contracts with electric power companies; as a result, the number of contracted transport vehicles decreased substantially.Sources

In 2008, all permits for industrial waste treatment in Yamagata Prefecture, Niigata Prefecture, Niigata City, Akita City, Sakai City, Aomori City, Morioka City, Sendai City, Aomori Prefecture, and other areas were discontinued.Sources

In 2008, a 'Industrial Waste Consultation Desk' was established in the portal site's mailbox, enabling timely responses to inquiries from business agencies.Sources

In 2008, we contracted services such as group training, external dispatch training, and OJT training for young maintenance staff, expanding our business.Sources

50th Anniversary of FoundingSources

50th Anniversary Founding Ceremony held at the Eiyo Grand HotelSources

Suspension of operation of the former 'Sōgō Dormitory' at Sakata BranchSources

Establishment of the 'Removal Work Group' (Unit 3) at Niigata BranchSources

Opening ceremony and commemorative tree planting for the 50th Anniversary Project 'Touhatsu no Mori'Sources

Establishment of the Labor Hours and Other Improvement Committee (Labor-Management Committee)Sources

Company-wide implementation of the Industrial Waste Management System (in-house system)Sources

51st Annual General Meeting held, amendment of articles of incorporation regarding the number of directors, and appointment of Chairman Sato (Zan) and President SuzukiSources

Reorganization of Niigata Branch's 'Removal Work Group' (Unit 3 removal & Unit 5 construction) into 'Construction & Removal Work Group'Sources

Launch of Corporate Ethics Month events, including corporate group events, president's message, corporate ethics patches, and corporate ethics surveysSources

Commencement of clinker ash sales from the new plant of Soma Joint Power Generation Co., Ltd.Sources

Implementation of TV conference system (nuclear division), satellite phone, priority mobile phone, and dedicated FAX for the emergency response headquarters.Sources

Completion of the Morioka office building.Sources

On March 1, 2008, the Business Management Office was established within the Planning and General Affairs Department as an internal audit organization equivalent to an independent organizational unit. Responsibility for conducting “business audits” was transferred from the relevant departments to the Business Management Office.Sources

Established the Operations Management Office as an internal audit division staffed by dedicated personnel within the Planning and General Affairs Department.Sources

“Business Administration Office” established within the Planning and General Affairs DepartmentSources

With the enforcement of the Companies Act, revisions of accounting standards, strengthening of internal control systems under the Financial Instruments and Exchange Act, and related core system upgrades, we made substantial revisions to various standards, including cost accounting handling.Sources

In response to centralizing purchasing outsourcing operations at headquarters and introducing an internet transaction (EDI) system and integrating TQC/QMS, we revised the purchasing outsourcing regulations and related standards.Sources

In April 2008, we established a company-wide QMS by integrating TQC and QMS, making all our organizations part of the certification scope.Sources

At the Haramachi Thermal Power Plant, sales of Type II products were suspended from April 2008, leaving only Type IV products for sale.Sources

In July 2008, a Civil Engineering and Architecture Division was newly established at the Onagawa Nuclear Power Plant of Tohoku Electric Power Co., Ltd. To respond promptly, the Onagawa Branch established the division in August 2009.Sources

Starting in August 2008, a comprehensive operation was launched with the objectives of maintaining decision‑making speed, creating surplus for department and branch managers, and expanding career‑up opportunities for future executive candidates.Sources

In August 2008, we established the Construction Industry Law Implementation Guidelines and have been striving to comply with the Construction Industry Law and related regulations.Sources

In August 2008, the Oikawa branch established a civil engineering and construction department.Sources

Prior to other commemorative projects, on September 30, 2008, company executives attended a luncheon at the Seiyo Grand Hotel in Aoba-ku, Sendai.Sources

In October 2008, the company became the first company in the electric power group to receive T-EMS certification.Sources

A retirement age was set for the Career Partner Program in November 2014.Sources

In November 2008, the Tohoku Hatsuden Kogyo Labor Union requested cooperation, including the establishment of company-wide labor-management meetings, for the rollout of the “New Work-Life Balance Movement.” The company supported the aims of the movement from the perspective of reducing total annual actual working hours.Sources

It was decided to establish the “Working Hours Improvement Committee” starting in fiscal year 2009.Sources

In 2010, Soma Joint Power Generation Co., Ltd.'s Shinchi Power Plant manufactured clean ash, which our company purchased after quality control and began selling.Sources

New visions outlining the long‑term direction of the Tohoku Electric Power Group, namely the 'Tohoku Electric Power Group Management Vision 2020' and the 'Tohoku Electric Power Group Mid‑Term Management Policy,' were formulated, indicating policies such as promoting management efficiency and enhancing corporate profitability through the group's integrated strength, and ensuring safety and advancing business quality.Sources

Beginning in FY2009, in response to Tohoku Electric Power Group Corporate Ethics Month, the company also began holding corporate ethics month events.Sources

Beginning in fiscal 2009, the company decided to establish the “Working Hours Improvement Committee” as a labor-management committee. Its purpose was to implement effective measures on working hours and related matters—including reducing employees’ overtime and increasing the use of paid leave—at each operational workplace, and to work toward reducing total annual actual working hours.Sources

Since the Heisei 21 fiscal year, a department-wide technical education system was built and implemented up to the third year of employment to foster early development of work supervisors and ensure capability.Sources

Construction work on Series 5 that started in FY2009.Sources

In 2009, Shinchi Power Station of Soma Kyodo Power Co., Ltd. began producing clinker ash. The company purchased quality-controlled material from the power station and also began selling it.Sources

At the Noshiro Branch, sales had been temporarily suspended in fiscal 2009 due to concerns about environmental safety.Sources

Technical education for technical employees had been conducted mainly through departmental training and OJT at each head office business unit, but in fiscal 2009, to promote early development and ensure competence of young technical employees for maintaining and strengthening competitiveness, the Engineering Department started a unified technical common education program to acquire knowledge, skills, and safety management required for on-site construction across all departments.Sources

Since fiscal 2009, for selected contracts among the subcontracted and maintenance contracts of each operational business unit, young employees have been directly managing the work.Sources

Held on Monday, February 2, 2009. • Part 1: Commemorative ceremony (company-wide broadcast). Attendees included all employees and, as possible, partners from cooperating companies. • Part 2: Commemorative lecture (Seiyo Grand Hotel, Aoba-ku, Sendai). Speaker: nonfiction author Mr. Kazuma Yamane. Title: 'The New Era of Manufacturing – The Shine of Metal Color, Again'. • Part 3: Commemorative celebration (Seiyo Grand Hotel). 156 guests and 87 workplace and union representatives attended.Sources

Published a two-part feature article introducing our operations and a gratitude advertisement expressing appreciation to customers in the Electric News on February 2.Sources

An action plan for women's advancement was created in March 2016.Sources

Email monitoring and virus detection are carried out using S-Wing#C, a service that began in March 2009.Sources

Following the establishment of accounting standards concerning construction contracts, we revised revenue recognition standards associated with the application of construction progress standards.Sources

Revisions such as changes to the subcontract accounting method associated with the application of construction progress standards.Sources

On March 24, 2009, the opening ceremony of 'Tōhatsu no Mori' was held with guests including the Deputy Governor of Miyagi Prefecture and the mayor of Rifu Town. After the ceremony, the president and about 50 employees planted trees (the event was covered by TV Asahi and the Kōbe Shimbun).Sources

In April 2015, the Labor Day holiday, which had made May 1 a holiday each year, was abolished and winter holidays were established.Sources

In April 2009, we began performing equipment diagnostic services contracted by Tōhoku Electric Power Co., Ltd.Sources

Starting in June 2009, the company continued to publish an occasional “Environmental E-mail Newsletter” to raise environmental awareness among employees.Sources

In August 2016, the use of former surnames was approved.Sources

In August 2009, a temporary organization, the Niigata Branch 'Construction and Demolition Group', was established and carried out construction work.Sources

Since September 2009, this training session had been held for newly appointed section managers serving as workplace coordinators for corporate ethics, with outside instructors invited to lead it.Sources

In October 2009, a decision was made to implement measures for an earthquake off the coast of Miyagi Prefecture, which was expected to occur in the near future.Sources

Decided to implement measures against the expected Miyagi Prefecture offshore earthquake that was anticipated to occur in the near future. Conducted seismic inspections of buildings completed by the end of Showa 63 (1988) at operational facilities, and carried out reinforcement work based on the inspection results. Additionally, strengthened communication equipment by deploying satellite phones, TV conference systems, priority mobile phones, and fixed phones for use during power outages, thereby multilayering the information and communication network. Furthermore, for power outage measures, we equipped emergency inverter generators capable of supporting PCs, halogen floodlights, etc., and implemented measures such as storing emergency food and water for each employee for three days.Sources

Beginning in October 2009, before the Great East Japan Earthquake, seismic assessments were conducted on buildings completed by 1988 at all business offices, and reinforcement work was carried out based on the results. To strengthen communications equipment, the communications network was made more redundant by installing satellite phones, TV conference systems, priority mobile phones, and telephones for use during power outages. In addition, measures were taken to address power outages, including installing emergency inverter generators that could also power PCs and halogen floodlights, as well as stockpiling three days' worth of emergency food per employee and water at a guideline of 2 liters per person per day.Sources

Operation of the head office building's entry and exit management system began in November 2009.Sources

November 2009: Morioka Office buildingSources

The second disposal site in the Warita area began operating in November 2009 and was operated alongside the first disposal site in the Osaku area.Sources

In January 2017, the Assist Partner System was established.Sources

All permits were abolished in 2009.Sources

Our company, as the organizer, held a discussion meeting in Niigata City.Sources

These policies were incorporated into the mid‑term management plan for fiscal year 2009, and we committed to reliably implementing them with the perspectives of 'maintenance,' 'strengthening,' and 'summarization' that have continued since fiscal year 2007.Sources

To cultivate talent that strengthens competitiveness early, the company established the 'Technical Safety Education and Training Promotion Office' within the Engineering Department in 2009, advancing the foundation for implementing common technical education guidelines and systematization.Sources

The Job Management System Follow-up Committee had been scheduled to meet regularly. However, since the system had taken hold without any operational issues, the meeting schedule was changed so that it would convene only as needed, with the aim of improving efficiency. (Fiscal 2010)Sources

January 2010: Construction site associated with the relocation of the Joetsu Office buildingSources

Starting with the 23rd meeting in 2010, when our company served as the organizing company, the group was renamed the “Eleven-Company Roundtable,”Sources

In 2010, few companies had already introduced support systems for employees with illnesses, and the company faced difficulties in considering the details of such a system. Nevertheless, it established the “Standards for Administering the Rehabilitation Work Program.”Sources

In fiscal year 2010, the machine factory division and welding factory division were merged, and the Lifu Manufacturing Factory division was established.Sources

We formulated company-wide measures to prevent recurrence of falling and falling accidents and implemented mandatory use of double-layer safety harnesses.Sources

In fiscal year 2010, we launched a 'Pure General Marketing Strategy' focusing on profitability in the general market and discovering and deepening base customers, working to balance power projects and general market projects.Sources

Responsible for common training across the technical departments, the Technical Safety Training Promotion Office was established within the department.Sources

In the Heisei 22 fiscal year, 'SiC refractory material installation for ash deposition reduction' was carried out. To reduce ash deposition around the burners of coal boilers in a reducing atmosphere, we jointly developed SiC refractory materials with Nichias Co., Ltd. and have accumulated installation achievements.Sources

Launch of the S-WING#C system (email software, facility reservation system, S-WING portal, etc.) with unified basic functions across the corporate group.Sources

February 2010 issue, A4 size, page 184, greeting: jointly signed by Chairman Sato and President Suzuki of our company; Electric: President Takahashi.Sources

We unified the accounting unit from being set per business unit to 'company-wide'. Additionally, we standardized the planned unit price for the construction division and allocated indirect costs and general administrative expenses at the same rate across the company, significantly revising the management accounting financial reporting system to the present. We aligned it with statutory financial statements, eliminated profit and loss disparities between units caused by uncontrollable factors, and made the accounting unit more suitable for our business model.Sources

In March 2010, we contracted equipment diagnostic services from Tōhoku Electric Power Co., Ltd., and are implementing them in the Construction Management Division.Sources

Disbandment of the (Unit 1 & 2) 'Removal Work Group' at Sendai Thermal Power Plant.Sources

In April 2017, the retirement age for Career Partners was raised from 70 to 75.Sources

At Haramoto Power Plant, sales of Type II fly ash were suspended from April 2009, with only Type IV fly ash sold thereafter.Sources

Established the "Rehabilitation Work System." This system sets standards for providing service support when returning to work after long‑term leave due to physical or mental occupational injuries, making it possible to work the prescribed hours from the first day of return.Sources

In April 2010, the company introduced a "workwear recycling system" under the wide-area certification scheme to standardize proper disposal methods company-wide and reduce environmental impact through recycling.Sources

Introduction of a workwear recycling system.Sources

Implementation of a rehabilitation work system.Sources

Changed the number of standing corporate auditors from one to several.Sources

Held the 52nd regular shareholders' meeting and amended the articles of incorporation to change the number of permanent auditors.Sources

Reassigned the 'Sendai Thermal Power Plant' under the jurisdiction of the new Sendai branch to be directly under headquarters.Sources

Established the 'Technical Safety Education and Training Promotion Office' (building, trial, and verification of a common technical education system, planning of the Rifu Technical Training Center).Sources

In August 2017, the scope of Chief Leader assignments was expanded.Sources

August 2010: Construction site for the second new dormitory of the Higashidori BranchSources

In August 2010, the Engineering Department established the Technical Safety Education and Training Promotion Office, organized the framework and implementation guidelines for technical common education, and facilitated a smooth transition within the Engineering Department.Sources

Disbandment of the 'Sendai Thermal Construction Site' (Unit 4) at the new Sendai branch.Sources

Established the 'Operation and Radiation Management Section' at the Rokkasyo office.Sources

In October 2017, an hourly leave system was established.Sources

In October 2011, the company jointly received the '3R Minister of Land, Infrastructure, Transport and Tourism Award' along with Akita Prefecture, Noshiro Power Plant, and Noshiro Yamamoto Concrete Co-op.Sources

Demolition work on Unit 3 of Niigata Power Plant was carried out (October 2010 – March 2012).Sources

Fly ash concrete utilizing Noshiro-produced fly ash (Type II) received the '3R Minister of Land, Infrastructure, Transport and Tourism Award' in October 2010, jointly with Akita Prefecture, Noshiro Thermal Power Plant, and Noshiro Yamamoto Ready-Mix Concrete Cooperative.Sources

In October 2010, we contracted and are performing work on the certification of maintenance skills for personnel engaged in nuclear power plant maintenance, from Tōhoku Electric Power Co., Ltd.Sources

Standard use of fly ash mixed concrete received the 'Reduce, Reuse, Recycle Promotion Award' in FY2010 (Heisei 22), and the 3R Minister of Land, Infrastructure, Transport and Tourism Award was jointly received with Noshiro Thermal, Akita Prefecture, and the Ready-Mix Concrete Association.Sources

In the same year, the company was also affected by a major natural disaster called the 'Niigata–Fukushima Heavy Rain.' Therefore, in fiscal year 2012, we prioritized and focused on recovery and revitalization from earthquakes and flooding, and on thorough cost reduction and restructuring of the financial balance.Sources

In 2011, we suffered extensive damage from the natural disasters of the Great East Japan Earthquake and the Niigata-Fukushima heavy rains. The entire company, together with our partner companies, worked with all its strength on large-scale projects, including earthquake recovery work and emergency power supply installation work.Sources

In light of the major earthquake, measures were implemented including adding satellite phones and installing a second generator.Sources

Following a trial operation in fiscal 2011, the company fully introduced the mentoring system in fiscal 2012.Sources

In fiscal year 2011, we recorded a record high of 73.9 billion yen due to earthquake recovery work. Major projects included emergency power installation in Hachinohe, Higashikushiro, and Niigata, and the new construction of the Sendai 3 series.Sources

Due to the impact of the Great East Japan Earthquake, we received orders for disaster recovery work and emergency power installation, and in fiscal year 2011, disaster-related projects led to the highest sales since the company's founding.Sources

Since 2011, our company has been the prime contractor for projects related to this power plant, and the Higashi-Niigata branch has performed maintenance, including periodic inspections of boiler and turbine equipment.Sources

Frontier Energy Niigata's periodic inspection work on power plant equipment has been carried out annually since 2011 and continues to this year.Sources

During the period when operations were temporarily suspended due to the Great East Japan Earthquake in 2011, the company secured work by, for example, transporting coal to Shinchi Power Station, which had resumed operations first.Sources

In 2011, the company introduced its in-house industrial waste management system company-wide.Sources

The Sendai Machine Shop and the Welding Shop were integrated to streamline welding‑related operations, and the Rifu Manufacturing Factory was established.Sources

The Sendai Machinery Plant and Welding Plant were merged → Rifu Manufacturing PlantSources

To consolidate production and processing operations and improve the efficiency of welding-related work, the Rifu Manufacturing Plant was established by integrating the Sendai Machinery Plant and the Welding Plant. (March 2011)Sources

In the fiscal year 2010 financial statements, we recorded a special loss (disaster loss) of 94.9 million yen for the 'Great East Japan Earthquake' that occurred in March 2011, covering depreciation of fixed assets, inspection and removal costs of collapsed assets, restoration costs, condolence money for victims, hotel accommodation expenses, and other costs incurred that year, as well as anticipated recovery costs in subsequent years. This was in accordance with the 'Audit Response Regarding Disaster in the Tohoku Pacific Ocean Earthquake' issued by the Japan Institute of Certified Public Accountants.Sources

Interrupted after the Great East Japan Earthquake that occurred in March of Heisei 23.Sources

Since the Great East Japan Earthquake in March 2011, clinker ash from Shinchi Power Station and the Haramachi Thermal Power Plant has been used in quantities of tens of thousands of tonnes per year as embankment material for disaster-prevention forests along the affected Fukushima coast, making a major contribution to the recovery of the local area.Sources

The company-wide skills competition was temporarily suspended due to the Great East Japan Earthquake that occurred in March 2011.Sources

To centralize manufacturing and processing related to power plant construction and maintenance, and to streamline welding-related operations for Sendai Machinery Factory and the welding factory, we integrated the two facilities and established the Rifu Manufacturing Factory, creating a system that centrally manages the entire welding fabrication process and improves product quality.Sources

Integrated the Sendai Machinery Factory and Welding Factory to establish the 'Rifu Manufacturing Factory'.Sources

The Great East Japan Earthquake occurred on March 11, 2011.Sources

Level 2 emergency status was automatically activated at the same time as the earthquake occurred at 14:46 on Friday, March 11, 2011.Sources

On March 11, 2011 at 2:46 p.m., the Great East Japan Earthquake occurred, causing severe damage to Tohoku Electric Power Co., Ltd. and our company. Consequently, in fiscal year 2011, we prioritized and focused on tasks and operations aimed at quickly securing Tohoku Electric Power's power supply and restoring and revitalizing the region.Sources

At the time of the earthquake, we automatically activated the second emergency system in accordance with the Disaster Response Implementation Guidelines. Much of our damage occurred at operational facilities on the Pacific side, and particularly the buildings of the Shin-Sendai branch and Sendai Thermal Power Plant, as well as two dormitories at the Onagawa branch, were almost completely destroyed. In this situation, we worked tirelessly to fulfill our mission of 'providing electricity' by restoring power generation facilities, including the damaged thermal power plants on the Pacific side, and inspecting and repairing equipment at the isolated Onagawa Nuclear Power Plant.Sources

The Great East Japan Earthquake occurredSources

At 14:46 on Friday, March 11, 2011, when the earthquake struck, the Level 2 Emergency Response System was automatically activated and an Emergency Disaster Countermeasures Headquarters was established.Sources

During the Great East Japan Earthquake on March 11, 2011, power plants on the Pacific side suffered catastrophic damage due to the tsunami. In particular, the Haramoto Thermal Power Plant was affected by radioactive contamination from Tokyo Electric Power Company's Fukushima Daiichi Nuclear Power Plant, causing a significant delay in the commencement of restoration work. Our company was contracted to design and construct fuel storage facilities (two 2,980 kL diesel tanks) necessary for securing fuel for the plant's restart. We met the demand for multiple process shortenings and were able to restore the plant in about a year.Sources

Following the March 11, 2011 earthquake, the Noda Nuclear Power Plant suspended units 1 and 3, which were in operation, and unit 2, which was in the final stage of routine inspection and preparing for reactor startup, was also stopped. Immediately afterward, fires and flooding occurred in parts of the plant, and employees and partner companies worked together around the clock to respond to the emergency. The Noda branch (maintenance center) experienced a power outage, but the building survived due to seismic reinforcement, though the two dormitories on the Oki Peninsula became unusable due to the tsunami. To address this situation, the Noda branch established an 'Emergency Disaster Response Headquarters' headed by the branch manager, coordinated with headquarters, and continued recovery operations at the Noda Nuclear Power Plant, providing back‑end support such as supplies, fuel, and accommodation procurement, while also improving the branch's infrastructure and supporting the plant's restoration. The Higashidō branch also experienced a power outage but suffered no physical damage to its buildings; it established an 'Emergency Disaster Response Headquarters' and carried out disaster support for the Noda branch and others.Sources

Due to the Great East Japan Earthquake, five hydroelectric plants were damaged; among them, the Takino and Iwakawa power plants within the Fukushima jurisdiction suffered significant damage as rocks and soil entered their facilities. The Iwakawa plant also had its water pressure pipe damaged.Sources

Established the 'Headquarters Emergency Disaster Response Headquarters' in response to the Great East Japan Earthquake.Sources

From March 13 (Sunday), the day after the next day, we held the Disaster Response Headquarters meetings once each in the morning and afternoon.Sources

The first headquarters meeting was held on March 13, after power had been restored.Sources

The safety confirmation of employees and their families has been completed.Sources

To respond to restoration work, we established a new Supply-Demand Measures Committee, and the Disaster Response Headquarters meetings will be held twice a week.Sources

The computer usage log began operating in April 2011.Sources

We also resumed the executive meetings (regular meetings) that had been suspended after the earthquake.Sources

A system was developed to make preparation more efficient and less labor-intensive, and to enable anyone to prepare the materials easily. It began operation in April 2011.Sources

Due to the Great East Japan Earthquake, the Pacific-side operational facilities were damaged, so more than half of the new employees who joined on April 1, 2011 had their assignments changed.Sources

Commenced management of working hours using a PC usage log ledger.Sources

Implemented special measures for general welfare financial loans due to the Great East Japan Earthquake (100% interest subsidy until March 2013).Sources

As part of the construction for the new Tōhoku Electric Power Co., Ltd. hydroelectric plant, the installation of the distribution board switchgear at Mori Yoshiharu (発) was completed.Sources

We lifted the second emergency system and switched to the first emergency system by holding the Tohoku Electric Power Group's 'Reconstruction Unity Ceremony.'Sources

On May 16, the organization switched to the Level 1 Emergency Response System and became the Emergency Disaster Countermeasures Office.Sources

June 2011: Joetsu Office buildingSources

In June 2011, a "Thermal Construction Office" was established in the thermal department.Sources

Construction of the East Niigata Thermal Power Port Series 3 began on June 1, 2011.Sources

Established the 'Thermal Construction Division' within the Thermal Department.Sources

Held the 53rd regular shareholders' meeting.Sources

Completion of the Joetsu office building.Sources

We also lifted the first emergency system.Sources

More than 30 countermeasures headquarters meetings were held before the headquarters response structure was dissolved at 15:00 on June 21.Sources

Unit 9 commenced commercial operation on June 30, 2011.Sources

In July 2011, the Headquarters-Level Working Hours Improvement Committee was established.Sources

In July 2011, the company established the Head Office–Division Working Hours Improvement Committee to follow up on the operational workplace committees and implement effective measures.Sources

The Onagawa Branch discontinued the Sameura Dormitory, Ayukawa Dormitory, and Urashuku Company Housing, which had become uninhabitable after the Great East Japan Earthquake.Sources

Commercial operation of Niigata Power Plant Unit 5 series began.Sources

Due to heavy rains in Niigata and Fukushima, 29 power plants (8 within the Niigata branch and 21 within the Fukushima branch) suffered severe damage from flooding and were shut down; not only power equipment but also civil engineering facilities and embankments were damaged.Sources

Decision to abolish the Oegawa Branch's 'Shamura Dormitory', 'Ayukawa Dormitory', and 'Urashuku Company Housing' after they became uninhabitable due to the Great East Japan Earthquake.Sources

Unit 8, which was damaged during routine operator inspection, began commercial operation on July 17, 2011.Sources

Unit 10, which was damaged by the tsunami (then an IGCC demonstration unit), completed equipment restoration work on July 28, 2011, and began commercial operation.Sources

Kakkonda and Matsukawa Branch OfficesSources

Yanaizu-Nishiyama Branch OfficeSources

In August 2011, construction offices were established at the Hachinohe, Akita, and East Niigata branches.Sources

Due to increased workload and the need for rapid and accurate decision-making and response, in August 2011 the 'Thermal Power Department' was divided into the 'Thermal Power Planning and Operations Department' responsible for budgeting, financial management, various meetings, and general affairs, and the 'Thermal Power Operations Department' responsible for planning and execution of individual projects, equipment and material management, and training planning and execution.Sources

Maintenance work for geothermal power had been handled by the thermal department for 'Sumikawa' and 'Kami no Dai', and by the hydro department for 'Kakukenda' and 'Matsukawa' and 'Yanagizunoiyama' as project lead sites, but considering equipment characteristics and personnel development, it was unified under the thermal department in August 2011.Sources

In August 2011, the Onagawa Branch reorganized from a section-based structure to a department-based structure of 4 departments and 12 sections to optimize manager span of control and facilitate smooth periodic inspections of the three Onagawa plants.Sources

In the organizational restructuring in August 2011, geothermal-related operations were integrated into the thermal division.Sources

Integrated geothermal-related operations from the Hydropower Division to the Thermal Division (established 'Kakugenta-Matsukawa Branch Office' at Shin-Sendai Branch and 'Yanagizutsuwashiyama Branch Office' at Niigata Branch).Sources

Established 'Higashi-Niigata Construction Office' at Higashi-Niigata Branch, 'Akita Construction Office' at Akita Branch, and 'Hachinohe Construction Office' at Hachinohe Branch to support emergency power installation works due to the Great East Japan Earthquake.Sources

Established 'Thermal Planning & Operations Division' and 'Thermal Operations Division' within the Thermal Department.Sources

Implemented organizational restructuring of Oegawa Branch (reorganized into 4 departments and 14 sections).Sources

The East Niigata Thermal Power Port Series 3 began commercial operation on August 26, 2011, as an emergency power supply of 26,900 kW × 2 units.Sources

October 2011: Construction site associated with the relocation of the Rokkasho Office buildingSources

Unit 2 was decided to be decommissioned due to aging, and demolition work on the boiler and chimney began in November of that year.Sources

Unit 7, which suffered severe tsunami damage, began commercial operation on December 21, 2011.Sources

To address issues with the current system while creating a system better suited to actual conditions and capable of promoting organizational growth and individual development and motivation more effectively than before, the company made partial revisions, including simplifying the sheets—for example, by streamlining the list of issues—and simplifying the definitions related to the level of goal setting. (Fiscal 2012)Sources

Following a trial operation in fiscal 2011, the company fully introduced the mentoring system in fiscal 2012.Sources

In the following year, 2012, we withdrew certification for the thermal and hydroelectric divisions, limiting it to the nuclear division thereafter and maintaining certification to the present.Sources

FY2012 "Ash Deposition Reduction Thermal Spraying" – To reduce ash deposition on water‑cooled wall tubes and superheater surroundings of coal boilers in oxidizing atmospheres, we jointly developed thermal spray materials with Japan Welding Rod Co., Ltd. and have accumulated construction experience.Sources

It began commercial operation on January 31, 2012, as an emergency power plant with an output of 34,000 kW.Sources

March 2012: Mogami Dormitory, Sakata BranchSources

The new Mogami Dormitory at the Sakata Branch was completed, and the old Mogami Dormitory and Kamegasaki Dormitory were discontinued because of their age.Sources

Discontinued the 'Construction & Demolition Work Group' at Niigata Branch (related to removal of Unit 3 and construction of Unit 5).Sources

Completion of the new 'Magami Dormitory' at Sakata Branch.Sources

In April 2012, the company established the Emergency Financial Measures Committee, chaired by the president. To ensure the company’s continued existence, it focused on considering measures to improve financial performance through thorough cost reductions and securing sales, with the cooperation of partner companies, as well as managing and monitoring its financial condition.Sources

Introduced a mentor system for new employees.Sources

Unit 6, which was on long-term planned shutdown, also began commercial operation on April 21, 2012.Sources

Abolished the 'Kamegasa Dormitory' at Sakata Branch.Sources

In May of that year, the company built the Ichii Dormitory at the Higashidori Branch to support the development of a new power source.Sources

June 2012: Ichii Dormitory, Higashidori BranchSources

To reduce environmental impact, Hachinohe Power Plant Unit 5 carried out combined-cycle construction by adding a waste heat recovery boiler, steam turbine, and generator starting in June 2012.Sources

At the Uekawa Power Station, water pressure pipes were also damaged, requiring equipment restoration until June 2012.Sources

Completion of the 'Ichi-i Dormitory' at Higashidō Branch.Sources

Held the 54th regular shareholders' meeting; Chairman Suzuki and President Kato assumed office.Sources

East Niigata Power Plant Unit 5 began commercial operation on June 21, 2012, as an emergency power plant with an output of 339,000 kW.Sources

Akita Power Plant Unit 5 began commercial operation on June 22, 2012, as an emergency power plant with an output of 333,000 kW.Sources

Since the implementation of the FIT system in July 2012 after the disaster, inquiries from general market customers regarding renewable energy projects increased, and we have carried out engineering work for small‑scale power generation facilities, including biomass.Sources

Hachinohe Power Plant Unit 5 began commercial operation on July 2, 2012, as an emergency power plant with an output of 274,000 kW.Sources

On August 1, 2012, it became an independent organizational unit that did not belong to any specific department and reported directly to management.Sources

Previously, safety management was handled by the Personnel and Labor Department, and quality management by the Quality Management Office. Recognizing that the processes leading to labor accidents and nonconformities are the same, we integrated the functions of both offices and established the Safety and Quality Department to manage operations at the headquarters.Sources

Considering the unprecedentedly harsh business environment and the increasing importance of cross‑company initiatives, we divided the Planning and General Affairs Department into three units—'Business Management Office,' 'Planning Department,' and 'General Affairs Department'—to strengthen functions tailored to each activity and improve operational quality.Sources

To comply with the revised Anti‑Bōryokudan Act in October 2012, we added an anti‑social forces response manual to the 'Crisis Management Guidelines' in August 2012.Sources

“Business Administration Office” became an independent organizationSources

To strengthen the quality management system, the Quality Management Office was reorganized as the Safety and Quality Department. (August 2012)Sources

As part of the organizational changes effective August 1, 2012, the Planning and General Affairs Department was split into the Business Management Office, the Planning Department, and the General Affairs Department.Sources

In August 2012, to strengthen the organization by revitalizing staff positions, the titles of “chief manager” and “senior manager” under the heads of organizational units were changed to “assistant department manager” and “specialist section manager.” The duties of these roles were also clarified to include carrying out special assignments across organizational boundaries, distinguishing them from the “senior manager” roles under section managers.Sources

In August 2012, the Safety and Quality Department was established by integrating the functions of safety management and quality management.Sources

To strengthen activities aimed at eliminating workplace accidents and achieving zero nonconformities by integrating headquarters and the field, we transferred safety management duties previously handled by HR to the Quality Management Office, integrating safety and quality management, and established the Safety and Quality Department during the organizational change in August 2012.Sources

With the establishment of the Safety Quality Department in August 2012, we newly integrated safety and health from the former Quality Assurance Committee, forming the Safety, Health, and Quality Assurance Committee.Sources

Our company established a temporary organization, the Hachinohe Power Construction Office, in August 2012, and carried out installation work for the waste heat recovery boiler (HRSG), steam turbine, and other machinery, as well as electrical and instrumentation equipment.Sources

Revised all organizational regulations.Sources

Changed the titles 'Shukan' and 'Shusa' and clarified their duties.Sources

Renamed the Quality Management Office to 'Safety and Quality Department' (integrating safety management and quality control, establishing a new command structure).Sources

Discontinued the 'Thermal Construction Division' in the Thermal Department, the 'Higashi-Niigata Construction Office' at Higashi-Niigata Branch, the 'Akita Construction Office' at Akita Branch, and the 'Hachinohe Construction Office' at Hachinohe Branch.Sources

Established the 'Hachinohe Thermal Construction Office' at Hachinohe Branch (for Unit 5 combined cycle).Sources

Divided the Planning and General Affairs Department into 'Business Management Office', 'Planning Department', and 'General Affairs Department'.Sources

Partially revised the 'Crisis Management Procedures' (added a manual for dealing with anti-social forces as an appendix).Sources

Operations began in October 2012.Sources

Applied the TOiNX Cloud Service (Saikumo) (implemented the cloud service during the R/3 server replacement, building a private cloud tailored to our company's needs).Sources

November 2012: Rokkasho Office buildingSources

Unit 2 resumed power generation on November 3, 2012.Sources

Abolished the old 'Magami Dormitory' at Sakata Branch.Sources

Completion of the Rokkasyo site office building.Sources

Phase 1 of the demolition work for Units 1 and 2 of the Shin-Sendai Power Plant was carried out from November 2011 to December 2012.Sources

In fiscal year 2013, following the Great East Japan Earthquake, the business environment changed significantly. We implemented concrete measures to reduce costs and secure new revenue sources, winning competition and realizing "evolving and continuously developing Tokihata" as the first year, positioning it as the "second founding year." The key and priority measures were "thorough cost reduction," "securing new revenue sources," and "building systems and structures for future growth."Sources

Beginning in fiscal 2013, the company adopted “Transformation and Challenge—Change & Challenge” as its slogan to support its sustainable growth and development, and worked to thoroughly reduce costs and secure new sources of revenue.Sources

New graduate recruitment from fiscal year 2013 to 2015 was limited to 20 or fewer (19 in 2013, 10 in 2014, 15 in 2015).Sources

We established the 'Guidelines for Preventing Electric Shock During Electrical Handling Work' to prevent electric shock.Sources

After undergoing a verification survey by the High-Pressure Gas Safety Association in 2013, we expanded the certification scope from only carbon steel to stainless steel, aiming to broaden the range of orders we can accept.Sources

In the mid-term management plan for fiscal year 2013, we set the goal of 'the second year of founding' and positioned 'expanding general market sales' as the top priority to recover from the decline in power and power-related projects. From fiscal year 2013 onward, we set the general market sales target, previously around 5 billion yen, to 7.5 billion yen, and focused on securing new revenue sources as the top priority to expand orders.Sources

Construction of the second disposal site (24 ha) began in fiscal 2013.Sources

Regarding naming rights, the first contract was renewed in 2013.Sources

From fiscal year 2013 to 2014, to maintain and improve service quality, the Environmental Technology Division established unified subcontracting rules, deepened cooperation with the client, Tōhoku Electric Power Co., Ltd., and further strengthened stable operations.Sources

Disbandment of the New Sendai branch's (Unit 2) 'Removal Work Group'.Sources

Unit 1 resumed power generation on January 28, 2013.Sources

Solicited ideas for new businesses from employees and received 159 submissions.Sources

Due to increased frequency of using communication equipment and handling data in operations, we established the 'Information Security Regulations,' 'Information Security Implementation Guidelines,' and 'Information Incident Response Guidelines' to address threats such as cyber attacks and equipment loss, focusing on information safety and handling.Sources

March 2013: Fukushima Office buildingSources

March 2013: Construction site for the new dormitory of the Onagawa BranchSources

In March 2013, the Information Security Regulations, which set out the basic principles of information security at our company; the Information Security Procedures, which specify the requirements employees must follow; and the Information Incident Response Procedures, which define responses to virus infections, were established.Sources

The 'Radiation Management Equipment Finance Lease' business was transferred to Tōhoku Green Environment Conservation Co., Ltd. and terminated in March 2013.Sources

Establishment of the New Sendai Thermal Construction Site (Series 3 and LNG equipment) at the New Sendai branch.Sources

Enactment of various information security regulations (Information Security Regulation, Information Security Implementation Guidelines, Information Incident Response Guidelines).Sources

Completion of the Fukushima site office building.Sources

It began commercial operation on March 29, 2013.Sources

Based on the “Policy on Reform of the Electricity System,” adopted by the Cabinet in April 2013, full retail liberalization began in April 2016.Sources

The existing website underwent a comprehensive review in April 2013.Sources

TOiNX was commissioned to consider replacing the R/3 system developed in-house, and detailed discussions began in April 2013.Sources

To improve the work environment and increase operational efficiency, from April 2013 the company established a network connecting it to the company via NTT lines and other means, and deployed mobile devices that can access internal systems.Sources

Based on the Emergency Budget Measures Committee's directive to review personnel and labor policies (overall personnel cost suppression measures), we implemented partial revisions to wage-related regulations through labor-management agreement. We revised the calculation formula for private car commuting expenses, reviewed the application period for commuter passes, revised the ship grade, changed accommodation costs, revised the per-unit cost for private car travel during business trips, discontinued women's office attire, changed the clothing loan period, temporarily suspended subsidies for company-wide and independent tournaments and for cultural and sports activities at the workplace, abolished cultural activity subsidies, reviewed the guarantee interest rates for asset formation subsidies and employee deposit schemes, and revised overtime allowance rates and special single allowance rates.Sources

Partial amendment of personnel and labor regulations following a review of personnel and labor policies.Sources

It began commercial operation on April 26, 2013.Sources

Website renewal (focused on supporting general market expansion and strengthening recruitment).Sources

In order to cooperate with cost reduction across the Tōhoku Electric Power Group and to curb our company's equipment investment, we abolished both training rooms at the end of June 2013 and transferred the business to Tōhoku Electric Power Co., Ltd. in July of the same year.Sources

Held the 55th regular shareholders' meeting and amended the articles of incorporation to change the business purpose.Sources

Starting in July 2013, the “Business Management Office Newsletter” was published quarterly and posted on the company intranet.Sources

Beginning in July 2013, the company published the “Business Management Office Newsletter” quarterly and posted it on the company intranet.Sources

Deleted “Training of Operations and Maintenance Personnel” following the end of the work to train power plant operations and maintenance personnel at the Onagawa and Higashidori Nuclear Power Stations.Sources

Established Aqua Power Tohoku Co., Ltd. through joint investment with companies in the electric power group and external companies to operate a small hydropower business using water facilities at the “Sennan-Sensen Wide-Area Water Supply: High-Level Adjusting Reservoir Grounds” of the Miyagi Prefectural Government's Enterprise Bureau.Sources

APT, established in July 2013, operates a small hydroelectric power project (250 kW at Magoshi Stone Hydroelectric Plant) utilizing the elevation difference between the Miyagi Prefecture Enterprise Bureau's Nambu Mountain Water Purification Site (Shiraishi City) and the Moinaka District Adjustment Pond (Sendai City).Sources

In July 2013, Aqua Power Tohoku Co., Ltd. was established through joint investment by the company, Asia Air Survey Co., Ltd., Tosei Kogyo Co., Ltd., Tohoku Natural Energy Development Co., Ltd., and Japan Small Hydropower Co., Ltd. to operate small-scale hydropower generation projects using water facilities owned by the Miyagi Prefectural Government.Sources

In order to cooperate with cost reduction across the Tōhoku Electric Power Group and to curb our company's equipment investment, we abolished both training rooms at the end of June 2013 and transferred the business to Tōhoku Electric Power Co., Ltd. in July of the same year.Sources

In July 2013, five companies established Aqua Power Tohoku Co., Ltd.Sources

Abolished the Nuclear Training Room (Onagawa and Higashidō) and transferred it to Tohoku Electric Power Co., Ltd.Sources

Established the small hydroelectric power company 'Aqua Power Tohoku Inc.'.Sources

Established the "Rifu Technical Training Center" and commenced full operation of the training facility.Sources

Integrated the non‑destructive testing technician training conducted at the "Technology Development Research Center" into the same location. Additionally, the research functions of the Technology Development Research Center were incorporated into the Engineering Department as the "Technology Development Laboratory," strengthening organizational capacity.Sources

To strengthen human resource development, the Rifu Technical Training Center was established. At the same time, to accelerate responses to new technologies and product development, the Technology Development Training Center was abolished and the Technology Development Research Office was made an internal unit of the Engineering Department. (August 2013)Sources

In August of Heisei 25, the sales department was abolished. Additionally, the product department was abolished, and coal ash and related products were transferred to the Thermal Power Division (Environmental Technology Office), while internally and externally developed products were transferred to the Rifu Manufacturing Plant.Sources

It became independent as the Rifu Technical Training Center.Sources

The Technology Development Research Center became an internal organization of the department as the Technology Development Research Laboratory to strengthen organizational capability through functional integration.Sources

Transferred to the Rifu Technical Training Center established in August of Heisei 25.Sources

Due to the Great East Japan Earthquake, from August 2013, operations shifted from a four-team system (electricity, control, turbine, boiler) to a two-team system (electricity team – Shinji branch, mechanical team – Haramachi branch).Sources

The Rifu Technical Training Center (hereinafter referred to as the "Training Center") began operation in August 2013 as a base for technical common education for all technical employees, inheriting the technical common education previously conducted by the Engineering Department, with the purpose of providing more effective education to maintain and pass on on-site technical skills.Sources

By establishing the "Technology Development Laboratory", an internal organization of the Engineering Department, and the "Rifu Technical Training Center", a technical education institution, three operational units were set up in the Rifu area, including the Rifu Manufacturing Factory. To streamline administration, the Rifu Technical Training Center's administrative staff took over the paperwork for all three units. Consequently, the manufacturing and operations staff of the Rifu Manufacturing Factory and the welding staff were merged into a single "Manufacturing and Welding" role.Sources

Closed the Technology Development Research Center (to strengthen engineering and technology development for competitiveness).Sources

Opened the Rifu Technical Training Center (operating as a fully independent organization).Sources

Established a new 'Thermal Division' at the Joetsu site.Sources

Integrated the directly managed construction teams into the 'Electrical Team' (Shinchi branch) and 'Mechanical Team' (Harimachi branch).Sources

Transferred the Sales Division of the Sales Department to the Environmental Technology Office.Sources

Landfilling of coal ash at the disposal site was completed at the end of November 2013.Sources

The solar power installation work for 'Tagajō Solar Power', completed on December 15, 2013, was ordered by the Shin-Sendai branch from JFE Engineering Co., Ltd., and our company was the first to design and act as the prime contractor for a mega-solar installation. This project marked our full entry into mega-solar projects.Sources

Starting in fiscal year 2014, the committee operating standards were revised to allow a subcommittee composed of labor and management representatives to be established under this committee.Sources

Sales resumed in FY2014.Sources

Approximately 140,000 tons were sold between the start of sales in FY2014 and FY2017.Sources

From fiscal years 2014 to 2016, these three measures were continued as key and priority initiatives.Sources

Although the company recorded losses for two consecutive years in fiscal 2012 and 2013, it returned to profitability from fiscal 2014 onward.Sources

Leasing and leaseback arrangements were trialed for vehicle replacements for FY2014–FY2016.Sources

Since FY2014, the company has conducted self-checks focused primarily on the contents of its company regulations concerning information security.Sources

During negotiations on the FY2014 revision of the labor agreement, the company proposed to the labor union that it, too, change the relevant day to a working day. The parties agreed on an alternative measure: establishing a “winter holiday,” consisting of one designated day off between December and February.Sources

Starting in fiscal 2014, the committee’s operating standards were revised to allow for the establishment of subcommittees made up of labor and management representatives, so that effective measures could be implemented.Sources

With the termination of the business in fiscal year 2014, the Nuclear Technology Training Division was abolished.Sources

Type B fly ash cement has been used in the seawall construction at Onagawa Nuclear Power Station since fiscal 2014.Sources

Following discussions with the Noshiro Thermal Power Plant, the Noshiro Branch decided to restrict sales for uses and locations related to drinking water and food consumed by people, based on the company's fiscal 2014 study, “Environmental Safety Survey of Coal Ash Products as Civil Engineering Materials in Relation to Outdoor Exposure Effects (New Study).” Sales resumed in fiscal 2014.Sources

Since April 2014, the company has leased a 4,000-tonne cement silo near Noshiro Port and has maintained a reserve of approximately 3,000 tonnes.Sources

From June 2014, the Haramachi Thermal Power Plant commissioned Japan Development Engineering Co., Ltd. to recycle coal ash into crushed aggregate using the Ganjo-do method (the crushing work was subcontracted to the company, which further subcontracted it to Sekiba Construction Co., Ltd.). The company then undertook sales of the product. It registered the trademark “Kisa®” for this coal ash mixture. For distribution, the company purchased the product from Tohoku Electric Power Co., Inc. and sold it to users through Kato Construction Materials Industry Co., Ltd. It was used mainly as embankment material for the development of an industrial park in Minamisoma City. From the start of sales in fiscal 2014 through fiscal 2017, approximately 140,000 tonnes were sold.Sources

From April 2014, the company leased a 4,000-ton cement silo near Noshiro Port and has been storing approximately 3,000 tons of fly ash.Sources

The maintenance contractor was changed to HISS in April 2014.Sources

Contract changes were made in stages starting in April 2014.Sources

At Sakata Joint Power Plant of Sakata Joint Power Generation Co., Ltd., sales of Type II fly ash were suspended from June 2016 due to difficulty securing JIS fly ash.Sources

At Sakata Joint Power Station of Sakata Kyodo Power Co., Ltd., sales of Type II products were suspended from June 2014 because it had become difficult to secure JIS fly ash.Sources

Since June 2014, the contract has covered 30 transport vehicles, including one vehicle for Kato Kenzai Kogyo Co., Ltd. and two spare vehicles.Sources

In August 2014, the Civil Engineering and Construction Division was established and integrated at the Higashi-Shinogata Branch.Sources

In August 2014, we contracted the monitoring services for the Magoshiishi Hydroelectric Power Plant and are carrying out the same services at the Hara Town Branch.Sources

The Magoeishi Hydroelectric Power Plant began commercial operation, using water supplied from Shichikashuku Dam to the Sennan-Sensen area.Sources

In August of Heisei 26, the Sales Engineering Group was established.Sources

Regarding the allocation of personnel and execution of operations for each operational unit (Higashi-Niigata branch, Niigata branch, Nankai LNG facility, and Sado facility), to improve efficiency and flexible operation through combined strength, a civil engineering and construction department was established and integrated at the Higashi-Niigata branch in August 2014.Sources

In August 2014, the company was commissioned to monitor the Umakoshiishi Hydroelectric Power Plant. The Haramachi Branch carries out this work by notifying the commissioning party when an abnormality occurs.Sources

A Magoishi Hydroelectric Power Plant (output 250 kW, one horizontal-axis Francis turbine, one three-phase induction generator) was constructed within the waterworks facility and began operation in August 2014.Sources

To enhance competitiveness through rationalization and efficiency, expand orders, and improve profitability, we reorganized to enable the Rifu Manufacturing Factory to handle projects and customer responses independently. This involved laying the groundwork for certification as a "Minister of the High-Pressure Gas Safety Law Certified Examiner" and strengthening the private product certification system. Accordingly, the Rifu Manufacturing Factory became the primary site responsible for obtaining and maintaining new certifications under the High-Pressure Gas Safety Law and for maintaining private product certifications.Sources

In September 2014, an issue occurred with the post-earthquake equipment integrity inspection records.Sources

At the 355th meeting of the Board of Directors held on October 28, 2014, the “Basic Policy for Systems to Ensure the Proper Conduct of Business” was partially amended, and it was resolved that business audits would also be conducted at subsidiaries as necessary.Sources

At the 355th Board of Directors meeting held on October 28, 2014, a partial revision was approved to the “Basic Policy on Systems to Ensure the Proper Conduct of Business,” allowing business audits of subsidiaries to be conducted as necessary. Accordingly, the Internal Audit Regulations were partially revised to state that subsidiaries were also subject to business audits. Since fiscal 2014, the company has conducted annual business audits of Aqua Power Tohoku Co., Ltd.Sources

Set a retirement age in the "Career Partner System" to respond to amendments to the Labor Contract Act concerning former temporary employees who have been active as a workforce.Sources

Accordingly, in November 2014, the company introduced a new “Career Partner System” separate from the temporary employee system.Sources

December 2014: Onagawa Branch Washigami Dormitory. Eltas Tohoku Co., Ltd. built the dormitory on land our company acquired in Onagawa Town, and our company leased it from Eltas.Sources

December 2014: Sendai Thermal Power Station office buildingSources

Operations began at Washigami Dormitory under a new arrangement in which Erutas Tohoku Co., Ltd. constructed the dormitory to the company's specifications and leased it to the company.Sources

The Pure General Construction Order Promotion System Review Working Group was conducted in FY2015.Sources

To raise the company’s profile, it began sponsoring Vegalta Sendai in the 2015 season.Sources

As part of Corporate Ethics Month activities, the company invited a speaker from the Information and Communications Department of Tohoku Electric Power Co., Inc. to give a lecture on the threat of cyberattacks and the importance of information security. The lectures were held in 2015 and 2016 in conjunction with the year-end joint meeting of executives.Sources

Based on the guidelines in the “Manual for Implementing the Stress Check System under the Industrial Safety and Health Act,” issued by the Ministry of Health, Labour and Welfare in May 2015, the company established the “Stress Check System Implementation Guidelines” as internal regulations concerning stress checks. These specify the purpose, implementation framework, roles of those responsible for implementation, implementation methods, record retention, privacy protection, and other matters.Sources

The “Working Group to Review the Framework for Promoting Orders for Pure General Construction Projects,” conducted in fiscal 2015, identified as an issue the need to “reinforce staffing, for example by hiring administrative staff to assist with paperwork, in order to reduce the burden on busy work supervisors.”Sources

In fiscal 2015, the company implemented the "Workplace Communication (Bonds) Activities," providing financial support for communication activities at the business-unit and workplace levels.Sources

We formulated measures to prevent recurrence of fatal falls and ensured that cleanup work is never neglected, maintaining vigilance during any task, and implemented these emergency CEO directives company-wide.Sources

In 2015, the certification audit standard JIS 9001:2008 (ISO 9001:2008) was revised to JIS 9001:2015 (ISO 9001:2015).Sources

Construction started in FY2015; due to delays in civil works, our schedule was tight, but we were able to complete the project in FY2019.Sources

FY2015 "Three‑Dimensional Defect Inspection for Hydroelectric Turbine Component Life Assessment Service" – The remaining life of major turbine components is over 50 years. The 3D defect detection technology developed by our company can be evaluated more accurately than by manufacturers, making it an important factor for power plant decommissioning and replacement planning, and it is useful for utility equipment operation.Sources

Although implementation was postponed since fiscal year 2013 from a reduction standpoint, it was resumed in fiscal year 2015 to strengthen proper disposal.Sources

In fiscal 2015, we received and installed equipment installation work at the Hagi-no District Power Station (end user: Terazaki Land Improvement District) and small hydroelectric power equipment construction at Mizukubo Dam (end user: Tohoku Agricultural and Rural Affairs Bureau) from the manufacturer.Sources

Harimachi solar power plant commenced commercial operation.Sources

Started trial operation of wood biomass fuel at Harimachi thermal power plant.Sources

Reviewed processes for compliance with new regulatory standards at Onagawa and Higashidō nuclear power plants.Sources

Sponsorship of Vegalta Sendai (since the 2015 season, including company name display at stand entrances and on the sidelines).Sources

Established quantitative and qualitative criteria for board agenda items in the Board of Directors regulations.Sources

Abolished Labor Festival (holiday on May 1) and established winter holidaysSources

Implemented 'Workplace Communication (Bond) Activities' (until March 31, 2016)Sources

Established a 'Demolition Work Group' for units 1 and 2 at the new Sendai branchSources

Introduced a simple web conferencing system (aiming to improve incident response, strengthen inter-agency information sharing, and reduce travel expenses)Sources

Held the 57th regular shareholders' meeting; amended the articles to abolish the Board of Auditors, abolished the 'Board of Auditors Regulations', partially revised the 'Auditor Audit Regulations', and established the 'Auditor Advisory Council Regulations'Sources

Our subsidiary 'Tohoku Natural Energy Development Co., Ltd.' was absorbed in a merger (restructuring of Tohoku Electric Power Group companies related to natural energy)Sources

Integrated the new Sendai branch with the Sendai thermal power plantSources

Partially revised the 'Crisis Management Response Guidelines' (aiming to accelerate information transmission)Sources

Established the 'Crisis Management Committee Regulations' and held the first Crisis Management Committee meeting (October 26)Sources

Established the 'Specific Personal Information Handling Standards' (to address handling of specific personal information in line with the introduction of the My Number system)Sources

The third series of the new Sendai thermal power plant commenced full-scale commercial operationSources

In March 2015, we implemented an organizational change to a 3-department, 12-section structure.Sources

At the Takino Power Station, equipment renewal required until March 2015.Sources

It was decommissioned on March 21, 2015.Sources

In response to increased management risks such as the advancement of competitive markets accompanying the power system reform, we added "quantitative criteria" and "qualitative criteria" to the "Board of Directors Regulations" to improve corporate governance, including accurate decision‑making on critical risk matters at the board.Sources

Abolished the Labor Festival held annually on May 1 and established winter holidays.Sources

In view of the increased management risks associated with the development of competitive markets and other changes accompanying electricity system reform, the company established quantitative and qualitative criteria for matters to be submitted to the Board of Directors. The aim was to improve management governance, including the Board’s ability to make appropriate decisions on important risk-related matters. (April 2015)Sources

Following changes to the requirements for outside corporate auditors under the revision of the Companies Act, the Board of Corporate Auditors was abolished and references to it were deleted.Sources

Among power stations damaged by the Niigata–Fukushima heavy rain, the longest restoration work—at 28 sites, including the Honma and Ueda Power Stations within the Aizu pipe network—required until June 1, 2015.Sources

Tohoku Natural Energy Development Co., Ltd. was absorbed into Tosei Kogyo Co., Ltd., which continued as the surviving company. Tosei Kogyo Co., Ltd. changed its name to Tohoku Natural Energy Co., Ltd.Sources

Subsequently, starting in July 2015, fuel conversion work was carried out to switch from light oil to LNG.Sources

Commercial operation of Hachinohe Power Plant Unit 5 began.Sources

Tohoku Natural Energy Development Co., Ltd. merged on July 1, 2015, with Tosei Kogyo Co., Ltd. as the surviving company, and became Tohoku Natural Energy Co., Ltd.Sources

Decommissioning of New Sendai Thermal Power Plant Unit 1Sources

Sendai Thermal Power Station Office abolished (integrated into the New Sendai Branch)Sources

In August 2015, the Sendai Thermal Power Business Office was integrated into the New Sendai Branch to establish an integrated maintenance system for the Sendai Thermal Power Plant and the New Sendai Thermal Power Plant.Sources

In September 2015, the demolition work for Shin-Sendai Power Plant Units 1 and 2 was started, and all equipment was removed.Sources

Unit 1 at Shin-Sendai Thermal Power Station was retired in September 2015.Sources

Established the "Crisis Management Committee Regulations." Previously, crisis management regarding information security and major disaster measures was handled by the Corporate Ethics Committee, but it was decided to have the Crisis Management Committee review these matters.Sources

Revised parts of the "Crisis Management Procedures," redefining the definition of emergencies, reviewing the communication system during emergencies, and newly defining the contents of Emergency Levels I and II.Sources

In October 2015, the Crisis Management Committee Regulations were established, and the committee held its first meeting that same month.Sources

In conjunction with the launch of the Crisis Management Committee, the procedures were partially revised in October 2015. The revision updated the contact routes to speed up information sharing and newly defined the details of Emergency Levels I and II.Sources

The installation work for the Marusan Paper Co., Ltd. Biomass Incineration Facility, completed on November 30, 2015, was ordered from Takuma Co., Ltd. by the Haramachi Branch, which carried out the comprehensive installation of the biomass incineration facility. Although the company had little experience with large-scale construction projects in the general market, this project marked the beginning of its work in this area and laid the foundation for biomass facility construction.Sources

New Sendai Unit 3-1 (490,000)Sources

December 2015 (Series 3-1) Commencement of commercial operationSources

Since FY2016, the company has sent simulated emails to all employees that would infect their computers with a virus if opened, tracked the open rate, and raised awareness about malicious emails.Sources

Since FY2016, the company has conducted drills based on the scenario of a computer at a business unit being infected with a virus. The drills cover initial response, contacting relevant parties, and removing the virus.Sources

After assessing the status of women's participation, the company identified issues and formulated a five-year action plan covering fiscal 2016 through fiscal 2021.Sources

In fiscal year 2016, we reviewed the document system, designating the Safety and Health Management Regulations as the top-level document and collectively referring to all 30 documents as the OSHMS.Sources

For new employees starting in fiscal 2016, the items to be learned through in-house construction teams were clarified, and the training period was shortened from two and a half years to one year.Sources

Following a review of the operational structure at the Tokashima Thermal Power Station, we have changed to a directly managed operational structure and have been operating it since fiscal 2016.Sources

Since fiscal year 2016, we have been contracted to perform inspection and maintenance of the wind power plant installed in Tamura City, Fukushima Prefecture in November 2010.Sources

Starting in fiscal year 2016, the Training Center launched a skill development program for partner companies, aimed at training on-site technicians and supporting skill improvement.Sources

Organizational restructuring of the Onagawa branch (reorganized from 4 departments and 14 sections to 3 departments and 12 sections)Sources

Formulated the 'Women Empowerment Action Plan'Sources

Introduced a special position annual salary systemSources

Revised the 'Culture and Sports Activity Handling Standards' to 'Culture, Sports, and Communication Activity Handling Standards'Sources

Changed the 'Rokkasyo Office' to be directly under the headquartersSources

Established a 'Demolition Work Group' at the Sakaida branch (Sakaida Recycling Center)Sources

Renewed the Compliance Magazine (published approximately twice a month)Sources

Completion of the new Sendai branch cooperative company buildingSources

Held the 58th regular shareholders' meetingSources

Commencement of handling former surnamesSources

Establishment of 'Noshiro Thermal Power Plant Unit 3 Construction Site' at Noshiro BranchSources

Establishment of 'Gas Turbine Specialist Construction Team' at Higashi Niigata BranchSources

Partial revision of the 'Emergency Disaster Measures Implementation Guidelines' (review of action standards during a major earthquake and reflection in company regulations)Sources

Establishment of 'Joetsu District Thermal Power Branch Office' as a subordinate organization of Niigata BranchSources

Introduction of defined contribution pension systemSources

Created the "Women Empowerment Action Plan." After assessing the status of women's participation, identified issues, and formulated a five‑year action plan starting from fiscal year 2016.Sources

In March of Heisei 28, to expand general market orders and slim the organizational structure, the sales development department of the Sales Division was abolished, and the organization was changed to make non-power sales into plant sales.Sources

The decontamination of the overhead transformers at the Sakaida Recycling Center was completed in March 2016.Sources

In April 2016, the sale of Type IV products was suspended.Sources

Full retail liberalization began in April 2016.Sources

To strengthen support for major customers, the Rokkasho Office was placed under the direct control of the head office. (April 2016)Sources

Against this background, in April 2016, the company introduced an annual salary system for employees in special positions and revised position allowances.Sources

In April 2016, the company added the "Workplace Communication (Bonds) Activities" conducted in the previous fiscal year and revised their handling. It also amended the "Standards for Handling Cultural and Sports Activities" to the "Standards for Handling Cultural, Sports, and Communication Activities."Sources

Removal work at the Sakaida Recycling Center (April 2016 – June 2018). The decontamination removal of equipment, including PCB-contaminated parts and devices, was initiated. As this was the first PCB decontamination equipment removal project in Japan, our company acted as the prime contractor and coordinated with equipment manufacturers to carry it out.Sources

At Sakata Kyodo Power Co., Ltd.'s Sakata Joint Thermal Power Station, sales of Type IV products were suspended in April 2016.Sources

In April 2016, to enhance the independence of the Rokkasyo office and strengthen customer support alongside the headquarters, including Japan Nuclear Fuel Co., Ltd., we reorganized the Tōdō Branch's lower-level operations to be managed directly by the headquarters.Sources

June 2016: New Sendai Branch contractor buildingSources

Decommissioning of Hachinohe Thermal Power Plant Unit 3Sources

July 2016 (Series 3-2) Commencement of commercial operationSources

Unit 3 of the Hachinohe Thermal Power Plant, having operated for nearly 50 years, has experienced aging equipment, and following the stable operation of Unit 5, which began as an LNG combined-cycle plant in July 2015, it was decommissioned in July 2016 and removal work was undertaken.Sources

Unit 3 at Hachinohe Thermal Power Station was retired in July 2016.Sources

Allowed employees to use their former surnames only on business cards, name tags, employee rosters, and names listed in official documents, upon their request.Sources

Starting in August 2016, employees were permitted to use their former surnames, upon request, only for items such as business cards, name badges, employee directories, and names shown on work-related documents.Sources

In August 2016, an ad hoc organization called the 'Noshiro Thermal Power Plant Unit 3 Construction Site' was established with a 43-person team, and construction is underway aiming for commercial operation in June 2020.Sources

To address the shortage of engineers resulting from the increase in gas turbine combined-cycle facilities, a specialized team capable of carrying out scheduled inspection work in-house was established at the Higashi-Niigata Branch in August 2016.Sources

In October 2016, the Standards for Handling Specific Personal Information were established to govern the handling of personal information, including My Number data. Security measures were also implemented at locations handling specific personal information, including the introduction of dedicated terminals and installation of partitions.Sources

To stabilize income in retirement, employees need to become more aware of their post-retirement lives and make their own efforts to secure retirement funds. As a support measure, the company newly introduced a "corporate defined contribution pension plan" in October 2016.Sources

Revised part of the conduct guidelines, clarifying the automatic attendance conditions in the event of a major earthquake.Sources

The Emergency Disaster Response Procedures were partially revised in November 2016.Sources

In December 2016, the president issued a message on reducing long working hours and subsequently set a management goal for reducing long working hours.Sources

Joetsu District Thermal Power Field OfficeSources

Established the Joetsu Thermal Power Field Office (December 2016).Sources

In December 2016, the president issued a message on reducing long working hours. Thereafter, while setting management targets for reducing long working hours, the company implemented measures including strengthening company-wide mutual support; requesting that clients review construction periods and schedules; stepping up recruitment, including mid-career hiring; introducing the Assist Partner System; strengthening guidance on reducing overtime through use of work rules (variable working hours, changes to days off, compensatory leave, etc.); guiding employees to routinely submit advance notifications of overtime and holiday work; and strengthening working-hours management.Sources

In December of Heisei 28, aiming to expand orders in the Joetsu Itayukawa area, the Niigata Branch Joetsu District Thermal Power Branch Office was established.Sources

As sales channels for general-market construction work related to thermal power expanded in the Joetsu and Itoigawa areas, the Joetsu District Thermal Power Field Office was established under the direct control of the Niigata Branch in December 2016, separated from the Joetsu Office (Hydropower Division) to strengthen construction response capabilities.Sources

In fiscal year 2017, we focused the management challenges on "promoting the maintenance and improvement of technical and construction capabilities for future growth, securing new revenue sources, and strengthening market competitiveness," making "securing new revenue sources" and "strengthening market competitiveness" key and priority measures.Sources

Established the "Assist Partner System" to allow employment of up to three years for assistants who input data into the construction management system and prepare daily reports, aiming to reduce the burden on site supervisors.Sources

Beginning in fiscal 2017, the company began posting detailed business audit results on its intranet.Sources

The company also decided to lease vehicles for replacements from FY2017 onward from East Japan Kogyo Co., Ltd., a member of the Tohoku Electric Power corporate group.Sources

Because many hazards and countermeasures identified by TBM-KY were not applied in actual work, leading to incidents, we held a review meeting with the construction management department and introduced the 'Safety Memo Notebook' aimed at implementing one-person KY and sharing near-miss information, thereby improving the TBM-KY method.Sources

FY2017 "Ash Deposition and Corrosion Monitoring Service" – By analyzing raw coal and monitoring combustion conditions inside the boiler during operation, we evaluate ash adhesion and corrosion characteristics and support the construction of optimal operating conditions.Sources

Moderate-heat fly ash cement has been used at Yanagawa Dam (Iwate Prefecture) since fiscal 2017.Sources

Fiscal 2017: 145 personnel (organizational change in the Environmental Technology Section of the Shin-Sendai Branch).Sources

The third certification renewal was completed in fiscal 2017.Sources

Production at Haramachi Thermal Power Station ended during fiscal 2017, and the company's sales also ended.Sources

In line with the 10th tree‑planting event in 2017, the company held a public contest for a 'Tōhatsu no Mori' character; among many submissions, 'Mourin‑kun', conceived by Kōya Imono from the Sakatani branch, was selected.Sources

Announcement of Tohoku Electric Power Group's medium-term management policy (FY2017-2020)Sources

Announcement of Tohoku Electric Power Group's CSR policySources

Review of processes toward compliance with new regulatory standards at Onagawa and Higashidori Nuclear Power PlantsSources

Full acquisition of Tohoku Energy Service Co., Ltd. as a subsidiarySources

Announcement of implementation of organizational restructuring centered on the company systemSources

Introduction of Assist Partner systemSources

Establishment of 'Unit 3 Removal Work Group' at Hachinohe BranchSources

Transfer of all shares of Tohoku Energy Service (ESCO) to Tohoku Electric Power (transfer of shares held by us to Tohoku Electric Power)Sources

Extension of Career Partner retirement age (raised from 70 to 75 years)Sources

Introduction of clothing exchange loan systemSources

Held the 59th regular shareholders' meeting; Chairman Kato and President Sasagawa appointedSources

Converted Motoyama office to branch office systemSources

Commencement of operation of temporary dormitory 'Yoshiyoshi Dormitory' at Noshiro BranchSources

Review of personnel system for general positions (expansion of chief leader positions, establishment of dedicated leaders, subdivision of four grades, etc.)Sources

Establishment of the Nuclear Quality Assurance OfficeSources

Abolition of the Environmental Technology Section at the New Sendai Branch and transfer of operations to the Construction Section 2Sources

Introduction of an hourly leave systemSources

Company-wide baseball tournament held (until April 4), first after the disasterSources

Capsule Egg Dome Housing discontinued sales in March of Heisei 29.Sources

Removal work for Unit 3 of the Hachinohe Thermal Power Plant (March 2017 – February 2020 (planned)). Although this was a competitive procurement project, our company secured the contract as the prime contractor and has been carrying out removal work, including foundation removal of machinery and chimneys, over approximately 35 months.Sources

In March 2017, a new company was established (Fukushima Eco-Crete Co., Ltd., with investments from Japan National Development Co., Ltd., the Coal Energy Center (a public corporation), and Shinwa Trading Co., Ltd.).Sources

To reduce labor in inspection operations, we conduct monthly inspections and routine checks for hydroelectric power stations with output below 3,000 kW, and bi-monthly inspections for other power stations.Sources

From April 2017, the Assist Partner System was introduced to reduce the burden on work supervisors.Sources

From April 2017, special position holders, excluding department heads and branch presidents, were strictly managed as subjects of working time management.Sources

From April 2017, the fixed overtime allowance system was introduced.Sources

Extended the retirement age for Career Partners from 70 to 75 years.Sources

Revised the “Basic Policy on Systems to Ensure the Proper Conduct of Business” in connection with the application of the Tohoku Electric Power Group CSR Policy and Code of Conduct to the entire group.Sources

As Tohoku Electric Power Co., Inc. reviewed its energy services business in response to the full liberalization of electricity retailing, Tohoku Energy Service Co., Ltd., whose shareholders included companies in the corporate group, became a wholly owned subsidiary of Tohoku Electric Power Co., Inc. Our company transferred all of its shares to Tohoku Electric Power Co., Inc.Sources

In April 2017, the company introduced the “Assist Partner System,” separate from the temporary employee system, which allows employment for up to three years, thereby reducing the burden on work supervisors.Sources

Starting in April 2017, employees in special positions, excluding department heads and branch managers, became subject to working-hours management, with their hours strictly monitored. Because this meant overtime allowances had to be paid, the company introduced a fixed overtime allowance system under which position allowances were treated as overtime allowances.Sources

At first, the retirement age was set as the end of the fiscal year in which an employee turned 70. However, as needs grew to pass on technical skills and expertise and to address staffing shortages, the age was changed in April 2017 to the end of the fiscal year in which an employee turns 75, and remains so today.Sources

To reduce costs by preventing more items than necessary from being loaned, the company changed to an "exchange-based loan system" in April 2017, under which items are replaced when they can no longer be used.Sources

In April 2017, the work related to inventions and designs was transferred from the General Affairs Department. While developing intellectual property specialists, we manage the rights and maintenance of technologies developed through R&D and business improvement, plan IP strategies in collaboration with construction and sales departments, and engage in business development such as exhibiting at trade shows and visiting companies.Sources

In July 2017, the Murai Office was reorganized into a branch.Sources

In July 2017, the Nakoso Office was reorganized as a branch office, and the company strengthened its construction execution structure and other capabilities to acquire new customers in the Northern Kanto and Kanto regions.Sources

Changed the Nakoso Office to a branch structure to expand sales of construction projects in the general market (July 2017).Sources

To address a shortage of accommodation caused by construction of Unit 3 at Noshiro Thermal Power Station, operations began in July 2017 at Yoneshiro Dormitory, a temporary dormitory at the Noshiro Branch, using the same arrangement.Sources

In July of Heisei 29, the Motoyama Office was reorganized into a branch office, strengthening expansion into the North Kanto region.Sources

As sales channels for general-market construction work expanded in the Nakoso area and the northern Kanto region, organizational strengthening became necessary. Accordingly, in July 2017, the Nakoso Office was reorganized as a branch.Sources

In August 2017, the personnel system for general positions was reviewed.Sources

To support the restart of nuclear power plants, we established a head office business unit to enhance and strengthen the nuclear quality assurance system, ensuring prevention of record‑keeping deficiencies, application of new regulatory standards, and reliable free access by operating inspectors.Sources

Reviewed personnel systems to reduce the burden on special position holders and improve the management capabilities of general position holders before promotion, by expanding the scope of Chief Leader assignments and appointing dedicated leaders.Sources

Established the Nuclear Quality Assurance Office (August 2017).Sources

Abolished the Environmental Technology Section at the Shin-Sendai Branch to improve operational efficiency in connection with the replacement of power generation facilities (August 2017).Sources

To address these issues, the company revised its personnel system for general positions in August 2017. Specifically, as part of a review of general management positions, chief leaders were made eligible for assignment outside the construction division as well, to improve their management skills before promotion to a special position. The company also assigned dedicated leaders (general management positions in the specialist and dedicated job groups) to improve management capabilities by supporting some of the management duties of section managers (assistant section managers and chief leaders), reduce the workload of line managers, and strengthen human resource development activities. In addition, the company eased the sense of stagnation by dividing Grade 4 into two levels and revising grade allowances, while exempting employees from training (correspondence and classroom-based) and relaxing some promotion and advancement requirements.Sources

To strengthen quality assurance activities in the nuclear division, the Nuclear Quality Assurance Office was established in August 2017.Sources

Established a 'time-based leave system' based on employees' needs.Sources

Our company also held in-depth discussions in the Subcommittee of the Working Hours Improvement Committee. Considering benefits such as “expanding work-style options to accommodate family and other circumstances” and “reducing employees’ reluctance or hesitation about their coworkers,” the company introduced the system in October 2017.Sources

From October 2017, we implemented the revised QMS aligned with the 2015 version.Sources

In October 2017, to separate the agenda of safety and health from quality, we split the Safety and Health Management Committee and the Quality Assurance Committee, and this arrangement remains to date.Sources

In November 2017, the company held its first company-wide baseball tournament since the earthquake, and its first in seven years. Exchanges between workplaces helped promote mutual understanding and a sense of solidarity.Sources

The Standards for Handling Personal Information were partially revised in December 2017 in connection with the enforcement of the amended Act on the Protection of Personal Information.Sources

In FY2018, the health management system used by power-related companies was introduced, significantly improving efficiency by importing electronic health check data owned by each health check institution into the system.Sources

From FY2018, bonuses (10,000 yen and 5,000 yen Qoo cards) were awarded to those who maintained or improved their health.Sources

In fiscal year 2018, we positioned the year as one to reliably "implement" the key and priority measures while continuing them.Sources

In fiscal 2018, in addition to continuing the themes from fiscal 2017, the company conducted reviews and provided guidance on the establishment and operation of internal controls for outsourced work; questions and concerns in carrying out duties, including any sense of inconsistency, confusion, or undue pressure, in light of misconduct cases in Japan; the status of on-the-job training on basic business procedures; and the importance of promptly sharing information.Sources

To reduce the burden on employees and improve the effectiveness of the PDCA cycle, made operational improvements, including “Streamlining Meetings” (FY2018).Sources

January 2018: Land was acquired in Tagajo City for construction of the Omashiro Dormitory for the New Sendai Branch. It was to be built using the same arrangement as the Washigami Dormitory, with occupancy scheduled to begin in February 2020.Sources

Starting in fiscal 2018, emergency disaster response drills were conducted based on the Emergency Disaster Response Procedures. These drills enabled senior management and each operational unit at the head office to confirm their respective roles, as well as the overall sequence of actions from the occurrence of an emergency disaster through establishment of the headquarters structure and its eventual stand-down.Sources

In fiscal 2018, the company introduced a “Health Management System” used by power-related companies. By importing electronic health examination data held by each examination provider into the system, the company achieved significant efficiency improvements.Sources

As a new measure to raise employees’ awareness of improvement, starting in fiscal 2018 the company began awarding gift cards worth ¥10,000 or ¥5,000 to employees whose health was maintained or improved.Sources

From the 2018 renewal, we introduced a web application system for the managing insurance company that allows members to input directly on a computer.Sources

Established outsourcing regulations. To establish a unified company-wide rule for outsourcing contracts, we separated the "implementation approval" and "contract approval" for outsourcing contracts, separated the "implementation officer" and "contract officer" for outsourcing, and newly established the "Outsourcing Regulations" as a unified rule for outsourcing contracts.Sources

We trialed a stay-type patrol management observation (remaining on site for a set period to observe, evaluate, and guide work posture). We also conducted a 'Frontline Site Manager (Employee/Contractor) Safety Training Seminar' for our site manager class, contractor executives, and deputy site managers.Sources

As of FY2018, the project is under construction, but it is addressing ash treatment equipment electrical and instrumentation construction design (Kawasaki Heavy Industries Ltd.) and emergency power generator installation design (Niigata Engine Co., Ltd.).Sources

Fiscal 2018: 142 personnel.Sources

By November 2018, 11 tree‑planting events (approximately 875 trees) had been carried out.Sources

In 2018, the second contract was renewed. With the second renewal, the maintenance area was expanded to 1.8 hectares, and plans were made to install monuments, signs, benches, etc., in preparation for the 60th anniversary project on April 20, 2019.Sources

As part of the construction for the new Tohoku Electric Power Co., Ltd. hydroelectric power station, the outdoor substation installation at Tsugaru Power Station was completed.Sources

Shinobu Power Station generator replacement.Sources

In fiscal year 2018, the Training Center resumed the company-wide skills competition.Sources

In fiscal year 2018, as a project subject to Article 52 of the Electric Business Act, we boldly tackled the largest-ever MOE Hachinohe Biomass Power Plant construction, including welding contractor inspection of all turbine-side piping, pipe prefab fabrication, on-site welding, and updates to heat exchanger tubes at the newly acquired Sendai City Matsumori incineration plant, earning high praise from customers for our welding technology and construction management.Sources

In fiscal year 2018, we worked to reduce costs of pipe prefab fabrication by installing an "automatic cutting facing machine with opening angle" at the factory.Sources

60th Anniversary Founding Ceremony (Headquarters 7th floor venue)Sources

7th Company-wide Skills Competition (60th Anniversary Celebration)Sources

60th Anniversary 'Clothing Function and Safety Improvement Project' operational launch from helmets, etc.Sources

60th Anniversary 'Internal Newsletter Digitization Project' published on the internal portal siteSources

60th Anniversary 'Company History Digitization Project' displayed on the website covering years 10 to 50Sources

60th Anniversary 'Tōhatsu Forest Development Project' commemorative ceremonySources

Kick-off meeting in January 2018Sources

Publication ended with issue No. 20 in March 2018.Sources

In March 2007, the Group Business Promotion Department of Tohoku Electric Power Co., Ltd. instructed that the usage time of work computers be used as objective data for tracking working hours and to enforce working time management.Sources

In March 2018, the Tokyo Sales Office was reorganized into the Tokyo Branch, which is the construction execution agency.Sources

Partially revised the "Personal Information Handling Standards" to address the amended Personal Information Protection Act and clarify the definition of personal information. Additionally, partially revised the "Information Security Implementation Guidelines" by adding measures to prevent recurrence of information incidents.Sources

The “Business Management Office Newsletter” ended with the publication of its 20th issue in March 2018.Sources

Changed the Tokyo Sales Office to a branch structure to expand sales of construction projects in the general market (March 2018).Sources

A partial revision reflecting advances in information and communications technology and matters related to information security was made in March 2018.Sources

In connection with the application of the Tohoku Electric Power Group Social Media Policy from April 2018, the company partially revised its Information Security Implementation Guidelines in March of that year to include compliance with the policy.Sources

In March of Heisei 30, the Tokyo Sales Office was reorganized into the Tokyo Branch, advancing expansion into the Kanto region and increasing orders outside the Tohoku area.Sources

To secure new revenue sources and expand orders for general-market construction work in the Kanto region, which was expected to continue growing, the Tokyo Sales Office was reorganized as the Tokyo Branch, a construction execution organization, in March 2018.Sources

Reorganization of the Tokyo Sales Office into a branch systemSources

Partial revision of the 'Personal Information Handling Standards' and 'Information Security Implementation Guidelines'Sources

The Basic Policy on Systems to Ensure the Properness of Business Operations was revised, including provisions concerning risk management.Sources

To streamline insurance claims for current members and administrative procedures related to retired members, we outsourced part of the mutual aid association's administration from April 2018.Sources

Start of partial outsourcing of mutual aid association operationsSources

Expansion of the 'Touhatsu no Mori' maintenance activity areaSources

In May 2018, we underwent a transition audit by the certification body.Sources

Partial amendment of the 'Crisis Management Response Guidelines' (definition of fraudulent accounting, response upon occurrence)Sources

Held the 60th regular shareholders' meetingSources

July 2018: Sendai Thermal Power Station contractor buildingSources

July 2018: Land was acquired in Aizuwakamatsu City for construction of the Aizu Dormitory for the Aizu Branch.Sources

The cloud services contract was due for renewal in July 2018. In preparation for the renewal, the company reviewed service details, including the server configuration, and substantially reduced the contract amount compared with the original contract.Sources

In July of the same year, we received a determination that the transition was acceptable, obtained the certification registration certificate, and have remained so to date.Sources

Regarding this QMS, it was certified in July 2018 after undergoing a transition audit from ISO 9001 (2008 edition) to ISO 9001 (2015 edition) by the Power Equipment Technical Inspection Association.Sources

From August 2018, we established a course for retired members to allow continued membership after retirement. Although it is more expensive than before retirement, continuation at a level below the in-service course can be joined without notification.Sources

The telecommunications construction business changed its license from a general construction business to a specified construction business.Sources

After deliberation by the review committee and executive committee, it was decided in August 2018.Sources

From September 2008, a 'Computer Usage Record Ledger' was created to reconcile each individual's work computer usage time with the R/3 attendance system records, clarifying discrepancies, and it was rolled out company-wide.Sources

Employee asset-building measures included defined contribution pensions, employee savings plans, and an employee stock ownership plan. As these no longer served the purpose of helping employees build assets, they were discontinued in September 2018.Sources

Unit 4 of the Niigata Thermal Power Plant, having operated for about 50 years, has experienced aging equipment, and considering future demand forecasts, it was decommissioned in September 2018 and removal work was carried out.Sources

Abolition of the employee deposit systemSources

As part of its 60th-anniversary commemorative projects, the company decided in October 2018 to make minor changes to its workwear, helmets, and long-shaft safety boots to improve their functionality and safety, without incurring additional costs.Sources

Removal work for Unit 4 of the Niigata Thermal Power Plant (October 2018 – September 2022 (planned)). This was a single procurement for the removal of power equipment, chimneys, and buildings, and although it was a competitive project, our company became the prime contractor. In the removal of Unit 3 of Niigata Thermal Power Plant, a jack-down method was used for boiler removal as an environmental measure, but based on the noise and vibration suppression achieved with crane methods in the removal of Unit 3 of Hachinohe Thermal Power Plant, we adopted crane methods to reduce construction costs and secured the contract.Sources

To address the transition to Windows 10 following the end of Windows 7 support, and the resulting change to email and schedule management software through the introduction of Outlook, the company began replacing the company computers updated in fiscal 2010 with new models in November 2018.Sources

On November 19, 2018, at the 'Miyagi Connecting Forest Industry Exchange Festival' held at Sendai International Center, the long‑term contribution to forest maintenance was recognized, and a letter of gratitude was presented by the Governor of Miyagi Prefecture.Sources

Received a letter of appreciation from Miyagi Prefecture for the 'Touhatsu no Mori' maintenance activitiesSources

Commenced update of company computers (Windows 10, Office 365, migration to new S-WING platform)Sources

To reduce the burden on employees and improve the effectiveness of the PDCA cycle, made operational improvements, including “Narrowing Down Goals” (FY2019).Sources

By the end of FY2018, the company had more than 230 leased vehicles and approximately 110 company-owned vehicles. It is replacing its company-owned vehicles with leased vehicles, with the aim of completing the transition over the next three years.Sources

Starting with the 2019 season, the company added Albirex Niigata and Montedio Yamagata to its advertising sponsorships, focusing on reconstruction support and community activities.Sources

The 30th event will be held in 2019.Sources

For this computer replacement, the company did not purchase the computers itself, but used TOiNX’s rental service. This reduced initial implementation costs and improved the efficiency of computer operations and management throughout their lifecycle, from equipment procurement and configuration to troubleshooting and returns. The replacement was completed in January 2019.Sources

The helmets and safety shoes (long version) were decided to be changed from the items loaned in fiscal year 2019.Sources

The project was completed in FY2019.Sources

Shinobu Power Station waterwheel replacement (planned for 2019).Sources

Our company celebrated its 60th anniversary in February 2019.Sources

Regarding work clothes, it was decided to replace them sequentially from February 2019, taking into account the replacement inventory status.Sources

The second phase of the decommissioning work for Units 1 and 2 of the Shin-Sendai Thermal Power Plant ran from September 2015 to February 2021.Sources

On February 1, 2019, the headquarters held a ceremony in the 7th-floor conference room, and the operational agencies conducted a company-wide broadcast ceremony at their respective locations. Through messages from the chairman and president, we expressed gratitude to employees and partner companies and confirmed our basic philosophy and aspirations.Sources

Starting in April 2019, the company plans to implement a career map that outlines a path for young employees to envision their future, aiming to promote human resource development.Sources

Since April 2019, we have been contracted by Niigata Prefecture to conduct inspection and monitoring of the Karayata and Hironari power plants.Sources

We digitized five volumes covering the 10-year to 50-year histories and have made them available on our website since April 2019.Sources

30th Meeting of the Eleven-Company Discussion Meeting.Sources

Published: November 2019, Tohoku Power Generation Industrial Co., Ltd., 2-15-29 Omachi, Aoba-ku, Sendai 980-0804Sources

The inspection and routine inspection services contracted since fiscal 2001, and the small hydroelectric power plant maintenance services contracted since fiscal 2002, have been in-house by Tohoku Electric Power Co., Ltd. since fiscal 2020.Sources

Business Administration Office established within the Planning and General Affairs DepartmentSources

A next‑generation synchrotron facility is being built in Aoba‑yama, Sendai City, aiming for operation in the middle of FY2023. An innovation research complex originating from Tohoku will be established there as a research and development hub. Our company will also collaborate with universities and other companies to secure and develop talent for fusion research and development at the nanoscale.Sources

Quality Control Office → Safety and Quality DepartmentSources

Planning and General Affairs Department → Business Administration Office, Planning Department, and General Affairs DepartmentSources

Technical Development and Research Center (nondestructive testing) → Rifu Technical Training CenterSources

Technical Development and Research Center (research and development) → Engineering Department (Technical Development and Research Office)Sources

Decommissioning of New Sendai Thermal Power Plant Unit 1Sources

New Sendai Unit 3-1 (490,000)Sources

Decommissioning of Hachinohe Thermal Power Plant Unit 3Sources

Nuclear Quality Assurance OfficeSources

§07

News

40 ARTICLES

Tree Planting Activity at "Forest of the New Year" HeldSources

On October 22, 2026, a tree planting activity was conducted at "Forest of the New Year" in Rikuzentakata, Miyagi Prefecture, with 96 participants including officers, employees, and alumni. It was the first weekday event, drawing many participants from various branches, fostering a friendly atmosphere and interaction. Club coordinator Yuki Take from Vegalta Sendai joined and energized the activity.

Tōhoku Power Engineering Co., Ltd. Exhibits at the Agribusiness Creation Fair 2026Sources

Tōhoku Power Engineering Co., Ltd. will exhibit at the Agribusiness Creation Fair 2026, held from November 11 to 13, 2026, at the West Exhibition Hall of Tokyo Big Sight. The exhibition will showcase measures to prevent hexavalent chromium contamination in wood biomass ash. For inquiries, please contact the Engineering Department, Technology Development Research Laboratory.

Exhibition at the 26th International Nanotechnology ExpoSources

Tokai Power Engineering Co., Ltd. will exhibit at the 26th International Nanotechnology Expo, held at Tokyo Big Sight from December 16 to 18, 2026. The company plans to showcase surface modification technologies aimed at reducing ash deposition and high-temperature corrosion.

Broadcast of Weather Filler on Sendai Broadcasting's 'Mezamashi TV'Sources

Tohoku Power Engineering will broadcast the Weather Filler on Sendai Broadcasting's 'Mezamashi TV'. The broadcast period is from September 7, 2026 to February 22, 2027, every Monday from 8:50 a.m. to about 8:58 a.m. Filming locations are the headquarters, Rifu Production Factory (welding), and Rifu Technical Training Center.

Announcement of appearance on Sendai Broadcasting's "Sugoi Job!"Sources

Tohoku Power Engineering Co., Ltd. will appear on Sendai Broadcasting's program "Miyagi Work Variety Sugoi Job!". The broadcast will be from 9:50 to 10:50 on Tuesday, August 11, 2026 (holiday).

Regarding Executive PersonnelSources

Tohoku Power Engineering Co., Ltd. decided on executive appointments and administrative delegation at the 68th Annual General Meeting held on June 16, 2026, and the 451st Board of Directors meeting. Mr. Kazumasa Inoue was promoted to Managing Director, and Mr. Masayuki Watanabe was newly appointed as a Director.

Clearing and maintenance activities conducted at Touhatsu ForestSources

On April 18, 2026, at Touhatsu Forest in Rikuzentakata, Miyagi Prefecture, 71 people—including executives, employees, their families, and alumni—participated in volunteer maintenance activities. They worked on repairing stairs and maintaining walking paths, and new employees also joined, fostering intergenerational interaction. The activities were broadcast on programs of the Nippon TV network across the six Tohoku prefectures and Niigata Prefecture.

Signboard Advertisement Installed at JR Akita Station Parking LotSources

A signboard advertisement was installed on the wall of the JR Akita Station Topico/ALSS No. 1 Parking Lot. The advertisement measures 2.4 m wide by 2.4 m high, and installation began on April 1, 2026.

Sign Advertisement Installed at Bandai City Bus CenterSources

The company announced that it had installed a sign advertisement on the wall at Bus Bay 4 on the first floor of Bandai City Bus Center. The advertisement measures 6.0 m wide by 2.3 m high, and installation began on April 1, 2026.

Flag Advertisement Installed at JR Sendai StationSources

A flag advertisement measuring 4.8 m wide and 7.0 m high was installed above the East-West Free Passageway on the second floor of JR Sendai Station (Mori no Hidamari Galleria). It went up on April 1, 2026. If another company books a spot advertisement, that company's advertisement will be displayed for a certain period.

§08

Public records

GOV
National Tax Agency basic information3370001011329
Source: National Tax Agency Corporate Number Publication Site, basic three itemsSources
Trade name
東北発電工業株式会社
Trade name (kana)
トウホクハツデンコウギョウ
Name in English
Corporation type
301
Address
〒980-0804 宮城県仙台市青葉区大町2丁目15番29号
Postal code
9800804
Prefecture code
04
City code
101
Address outside Japan
Prefecture in English
City in English
Address outside Japan in English
Corporate number assignment date
2015-10-05
Update date
2018-07-06
Change date
2015-10-05
Registry closure date
Reason for registry closure
Successor corporate number
Details of the change
Latest record
1
Excluded from search
0
Processing type
01
Correction type
1
Trade name image ID
Address image ID
Sequence number
323906
METI gBizINFO3370001011329
Source: gBizINFO (Ministry of Economy, Trade and Industry)Sources
Corporate number
3370001011329
Trade name
東北発電工業株式会社
Trade name (kana)
トウホクハツデンコウギョウ
Trade name (alphabet)
Registry closure date
Reason for registry closure
Registered address
宮城県仙台市青葉区大町2丁目15番29号
Postal code
9800804
Prefecture
宮城県
Prefecture code
04
City or district
仙台市青葉区
City code
101
Street address
大町2丁目15番29号
Organisation type
301
Processing type
01
Correction type
1
Status
Representative
代表取締役 大野 貞彦
Capital
Employees
2029
Employees (male)
Employees (female)
Business summary
発変電設備,原子燃料サイクル設備,電気通信設備及び各種産業用設備の調査,設計,製作,施工,販売,賃貸借,診断,検査並びに運転,保守など
Website URL
Year founded
Business category
D:建設業
Date established
1959-02-02
Unified government qualification - grade
A||A|
Unified government qualification - business items
104|115|124|129|303|309|310|315
Update date
2018-07-06
Key information
3370001011329
§09

Sources & updates

SOURCES
↑