China Huaneng Group Co., Ltd.
Basic information
- Head office
- Chief executive
- Wen Shugang
- Employees (non-consolidated)
- Employees (consolidated)
- Start date
- End date
Websites
Business
Related companies
Network
History
Approved by the Ministry of Energy's Energy Personnel (1988) No. 19 document, the decision was made to establish the Huaneng Group preparatory team.![]()
The General Office of the State Council approved the establishment of China Huaneng Group with document Guo Ban Han (1988) No. 44, and agreed that Huaneng Group would be separately listed in the national plan and have certain foreign affairs approval rights.![]()
Approved by the General Office of the State Council, document Guo Ban Han (1988) No. 95, Kanghua International Barter Trade Company was transferred to Huaneng Group.![]()
Established in February 2001, it is the main force of the national 'West-to-East Power Transmission' and the largest power generation enterprise in Yunnan Province.![]()
Established in February 2001, it is the main force of the national 'West-to-East Power Transmission' and the largest power generation enterprise in Yunnan Province.![]()
Huaneng International Power Co., Ltd. received the 'Best Management Company in China' award from the magazine for 2003. The award was based on a survey of over 3,000 global fund management companies, and Huaneng International was the only Chinese company to win, ranking top in five categories: 'Best Corporate Strategy' first; 'Best Investor Value Enhancement' second; 'Best Corporate Governance' second; 'Best Operational Efficiency' first.![]()
Huaneng Group led the cooperation, with three parties forming a joint venture to handle project application and development. Participating in the project is a strategic move for Huaneng to implement industrial restructuring.![]()
Yongcheng Property Insurance Co., Ltd. was initiated by China Huaneng Group, China Datang Corporation, China Huadian Corporation, China Guodian Corporation, China Power Investment Corporation, Shenzhen Energy Group Co., Ltd., China Power Financial Co., Ltd., Guohua Energy Investment Co., Ltd., Fujian Investment Enterprise Group, Yunnan Electric Power Group, Northern United Electric Power Co., Ltd., and XinYuan Industrial Holdings Group.![]()
China Huaneng Group and Hainan Provincial People's Government reached an agreement to transfer 31.14% of China Hainan Energy shares held by Hainan Power Company to Huaneng Group, with a signing ceremony held in Haikou. After the agreement, Huaneng Group holds 50.76% of China Hainan Energy.![]()
Huaneng Group will transfer 90% of Jinggangshan Power Plant and 40% of Handan Feng Power Plant; Huaneng International Power will transfer all assets and debts of Yingkou Power Plant, 60% of Luohuang Power Generation Co., Ltd., and 55% of Yueyang Power Generation Co., Ltd.; Jiangxi Investment will transfer 10% of Jinggangshan Power Plant to Huaneng International Power Co., Ltd. This transfer expands the operational scale and regional coverage of Huaneng International Power, increasing installed capacity by 3.096 million kW, from 15.736 million kW to 18.832 million kW.![]()
Xiaowan Hydropower Station Longkou closure, Xiaowan Hydropower Station successfully achieved the diversion target one year ahead of schedule. The successful diversion of the Yangtze River at Xiaowan Hydropower Station marks the transition of Xiaowan Power Station into the excavation of the foundation pit and dam concrete construction, entering a new critical period.![]()
Our country's first 600,000-kilowatt domestically produced supercritical coal-fired unit — Huaneng Qinbei Power Plant Unit 1 successfully passed 168 hours of trial operation and officially put into production. This marks a new level in our country's power station equipment manufacturing and power industry equipment.![]()
Huaneng Group's Huaneng Real Estate Development Company will be formally transferred to China Real Estate Group without compensation. This move signifies a substantial step in the restructuring of central enterprise real estate resources.![]()
Huaneng Group entrusted Northwest Electric Power Design Institute to conduct a feasibility study on coal gasification power generation technical renovation projects at Shantou Gas Turbine Power Plant and Chongqing Gas Turbine Power Plant.![]()
Huaneng Technology Center will rely on Xi'an Thermal Engineering Institute, one of Huaneng's three strategic forces, to develop into Huaneng's research and development center, technical service center, technical supervision center, scientific research achievement transformation center, and high-tech talent training center, providing high-quality, precise, and strong technical support for the entire Huaneng system.![]()
The signing ceremony for the 5 billion yuan short-term financing bond underwriting agreement between Huaneng International Power Co., Ltd. and China Construction Bank Co., Ltd. was held at the headquarters of China Construction Bank.![]()
Huaneng Group's equity in the restructured Northern Power Company increased from 20% to 51%, gaining absolute control over Northern Power.![]()
Both parties will continue to strengthen cooperation in the construction of Zhejiang thermal power to alleviate the electricity shortage in Zhejiang Province as soon as possible. Huaneng Group ensures the commissioning of two 1 million kW domestically produced ultra-supercritical units at Huaneng Yuhuan Power Plant Phase I in 2007, with seawater desalination projects meeting the water supply needs of Yuhuan County and city. The Zhejiang Provincial Government included the continuous construction project of two 1 million kW units at Huaneng Yuhuan Power Plant Phase II in the Zhejiang Province 'Eleventh Five-Year' power development plan, and approved and supported Huaneng Group to carry out preliminary and construction work for the expansion of Phase II, helping to coordinate related issues during project implementation. The parties also reached an agreement on the development of Zhejiang's abundant renewable energy wind power resources.![]()
Huaneng Group signed an agreement with the U.S. Future Power Alliance in Beijing to officially join the alliance and jointly invest in and build the 'Future Power' high-end technology project. The 'Future Power' project in the U.S. was proposed and launched by U.S. President George W. Bush in 2003, with a planned investment of $950 million over ten years to design, build, and operate the world's first commercial demonstration power station with near-zero pollutant emissions. The project adopts a government-enterprise cooperation model, with eight internationally renowned energy companies currently signing member agreements to join the alliance, with Huaneng being the only Chinese enterprise.![]()
The meeting reviewed and approved the preliminary feasibility study report of the plant. This marks a substantial step towards the construction of a commercial demonstration nuclear power station with independent Chinese intellectual property rights and internationally advanced nuclear power research technology.![]()
○January 16-18, the 2011 China Huaneng Group Work Conference was held at Beijing Guoyi Hotel. The conference comprehensively reviewed and summarized the work of Huaneng Group in 2010 and during the 11th Five-Year Plan, clarified the development goals and tasks for the 12th Five-Year Plan, and deployed key tasks for 2011.![]()
○February 18, the Ministry of Science and Technology held the 2011 National Science and Technology Work Conference, commending advanced collectives and individuals emerging during the implementation of the 11th Five-Year Plan. China Huaneng Group was awarded the 'Excellent Team for the Implementation of the 11th Five-Year Plan' for its outstanding organization of science and technology work during the period.![]()
○February 25, the State-owned Assets Supervision and Administration Commission held a video conference to summarize and commend the contributions of central enterprises to the 2010 Shanghai Expo, recognizing outstanding contributions and achievements. The company, Shanghai Shidongkou No.1 Plant, Zhao Dongming, and Su Dung were awarded the honorary collective and individual titles for the 2010 Shanghai Expo.![]()
○February 25, China Huaneng Group held a headquarters cadre conference. The meeting required the headquarters to take the activity of striving for excellence as an opportunity to carry out the 'Efficiency Year' activity, focusing on improving work efficiency, solving prominent problems at all levels, and strengthening headquarters construction, improving work efficiency, and building a politically firm, highly efficient, scientifically managed, strongly service-oriented, diligent, and harmonious headquarters, playing a better core and leading role in the process of building a world-class enterprise with international competitiveness.![]()
○March 1, Huaneng Shidaowan High-Temperature Gas-Cooled Reactor Demonstration Project was approved by the State Council Executive Meeting.![]()
○March 5, the 11th National People's Congress Fourth Session was grandly opened in Beijing. Representatives Cao Peixi, Zhang Yanqi, Zhang Jianlin, and Su Supei from China Huaneng Group attended the conference. During the meeting, Cao Peixi, General Manager of Huaneng Group, attended as a representative of the Xinjiang delegation; Zhang Yanqi, General Manager of Huaneng Heilongjiang, attended as a representative of Heilongjiang; Zhang Jianlin, General Manager of Huaneng Hunan Branch, attended as a representative of Hunan; Su Supei, from Gansu Huateng Coal Mine Transport Team, attended as a representative of Gansu, discussing national affairs and development with all delegates.![]()
○March 19, the Huaneng Nuozhadu Hydropower Station, the largest hydropower station in Yunnan and a key project, was approved by the National Development and Reform Commission. The project has a total installed capacity of 5.85 million kW, with a total investment of about 45 billion yuan. It is the largest project in the Lancang River basin in terms of scale and regulation reservoir capacity, and a world-class hydropower engineering.![]()
○March 21, at the 14th Asia International Conference on Electric Power and Electrical Engineering held in Singapore, China Huaneng Group was awarded the 'Power Company of the Year' award. The award is based on outstanding contributions in business planning, expansion, finance, and social contribution over the past year, voted on by senior management of Asian power companies. Huaneng was honored for its strong influence in the power industry, good performance, rapid development, and good social responsibility fulfillment.![]()
○April 1, China Huaneng Group signed a cooperation agreement with Tsinghua University on utilizing desulfurization by-products to transform saline-alkali land. Under the agreement, over the next 15 years, Huaneng's coal-fired power plants will provide free desulfurization gypsum to Tsinghua University for transforming saline-alkali land.![]()
○April 6, China Huaneng Group signed a strategic cooperation framework agreement with China Aluminum Corporation at the company headquarters. During the 12th Five-Year Plan period, both parties will leverage their advantages and resources to carry out comprehensive strategic cooperation in power project construction and investment, mineral resource development, and aluminum-electricity joint operation.![]()
○April 6, China Huaneng Group participated in the 9th China International Nuclear Power Industry Exhibition held at Shenzhen Convention and Exhibition Center, organized by the China Nuclear Energy Industry Association. The theme was 'Develop Green Power, Contribute to Clean Energy,' focusing on showcasing the high-temperature gas-cooled reactor demonstration project independently designed by China, which was included in the national major science and technology projects.![]()
○April 7, China Huaneng Group successfully issued the first batch of 2.5 billion yuan in medium-term notes for 2011, with a term of 5 years and a coupon rate of 5.39%, with an overall financing cost including underwriting fee of about 5.69%. On April 12 and 13, the company successfully issued the first and second batches of short-term financing bonds, totaling 7 billion yuan, with a 1-year term and a coupon rate of 4.42%, with an overall financing cost including underwriting fee of about 4.82%.![]()
○April 11, China Huaneng Group and Guangdong Yuedian Group jointly announced that their joint venture, Overseas International Xingye Co., Ltd., successfully acquired a 50% stake in India GMR Group's International Power Company (InterGen) with an equity value of 1.232 billion USD.![]()
○On April 18, China Huaneng Group held the first meeting of the 2011 Management Committee Executive Committee and the first quarter economic activity analysis meeting, requiring units within the Huaneng system to carefully grasp the macroeconomic situation and the impact of the three market trends on the company's operations, focusing on improving economic efficiency, strengthening management internally, exploring potential, creating an external environment, striving for policies, and making every effort to turn losses into profits, ensuring the completion of annual goals and tasks, and proposing 60 specific measures.![]()
○On April 22, the 2010 Touching Power Person and Team Awards Ceremony was held at the Great Hall of the People, hosted by China Electric Power News and the China Electric Power Newspaper Association. Huaneng Aid Tibet Ali Project Team was awarded the '2010 Touching Power Team Award'.![]()
○On May 20, China Huaneng Group held a leadership meeting for the headquarters construction 'Efficiency Year'. The meeting heard reports on the first phase of the 'Efficiency Year' work, shared experiences on studying General Secretary Xi Jinping's important speech 'Key lies in implementation', reported on the first phase of the 'Efficiency Year' work, and proposed measures and opinions for the second phase based on departmental realities.![]()
○On May 23, the Governor of Queensland, Australia, Annastacia Palaszczuk, sent a thank you letter, expressing gratitude for China Huaneng Group's donation of 100,000 Australian dollars to the 'Governor's Flood Relief Fund'.![]()
○On May 26, China Huaneng Group participated in the '2011 China Industrial Economy Industry Corporate Social Responsibility Report Release Conference' and publicly released the '2010 Sustainable Development Report'.![]()
○On June 10, Huaneng New Energy Co., Ltd. ('Huaneng New Energy', stock code: 00958) began trading on the Hong Kong Stock Exchange. The company issued 2.485 billion shares globally at HKD 2.50 per share, raising a total of USD 799 million (about HKD 6.2 billion).![]()
○On June 15, the State-owned Assets Supervision and Administration Commission issued a decision to commend 32 central enterprises, including China Huaneng Group, as 'Excellent Energy-saving and Emission-reduction Enterprises' during the 'Eleventh Five-Year Plan'. Huaneng ranked tenth among power generation companies, maintaining a leading position.![]()
○On June 16, China Huaneng Group held the first leadership team meeting for the 2011 department deputy director level job public recruitment. The meeting approved the '2011 Group Company Department Deputy Director Level Job Public Recruitment Announcement' and decided to conduct open recruitment for 25 positions at the department deputy director level within the system.![]()
○On June 29, China Huaneng Group held a celebration and commendation conference for the 90th anniversary of the founding of the Communist Party of China and the 'Create First-Class and Strive for Excellence' activities. The meeting conveyed the spirit of the central enterprise commendation conference celebrating the 90th anniversary, commended the group's 'Four Strong' Party organizations, 'Four Excellent' Communist Party members, and outstanding Party workers, further motivating and mobilizing the company's Party members and cadres to strengthen ideals and beliefs and strive for excellence to build a world-class enterprise with international competitiveness.![]()
○On July 7, Fortune magazine's Chinese official website released the 2011 Fortune Global 500 list, with China Huaneng Group ranking 276th, up 37 places from 2010, with operating revenue reaching USD 33.681 billion.![]()
○On July 14, China Huaneng Group's daily power generation hit a new high, reaching 1.963 billion kWh, an increase of 28.52% year-on-year.![]()
On May 13, China Huaneng Group held a meeting on the Party's Mass Line Education Practice, conveying and studying the important instructions of General Secretary Xi Jinping and the important speech by Liu Yunshan at the Central Education Practice Video Conference, and deploying the company's problem-solving and criticism activities.![]()
On May 13, the 8th China Baosteel Environmental Award ceremony was held at the Great Hall of the People. Yuhuan Power Plant ranked first in total score and won the Excellent Award in corporate environmental protection, becoming the only power generation enterprise to receive this honor.![]()
From May 14 to 18, the 17th China Beijing International Science and Technology Industry Expo was held at the China International Exhibition Center, themed 'Innovation-Driven, Integrated Development.' Guo Jinlong, member of the Political Bureau of the CPC Central Committee and Secretary of the Beijing Municipal Committee, Liu Cui Gui, Director of the State Oceanic Administration, and UN Deputy Secretary-General Shamshad Akhtar visited China Huaneng Group's booth, highly praising Huaneng's efforts and achievements in promoting green and low-carbon energy technology innovation. During the exhibition, the company showcased its key technologies and representative projects in clean and efficient coal-fired power plants, new energy generation, hydropower, and nuclear power through 11 models, display boards, videos, and brochures, fully demonstrating its philosophy and technological achievements in developing clean, efficient, and green energy, attracting many experts, scholars, and visitors.![]()
On June 16, the National Energy Administration announced that China Huaneng's Tianjin IGCC demonstration project and 700°C ultra-supercritical high-efficiency power generation R&D project were included in the 'Energy Industry Air Pollution Control Work Plan' formulated by the National Development and Reform Commission, the Energy Administration, and the Ministry of Environment, as key projects to promote efficient and clean conversion of coal resources.![]()
On May 19, China Huaneng's General Manager Cao Peixi visited Cambodian Prime Minister Hun Sen in Shanghai during the ASEM Summit, exchanging views on strengthening cooperation in the energy sector.![]()
On May 20, in the presence of Chinese President Xi Jinping and Russian President Vladimir Putin, China Huaneng's General Manager Cao Peixi and Boris Kravchuk, President of United Power System International, signed a strategic cooperation memorandum of understanding at the West Lake Hotel in Shanghai. According to the memorandum, both parties will actively explore opportunities for joint development of power projects in China, Russia, and other regions.![]()
On May 28-29, the China Electricity Council announced the award results of the 18th National Thermal Power Unit Efficiency Competition, with 87 units recognized as outstanding in 2013. China Huaneng Group had 14 units awarded, including 3 first prizes, 6 second prizes, and 5 third prizes. Among 1-million-kilowatt units, Huaneng Jinling Power Plant Unit 1 and Huaneng Haimen Power Plant Unit 1 received second and third prizes, respectively. Among ultra-supercritical units of 600,000 kilowatts, Huaneng Shidongkou No. 4 and Huaneng Weihai Power Plant No. 5 took first prizes, and Huaneng Fuzhou Power Plant No. 5 received a third prize. In the subcritical category, Huaneng Dezhou Power Plant Unit 6 won first prize, and Units 5 and 2 of Huaneng Dezhou and Huaneng Dian Dong Power Plant received third prizes. In the air-cooled ultra-supercritical category, Huaneng Shang'an Power Plant Unit 5 and Huaneng Zuoquan Power Plant Unit 1 received second and third prizes. In the air-cooled subcritical category, Huaneng Tongchuan Power Plant Units 1 and 2 received second prizes.![]()
On June 1, Singapore Tuas Power's Dungun Satu cogeneration project Phase II A was officially completed and put into commercial operation. The project, started in September 2011, includes a 450-ton/hour circulating fluidized bed boiler, a 200-ton/hour backup boiler, and a 32.5 MW generator with associated piping and facilities. After commissioning, Tuas Power owns 8 units in Singapore with a total installed capacity of 2.61 GW, accounting for about 21% of Singapore's electricity market.![]()
The joint-stock company was selected as a constituent of the new Hang Seng High Dividend Yield Index by the Hong Kong Hang Seng Index Company, effective from June 9. The index includes the top 50 stocks and/or real estate investment trusts listed on the Hong Kong Stock Exchange with the highest net dividend yield. Being part of the Hang Seng High Dividend Yield Index helps the company attract stable return investors and has a positive impact on expanding its market influence.![]()
On June 11, under the joint witness of Premier Li Keqiang and Italian Prime Minister Matteo Renz, Cao Peixi, General Manager of China Huaneng Group, and Francesco Starace, CEO and General Manager of Italy's National Power Company, signed the 'Cooperation Framework Agreement between China Huaneng Group and Italy's National Power Company' at the Great Hall of the People in Beijing. According to the agreement, both parties will explore cooperation in technology, power project development, management research, carbon assets, and carbon strategy management based on principles of sincerity, mutual benefit, complementarity, and shared development.![]()
On June 12, the National Energy Administration and China Electricity Council jointly announced the 2013 reliability evaluation results for national thermal power units. Based on comprehensive reliability evaluation indicators, six units of 1 million kW grade A, 21 units of 600,000 kW grade A, and 15 units of B grade were rated. Among them, China Huaneng Group has 8 units rated as A grade and 11 units as B grade. The Haimen Power Plant Unit 1 was rated as A grade. In the 600,000 kW category, Shidongkou Second Power Plant Unit 1 and Jiu Tai Power Plant Unit 2 were rated as A grade, while Yimin Power Plant Unit 5, Shang'an Power Plant Unit 5, Qinbei Power Plant Unit 3, Tongchuan Zhaojin Power Plant Unit 1, and Yuwang Power Plant Unit 2 were rated as B grade. In the 300,000 kW category, Dalat Power Plant Units 1 and 2, Dezhou Power Plant Unit 3, Shang'an Power Plant Unit 1, Haikou Power Plant Unit 8 were rated as A grade, and Dalat Power Plant Units 6 and 5, Yangliuqing Thermal Power Plant Unit 8, Xinhua Power Plant Unit 6, Fuzhou Power Plant Unit 3, and Daba Power Plant Unit 1 were rated as B grade.![]()
From June 12 to 13, the 2014 Management Innovation Achievements Review Meeting of China Huaneng Group was held in Jinan. This was the company's first systematic review of management innovation achievements. A total of 92 projects from various units of the system were submitted, with 44 shortlisted after preliminary review.![]()
On June 15, the 50,000 kW capacity Unit 2 of Feixian Pass Power Plant of Sichuan Company completed 72 hours of full-load continuous test operation and was officially put into operation.![]()
On June 17, the State-owned Assets Supervision and Administration Commission issued a notice announcing the best-performing thermal power units in energy efficiency levels across different grades for 2013. China Huaneng Group has 9 units listed, accounting for 50% of the total. The No. 4 unit of Shidongkou Second Power Plant was rated as the most energy-efficient ultra-supercritical wet-cooled coal-fired unit of 600,000 kW, and the No. 5 unit of Weihai Power Plant was rated as the most power-efficient ultra-supercritical wet-cooled unit of 600,000 kW. Other units also received various awards for their efficiency.![]()
On June 19, Tian Sheng 15 Wheel, loaded with 80,000 tons of 5500 kcal thermal coal, successfully arrived at Shanghai Luojing Port from Indonesia's BonTang Port, marking the successful trial operation of the company's first overseas coal shipment, opening a new chapter for the company's overseas business expansion.![]()
On June 26, the last unit of Nuozhadu Hydropower Station was officially put into operation. With a total installed capacity of 5.85 million kW, China Huaneng's Nuozhadu Hydropower Station is now fully operational, making it the fourth largest hydropower station in China and the largest in Yunnan.![]()
On June 26, the photovoltaic power supply system project for electrification-deprived areas in four counties of Huangnan Prefecture and two counties of Haidong City, aided by China Huaneng Group, was completed, with 3,140 sets of equipment installed and commissioned. The project started on May 13, with a total installed capacity of 1,004.8 kW, providing electricity to 12,845 people.![]()
On July 3, the first batch of concrete was poured for the main plant building of the Xining cogeneration project (2×350,000 kW), marking the official start of main construction.![]()
On July 7, Fortune China released the 2014 Fortune Global 500 list. China Huaneng Group ranked 221st, up 10 places from 2013, with an operating revenue of $47.6811 billion. Since first entering the Fortune Global 500 in July 2009 at 425th place, its ranking has steadily improved each year.![]()
On July 15, the China Securities Regulatory Commission announced that Great Wall Securities' classification rating was upgraded from B BBB to A A, removing obstacles for the company's new business development.![]()
On July 22, the State-owned Assets Supervision and Administration Commission announced that China Huaneng Group successfully completed the 2013 annual business performance evaluation and was rated as Grade A. This is the ninth time since 2004 that Huaneng has received the Grade A rating in the performance evaluation.![]()
The 2014 Mid-Year Work Conference and First Half Year Economic Activity Analysis Meeting of China Huaneng Group was held in Beijing on July 23-24. The meeting summarized the work of the first half of the year, analyzed the faced situation, deployed the second half of the year's work, mobilized all employees, invigorated spirits, pioneered and made progress, seized the opportunity, and made efforts to ensure the full completion of annual goals and tasks, accelerate the creation of a world-class enterprise. In the first half of the year, the company completed a power generation of 326.2 billion kWh, of which domestic power generation was 321.0 billion kWh, an increase of 6.72% year-on-year; the combined operating income increased by 4% year-on-year; coal production reached 34.18 million tons; power supply coal consumption was 309.57 grams per kWh, down 3.46 grams per kWh year-on-year; the plant power consumption rate was 4.41%, down 0.22 percentage points year-on-year; performance in sulfur dioxide, nitrogen oxides, and smoke emissions was at industry-leading levels. As of the end of June, the company's domestic and overseas wholly-owned and controlling power plants had an installed capacity of 145.27 million kW, an increase of 5.2% year-on-year, with the proportion of low-carbon clean energy reaching 25.4%. The company ranked 221st in the 2014 Fortune Global 500, rising 10 places from 2013. The company received an A-level in the 2013 operational performance assessment.![]()
The National Science and Technology Awards Conference was held in Beijing by the Central Committee of the Communist Party of China and the State Council. The project 'Key Technologies and Applications of Ultra-High Heart Wall Rockfill Dam' based on the Nuozhadu Hydropower Station of Huaneng was awarded the Second Prize of the National Science and Technology Progress Award in 2014. The achievement of multiple innovative results with independent intellectual property rights has advanced China's rockfill dam construction technology to a new level and led China's 300-meter ultra-high heart wall rockfill dam construction technology.![]()
On January 15, the China Enterprise Confederation website announced the results of the 21st National Modern Enterprise Management Innovation Achievement Selection. Huaneng Group has four management innovation achievements awarded, including Shandong company's "Online Business Management of Power Generation Enterprises Based on an Integrated Information Platform" which won the first prize for innovation achievement, and Lancang River company's "Construction and Operation Management of Overseas Large Hydropower Stations Based on BOT Model," "Ecological and Environmental Protection Management of Hydropower Engineering Construction," and New Energy company's "Distributed Access Wind Power Project Development, Construction, and Operation Management," which won second prizes.![]()
On January 16, Huaneng Group Party Committee held the 2014 Leadership Democratic Life Meeting themed "Strict Party Life, Strict Party Discipline, Deepen Work Style Construction." The company's main leaders took the lead in self-examination, and other members conducted individual inspections, closely related to their thoughts, work, and style. They identified major issues in implementing democratic centralism, adhering to political, organizational, and integrity disciplines, implementing the spirit of the Central Eight Regulations, resolutely opposing the "Four Winds," fulfilling duties, and tackling difficulties. Causes were analyzed, roots dug deep, and rectification measures proposed. After each member's self-examination speech, other members offered criticism with a highly responsible attitude towards colleagues and the cause.![]()
On January 19, People's Daily published the headline "Thermal Power Low Emissions, Coal Burning Like Gas, Huaneng Green Coal Power Shows a Glimmer of Hope." The article introduced Huaneng Group, a world-class power generation enterprise with an installed capacity of 150 million kW, which has implemented ultra-low emission transformations on existing coal-fired units through increased investment and technological innovation, actively exploring frontier coal power technologies, and achieving green development.![]()
On January 28, Huaneng Group signed a strategic cooperation framework agreement with Shenhua Group at its headquarters. According to the agreement, both parties will leverage their advantages in power development and operation, coal development and management, coal sales and procurement, coal chemical industry, technological innovation, material management, capital services, transportation, emerging energy industries, and overseas projects, to deepen cooperation and achieve mutual development.![]()
From January 28 to 30, Huaneng Group held its first Workers' Congress and 2015 Work Conference in Beijing. The meeting reviewed and summarized 2014, analyzed the situation, and planned 2015 work, proposing overall ideas including implementing the spirit of the 18th National Congress, the Third and Fourth Plenary Sessions, and the Central Commission for Discipline Inspection, studying and implementing Xi Jinping's important speeches, and adhering to the work tone of "steady progress." It emphasized risk awareness, opportunity awareness, innovation, improving quality and efficiency, market competitiveness, structural adjustments, reform and innovation, law-based management, risk control, strict party governance, and achieving the four major performance goals and the "Twelfth Five-Year Plan" objectives.![]()
On February 27, the Central Seventh Inspection Team stationed at Huaneng Group to carry out special inspections. The team leader Liu Zu delivered a speech at the mobilization meeting. The Office of the Central Inspection Work Leading Group made requirements for cooperation. The team will work at Huaneng Group for two months (February 27 to April 27). The team mainly handles letters, calls, and visits related to issues with leadership teams, including political discipline, organizational discipline, integrity discipline, and personnel appointments.![]()
On February 28, the Central Spiritual Civilization Construction Guidance Committee announced the awards for the Fourth National Civilized Cities (Districts), Civilized Villages, and Civilized Units. Nine units including Huaneng Yangliuqing Thermal Power Plant, Baotou Third Thermal Power Plant, Dongfang Power Plant, Haikou Power Plant, Luohuang Power Plant, Lancang River Company, Nuozhadu Hydropower Station, Jinghong Hydropower Plant, and Miaowei Gongguoqiao Hydropower Station were awarded the title of "National Civilized Units." As a result, Huaneng Group has a total of 22 units awarded the title.![]()
On March 6, Ningxia Company Dam Power Plant's 2×660,000 kW coal-fired units project officially started construction. The project is one of the supporting power sources for the ±800 kV UHV DC transmission project from Ningdong to Zhejiang, with Huaneng Group and Zhejiang Energy Group investing 51% and 49%, respectively.![]()
On March 17, Huaneng Group held the appointment meeting for the first batch of chief experts and chief technicians, appointing Yang Xin and Yang Shoumin as honorary chief experts, and姚伟 and 11 others as chief experts, and Wang Jian and 16 others as chief technicians. The term of the first batch of chief experts and chief technicians is three years.![]()
On April 9, the first "China Electric Power Model" selection event was held in Beijing. Deputy Chief Engineer of Huaneng Tibet Company and Director of Jacha Hydropower Project Preparatory Office, Yao Gengzheng, and Fan Zhizhi from Ulan Mountain Power Plant of Northern Company were awarded the "China Electric Power Model," and Liu Zhenhua, Wang Fojing, Xiang Bing, and Ren Yongqiang from the Huaneng system received the "China Electric Power Model Nomination Award."![]()
At the National Equipment Management Innovation Achievements Exchange Conference held from April 9th to 10th, the Imine Open-pit Mine's 'Successful Application of Preventive Maintenance Management in Semi-Continuous Systems' won the second prize in the national equipment management innovation achievements.![]()
On April 13th, Ivan Glazhov, Chairman of the Russian State Duma Energy Committee, led a delegation to visit Huaneng Group. Li Qingwen, Chairman of China Energy Automobile Communication Group, and Jie Shujian, Editor-in-Chief of China Energy News Agency, accompanied the visit.![]()
On April 15th, the National New Energy Company led the undertaking of the third part of the National 863 Project—'Design, Construction, Operation, and Maintenance Technical Specifications for Offshore Wind Farms and Construction of Testing and Certification System'—which passed the acceptance organized by the Ministry of Science and Technology.![]()
On April 17th, Huaneng Group's Expert Committee annual meeting was held at the company's headquarters. Ten academicians and legal experts, including Zhou Xiaoxin, Zhu Bofang, Ge Xiurong, Cen Kefa, Huang Qili, Jiang Hongde, Ma Hongqi, Ye Qizhen, Xie Kechang, and Li Xiaohong, discussed topics around 'Innovation-Driven Development.' They provided guidance and targeted suggestions on improving the efficiency of operational coal-fired units, exploring energy internet construction, accelerating the 'Going Out' of Belt and Road energy projects, coal grading utilization, enhancing high dam and large reservoir operation management and key technology reserves, participating in major gas turbine scientific projects, developing renewable energy and distributed energy in high-altitude and marine areas, building a nuclear power talent team, and strengthening intellectual property protection.![]()
On April 17th, the Chongqing Mineral Resources Development Co., Ltd., implemented the 'Zhuoyan 1HF Well' in the Chongqing Qianjiang Shale Gas Block, successfully started drilling in Shuishi Township, Qianjiang District. 'Zhuoyan 1HF Well' is the first horizontal appraisal well in the Qianjiang Shale Gas Block. On May 8th, the 3D seismic exploration project began, marking the transition from regional exploration to fine exploration in the shale gas block.![]()
On April 19th, the Power Purchase Agreement (PPA) and Implementation Agreement (IA) for the Sahiwal Coal Power Project were signed in Islamabad, Pakistan. Huaneng Shandong Ruyi (Pakistan) Energy Co., Ltd. signed the PPA with Pakistan's National Transmission and Dispatch Company (NTDC) and the IA with the Pakistan Power Management Committee (PPIB). The signing of these agreements signifies the implementation of relevant policies and measures for the development of the Sahiwal Coal Power Project, which is backed by national sovereignty and has legal protection. The project, located in Sahiwal, Punjab Province, Pakistan, plans to build two 660,000-kilowatt supercritical coal-fired units, with construction starting in June 2015 and full commissioning by the end of 2017. Once completed, it is expected to generate over 8 billion kWh annually, effectively alleviating Pakistan's local power shortage and promoting local economic development.![]()
On April 20th, in the presence of Chinese President Xi Jinping and Pakistani Prime Minister Nawaz Sharif, Huaneng Group's General Manager Cao Peixi signed an energy strategic cooperation framework agreement with Jahan Zeb, Minister of Energy of Punjab Province, Pakistan, in Islamabad. According to the agreement, both parties will form strategic partnerships in energy and related fields, leveraging their respective advantages to cooperate in power supply, coal, ports, transportation, and other energy sectors in Pakistan, jointly promoting the China-Pakistan Economic Corridor construction, and further strengthening the strategic partnership between China and Pakistan.![]()
On April 23rd, Ma Kai, a member of the Political Bureau of the CPC Central Committee and Vice Premier of the State Council, visited the 11th China International Nuclear Power Industry Exhibition. He attentively visited the Huaneng Group booth, listened to reports on the progress of the Shidaowan High-Temperature Gas-Cooled Reactor Nuclear Power Plant project and Huaneng's overall development of the Shidaowan nuclear power base, including the planned construction of the CAP1400 large advanced pressurized water reactor demonstration project. He also viewed the model of the Shidaowan nuclear power base and the high-temperature gas-cooled reactor nuclear power unit model, praising Huaneng's active promotion of the autonomous fourth-generation nuclear power technology.![]()
On April 28, Huaneng Group, China Power Construction Group, and Dongfang Electric Group signed a tripartite strategic cooperation agreement at the company's headquarters. According to the agreement, the three parties will establish a comprehensive strategic partnership, leveraging their unique advantages in investment, construction, and supply, focusing on strengthening cooperation in the development, construction, and operation management of overseas power and resource projects. This will form a mutually beneficial community of interests with complementary advantages, shared risks, and common development, achieving their strategic development goals. The signing of this agreement is an important step for the three parties to deepen strategic cooperation, actively respond to the national "Belt and Road" initiative, implement the State Council's deployment of "going global" for equipment and capacity, promote internationalization, and create world-class enterprises with international competitiveness.![]()
On April 28, the celebration of "May Day" International Labor Day and the commendation of national model workers and advanced workers was grandly held at the Great Hall of the People in Beijing. The Central Committee of the Communist Party of China and the State Council awarded the honorary title of "National Model Worker" to 2,064 individuals. Three employees, including Zhou Tao, Deputy Chief Engineer of Dalaert Power Plant of North China Branch of Huaneng Group, Xu Hai, Deputy Manager of Linyi Power Plant Fuel Company of Shandong Branch, and He Maqun, Maintenance Director of Zongtai Power Plant of Shandong Branch, received this honor.![]()
On May 6, the Xilin Gol Clean Energy Output Base Power Supply Project commencement mobilization conference was held in Xilinhot City, Inner Mongolia. The Xilin Gol Clean Energy Base is one of nine coal power bases planned by the state, responsible for transmitting clean and stable electricity to the Beijing-Tianjin-Hebei and Shandong regions. The project includes three power stations with a total capacity of 8.62 million kW, including wind power with a capacity of 3 million kW. Huaneng Xilinhot Shengli Thermal Power Plant is one of the supporting thermal power projects for the channel, planning to build two 660,000 kW high-efficiency ultra-supercritical units, with construction scheduled to start within this year.![]()
On May 6, two 660,000 kW ultra-supercritical high-efficiency coal units at Changxing Power Plant achieved full load operation simultaneously under AGC mode for the first time, with a total output of 1.32 million kW, achieving the three major design goals of "safe, economical, and environmentally friendly" operation.![]()
On May 12, in the presence of Chinese President Xi Jinping and Belarusian President Lukashenko, Huaneng Group's Yongcheng Property Insurance Co., Ltd. received an agreement from the China-Belarus Industrial Park Management Committee, officially settling in the China-Belarus Industrial Park. The park, built near Minsk Airport, covers an area of 91.5 square kilometers with a total investment of about $5.6 billion. It is the highest-level, largest land area, and most policy-favorable overseas industrial park for China and a landmark project of the "Belt and Road" initiative.![]()
On May 12, Li Ganjie, Vice Minister of the Ministry of Ecology and Environment and Director of the National Nuclear Safety Administration, visited Shidaowan Company to investigate, inspecting the High-Temperature Gas-Cooled Reactor Demonstration Project and CAP1400 Demonstration Project sites, listening to reports on project progress, and emphasizing that safety must always be prioritized and managed diligently.![]()
On May 13, at the 5th China International Energy Storage Conference, Huaneng Clean Energy Research Institute's "Rooftop Photovoltaic-Energy Storage Microgrid Project" participated in the "2014-2015 China Energy Storage Industry Most Influential" series evaluation and was awarded the "Most Beautiful Microgrid Demonstration Operation Project in China." The project uses Huaneng's proprietary distributed photovoltaic microgrid technology, providing a platform for the development of new distributed photovoltaic smart microgrid generation technology.![]()
On May 14, the Sichuan Development and Reform Commission approved the Sichuan Preparatory Office of the New Energy Company’s Zhaojue Wancun Long'en Phase I Wind Power Project.![]()
On May 17, Unit 1 of Luoyang Cogeneration Project successfully completed 168 hours of full load trial operation and was put into production.![]()
On May 18, the fully loaded "Ruining 9" ship with 45,048 tons of coal departed from Haimen Port heading to Haikou Power Plant, marking the first time imported coal was transferred across provinces via Haimen Port to Hainan Company.![]()
On May 22, Huaneng Group held an expanded party group (study) meeting, with Party Secretary Huang Yongda delivering a special lecture on "Three Stricts and Three Honests," marking the official start of the "Three Stricts and Three Honests" special education campaign.![]()
From May 25 to 26, Liu Qi, Vice Chairman of the National Energy Administration, visited Huaneng Shidaowan High-Temperature Gas-Cooled Reactor Demonstration Project in Rongcheng, Shandong, as well as the Zhujia Wind Farm and Shanghai Electric Group's high-temperature gas-cooled reactor equipment manufacturing workshop in Lingang, Shanghai. He stated that the NEA will continue to strengthen coordination and support for the projects, actively promote nuclear power localization, and achieve commercial operation of high-temperature gas-cooled reactors as soon as possible, supporting Huaneng in accelerating the Fujian Xiapu project.![]()
On May 31, all 75 turbines at Subo Top Wind Farm passed 240 hours of trial operation and officially went into operation.![]()
On June 2, China Huaneng Group signed "Project Cooperation Memorandum," "Strategic Cooperation Framework Agreement on Soft Science Research," and "Strategic Cooperation Agreement on Technology Research" with Korea Electric Power Corporation at the company's headquarters. Based on these agreements, Huaneng Group and KEPCO will leverage their respective advantages to promote cooperation in domestic and overseas power projects, and strengthen communication and collaboration in strategy, management, market, technology, environmental protection, and talent development.![]()
On November 6th, the Weihai Power Plant Unit 6 energy-saving advanced technology integration application and demonstration, as well as environmental ultra-low emission renovation project, was officially launched. This project is a demonstration project actively responded to and implemented by China Huaneng Group in accordance with the national "Coal Power Energy Saving and Emission Reduction Upgrade and Renovation Action Plan (2014-2020)." After the renovation, it will accumulate experience for the entire Huaneng system's coal power energy saving and emission reduction upgrade and renovation, serving as a demonstration. The energy-saving demonstration renovation project includes 13 advanced energy-saving technology renovation projects, with 4 environmental protection renovation projects implemented simultaneously. After the renovation, the emissions of dust, sulfur dioxide, and nitrogen oxides from the unit will meet ultra-low emission standards.![]()
On November 12th, during the first foreign ministerial meeting of the Lancang-Mekong Cooperation, the foreign ministers of the Lancang-Mekong countries attending the meeting in China inspected the Jinghong Hydropower Station and the resettlement sites in the reservoir area. Accompanied by Chinese Foreign Minister Wang Yi and Vice Minister Liu Zhenmin, the foreign ministers and government officials from Thailand, Cambodia, Laos, and Myanmar visited the production site of Jinghong Hydropower Station and the resettlement sites in the reservoir area, including Jiangtou Mami Village. They gained a detailed understanding of China Huaneng Group's overall situation, regional power cooperation, basin development and protection, ecological environmental protection, and social responsibility fulfillment, as well as the role of Jinghong Hydropower Station in urban water supply and downstream flood control. During the inspection, the foreign ministers of Mekong countries praised Huaneng and its subsidiaries for their focus on technological innovation, green development, and social responsibility. Wang Yi fully affirmed Huaneng's active cooperation with the national diplomacy and its good image of mutual benefit, win-win, and responsible state-owned enterprise in foreign power cooperation.![]()
On November 12th, the shareholding company completed the "lightning allocation" of non-public issuance of H shares, allocating 780 million H shares to 10 qualified investors at a price of HKD 7.32 per share, raising a total of HKD 5.71 billion. This issuance was the second-largest non-public issuance in the Hong Kong stock market in the second half of this year. After the issuance, the company's total share capital is 15.2 billion shares, with H shares accounting for 30.92% and A shares for 69.08%.![]()
On November 13th, the "Belt and Road" (Hong Kong) Summit Forum and the China Securities Golden Bauhinia Awards Ceremony were held in Hong Kong. Huaneng International Power Inc. was awarded the "Best Listed Company" award, and Huaneng New Energy Co., Ltd. was awarded the "Most Investment-Value Listed Company" award. Huaneng Group General Manager Cao Peixi was awarded the "Most Influential Listed Company Leader" award as Chairman of Huaneng New Energy Co., Ltd.![]()
From November 15th to 17th, the "12th Five-Year" enterprise culture summary and special cultural construction—Chinese and foreign enterprise culture 2015 summit was held in Chongqing, hosted by the China Enterprise Culture Research Association. Huaneng Group was awarded the "12th Five-Year" enterprise culture construction brand culture benchmark award.![]()
On November 17th, the internationally renowned financial magazine "The Asset" announced the winners of the "2015 Best Corporate Governance Award." The New Energy Company received the grand prize for best corporate governance. Among the winners, 25 companies received platinum and gold awards, and 5 received titanium awards. Among these, five central enterprises were awarded, and the New Energy Company is the only state-owned new energy operator to have received this award since its inception, representing continuous improvement in governance standards, with high standards in information disclosure and investor relations, widely recognized by capital markets.![]()
On November 17th, Huaneng Group held a central group study meeting themed "Strict Use of Power, Practical Work, Honest Entrepreneurship, and Establishing a New Image of Loyalty, Cleanliness, and Responsibility," organizing a third special education seminar on "Three Stricts and Three Honests."![]()
On December 1st, Huaneng Group's first unit of Yaren Hydropower Station in Tibet and its extension project completed all tests for trial operation and grid connection, officially connected to the grid and supplied power, marking the initial completion of Tibet's first renewable energy local network demonstration project. This ended the serious power shortage history for the people of Metok County and entered an era of clean, safe, stable, and reliable power supply. Units 2 and 4 of Yaren Hydropower Station were put into operation on December 5th and December 18th, 2015, respectively. Unit 3 was successfully commissioned on December 19th after 72 hours of trial operation, reaching commercial operation. The station has generated a total of 342,400 kWh of electricity, with a maximum power load of over 1,300 kW. The station is a key project to address the "12th Five-Year" power shortage in Metok County, located 15 km southwest of the county seat, with a planned installed capacity of 5,000 kW, using runoff water diversion design, with four units. It is more than twice the capacity of the 22 small micro power stations previously built in the county, and can basically meet the electricity needs during the "13th Five-Year" mid-term period. Construction began on December 25, 2013, and was completed after two years. The project also included the extension of transmission lines and a power dispatching center, achieving domestic first in integrating intelligent control for county-level local grid generation, transmission, transformation, and distribution "regulation and control integration," significantly improving the safety, stability, and reliability of Metok County's power supply.![]()
On December 4th, Huaneng Group held a meeting on deepening inspection and rectification work, summarizing the previous phase of inspection and rectification work, reporting recent overall inspection and rectification situation, and proposing deployment requirements for further deepening inspection and rectification based on issues and deficiencies found during the inspection.![]()
On December 12, Handan Feng Power Plant in Hebei Province switched the heat source for Pengduyuan Community from Fengfeng Power Plant to Handan Feng Power Plant, marking the official start of heat supply to Fengfeng Mining Area. Subsequently, other communities such as Ceramic Factory No. 1 and No. 2 also connected to Handan Feng Power Plant's heat source, covering over 500,000 square meters.![]()
On December 14th, Capital Company successfully issued its first 3 billion yuan corporate bonds, with a term of 5 years and a coupon rate of 4%. Amid the failure of five-year government bonds and primary agricultural development bonds to be issued and the market sentiment turning pessimistic, Capital Company ultimately achieved full issuance at a rate 20 basis points lower than bonds of the same rating on that day. This bond issuance marks a new breakthrough in the company's financing channels, which is of great significance for further strengthening its capital base, maintaining its position as a top financial holding company in the domestic industrial finance sector, and enhancing its sustainable development capabilities.![]()
On December 14th, Huaneng Group signed a strategic cooperation memorandum of understanding with General Electric (GE) at the company's headquarters. According to the memorandum, over the next three years, Huaneng will establish a regular communication mechanism with GE, strengthen personnel exchanges and training, actively develop efficient clean utilization of both renewable and traditional energy sources, explore industrial internet applications, share industry market insights, forward-looking technologies, and new technology application experiences, and enhance exchanges in management innovation, social responsibility, and corporate culture, leveraging their respective advantages to promote technological progress, achieve mutual benefit and win-win, and common development.![]()
On December 15, the Clean Energy Research Institute successfully completed the heat storage and heat exchange full-process experiments of the solar thermal power demonstration project at Sanya Nanshan Power Plant, achieving normal and stable nighttime steam production. The Nanshan solar thermal power demonstration project started construction in April 2012 and was put into operation on October 18, 2012. It is China's first project to produce superheated steam over 400°C using solar heat collection technology, reaching international advanced levels, with all equipment domestically produced. China Huaneng Group owns fully independent intellectual property rights.![]()
On December 19th, Huaneng Group held a Party Committee (Expanded) Meeting to convey the spirit of the Central Economic Work Conference, study the important speeches of General Secretary Xi Jinping and Premier Li Keqiang, and make deployment for implementing the conference spirit. The meeting emphasized that the group must firmly establish political awareness, overall awareness, core awareness, and alignment awareness, especially core and alignment awareness, and consciously maintain a high degree of consistency with the Party Central Committee with Comrade Xi Jinping at its core in thought, politics, and actions. The meeting also called for guidance by the spirit of the Central Economic Work Conference, adherence to the general tone of seeking progress while maintaining stability, and the implementation of new development concepts. It stressed the importance of improving development quality and efficiency, promoting supply-side structural reform, enhancing competitiveness, deepening comprehensive strict governance of the Party, and carefully planning next year's work.![]()
On December 21, Huaneng Group held a Party Committee (Expanded) Meeting to quickly convey the spirit of the Central Economic Work Conference, carefully study the important speeches of President Xi Jinping and Premier Li Keqiang at the meeting, and, in combination with work realities, make arrangements for further in-depth study and comprehensive implementation of the spirit of the Central Economic Work Conference.![]()
On December 24, Laiwu Power Plant's Unit 6 successfully completed 168 hours of full-load trial operation, marking the official commissioning of China Huaneng Group's and Shandong Province's first 1-million-kilowatt ultra-supercritical reheat unit. The unit adopts the world's most advanced secondary reheating technology, mainly increasing thermal cycle times to improve efficiency, making it the most efficient, lowest energy consumption, best performance, and environmentally friendly thermal power unit. During trial operation, the main auxiliary equipment operated safely and stably, and dust removal, desulfurization, denitrification environmental facilities, and main project were synchronized in operation. The sulfur dioxide, nitrogen oxides, and dust emission concentrations were 10, 15, and 1.5 mg per cubic meter, respectively, all better than the ultra-low emission standards of Shandong Province, achieving ultra-clean emissions.![]()
At 17:00 on December 25th, Henan Branch's Mianchi Cogeneration Project's Unit 2 successfully completed 168 hours of full-load trial operation, with both 350,000-kilowatt units fully put into operation. After commissioning, the project can generate 3.85 billion kWh of electricity annually, supply 5.96 million gigajoules of heat, and operate at a rated industrial steam extraction of 200 tons per hour. It can meet the heating needs of 9.7 million square meters of industrial and residential areas, replace over 100 scattered coal-fired small boilers locally, and has positive significance for energy saving, environmental protection, and promoting healthy local economic development.![]()
On December 27, China Huaneng's assistance project for Tibet's Changdu Mangkam County's off-grid power construction—the Huaneng Jueba Hydropower Station's first unit—successfully passed 72 hours of trial operation and was put into commercial operation. Located on the right bank of the Lancang River in Mangkam County, Changdu City, Tibet, the project includes three 10,000-kilowatt units with an annual generation of 147 million kWh, and a total investment of 925 million yuan. Unit 1 is the first to be commissioned within Tibet by Lancang River Corporation. The commissioning of the station has brought light to the long-term power shortage in the local Tibetan community, adding and improving electricity access for about 50,000 people, and providing strong energy support for local economic and social leapfrog development.![]()
China Huaneng Group Co., Ltd. convened the first expanded meeting of the 2018 Safety Production Committee to fully implement the spirit of the 19th National Congress of the Communist Party of China and the Central Economic Work Conference, summarize safety production work in 2017, analyze current safety production situation, and deploy key safety tasks for 2018.![]()
The National Science and Technology Awards Conference was grandly held at the Great Hall of the People in Beijing by the Central Committee of the Communist Party of China and the State Council. China Huaneng Clean Energy Technology Research Institute Co., Ltd. was awarded the First Class National Science and Technology Progress Award for its project 'Development, Research, and Engineering Demonstration of 600,000 kW Supercritical Circulating Fluidized Bed Boiler Technology'.![]()
Cao Peixi, Secretary of the Party Committee and Chairman of China Huaneng Group Co., Ltd., presided over the study meeting of the Party Leadership Group, which included pre-meeting special study on democratic life, focused on studying important speeches by General Secretary Xi Jinping at the opening of the seminar on studying and implementing the spirit of the 19th National Congress, chapters from 'Xi Jinping: The Governance of China' Volume II, important instructions by Xi Jinping on further correcting the 'Four Winds' and strengthening work style, and regulations on strengthening and maintaining the centralized and unified leadership of the Party Central Committee. The meeting also included discussions and exchanges based on practical work.![]()
The appointment announcement meeting for external directors of China Huaneng Group Co., Ltd. was held at the headquarters. The meeting announced the appointment of five external directors by the State-owned Assets Supervision and Administration Commission of the State Council, marking the formal establishment and operation of the company's board of directors. This was an important step towards establishing a modern state-owned enterprise system with Chinese characteristics and building a world-class enterprise with international competitiveness. The director of the Enterprise Administration Bureau of the SASAC, Song Yachen, presented appointment letters to the external directors, and Chairman Cao Peixi signed service contracts with them. Prior to the meeting, relevant officials from the bureau and the external directors had discussions on their appointments.![]()
The 4th Staff Representatives Conference and 2018 Work Conference of China Huaneng Group Co., Ltd. was held in Beijing. The meeting summarized the company's work since the 18th National Congress, analyzed current situations, and deployed work for 2018. The overall requirements for 2018 included fully implementing the spirit of the 19th National Congress, guided by Xi Jinping's Thought on Socialism with Chinese Characteristics for a New Era, and following the major deployments of the Party Central Committee's overall layout and strategic plans. The company aimed to ensure the achievement of annual performance goals, maintain industry leadership, accelerate the creation of a globally competitive world-class enterprise, and improve safety, operational performance, structural adjustments, capital operations, reform and innovation, and strict party governance. In 2017, the company achieved new results in safety, performance, restructuring, capital operations, reform, and strict governance, with a total power generation of 660.8 billion kWh, a domestic power generation of 649.6 billion kWh (up 6.4%), and a total revenue of 258.6 billion yuan (up 5.1%). The company's assets and liabilities ratio was 78.74%, down 3.75 percentage points from the beginning of the year. The company also made significant progress in overseas operations, with a total installed capacity of 17,182 MW, and increased the proportion of low-carbon clean energy to 31%.![]()
The Party Building Work Conference of China Huaneng Group Co., Ltd. was held in Beijing. The meeting fully implemented Xi Jinping's Thought on Socialism with Chinese Characteristics for a New Era and the spirit of the 19th National Congress, summarized the Party building work in 2017, and deployed key tasks for 2018. The meeting pointed out that the overall idea and requirements for the company's Party building in the current and future period were to fully implement the spirit of the 19th National Congress, guided by Xi Jinping's Thought on Socialism with Chinese Characteristics for a New Era, and to deepen the implementation of the Party building work at the national level for state-owned enterprises. It emphasized strengthening the Party's overall leadership, adhering to strict governance, serving production and operation, and improving political, ideological, organizational, work style, and disciplinary construction, with a focus on anti-corruption efforts to ensure the company's high-quality development and global competitiveness.![]()
China Huaneng Group Co., Ltd. held the 2018 Party Conduct and Clean Government Construction and Anti-Corruption Work Conference, thoroughly studying and implementing the spirit of the 19th National Congress of the Communist Party of China, the Second Plenary Session of the 19th Central Committee, and the Second Plenary Session of the 19th Central Commission for Discipline Inspection, implementing the deployment of the Central Enterprise Party Conduct and Clean Government Construction and Anti-Corruption Work Conference, summarizing the party conduct and clean government construction and anti-corruption work since the 18th National Congress, planning the work for 2018, and promoting the comprehensive and strict governance of the Party within the group company.![]()
The Party Committee of China Huaneng Group Co., Ltd. held the 2017 Democratic Life Meeting. The Secretary of the Party Committee and Chairman Cao Peixi made a self-examination report on behalf of the leadership team, focusing on six aspects to identify prominent issues, deeply analyzing the causes, and proposing clear rectification measures; members of the leadership team of the group company made individual self-examination speeches.![]()
The first meeting of the first Board of Directors of China Huaneng Group Co., Ltd. was held in Beijing, marking the start of the formal operation of the Board of Directors and taking an important step in building a modern enterprise system and improving corporate governance structure.![]()
Beijing Yuncheng Financial Information Service Co., Ltd. was listed in Beijing, marking the official realization of Huaneng’s 'Growth Treasure' company operation. At the launch ceremony, the 'Growth Treasure 4.0' version was released. Yuncheng Financial was jointly established by Capital Company, China People's Insurance Asset Management Co., Ltd., TUS-Science and Technology Service Co., Ltd., Yongcheng Property Insurance Co., Ltd., Great Wall Fund Management Co., Ltd., Shandong Xinneng Taishan Power Generation Co., Ltd., and YunYuan (Ningbo) Equity Investment Partnership. After its establishment, Yuncheng Financial will serve as a new development platform for Huaneng’s internet finance business, providing beneficial attempts and practices for state-owned enterprises to innovate in supply chain finance, technology finance, green finance, and inclusive finance.![]()
From 0 hours to 0 hours on February 21, the group's domestic power plants completed a total power generation of 9.686 billion kWh, 540 million kWh more than during the Spring Festival last year; coal production reached 1.115 million tons, an increase of 92,500 tons over the Spring Festival last year, successfully completing the 2018 Spring Festival power supply and heating work.![]()
China Huaneng Group Co., Ltd. held a meeting on the continued deepening of the central special inspection rectification deployment, further studying and implementing the spirit of the 19th National Congress of the Communist Party of China and the Second Plenary Session of the 19th Central Commission for Discipline Inspection, deeply studying and understanding General Secretary Xi Jinping's important instructions on inspection work, implementing the mobilization and deployment of the first round of inspections of the 19th Central Committee, and making specific arrangements for the group's continued deepening of the central special inspection rectification work.![]()
The UK Spalding OCGT (Open Cycle Gas Turbine with black start capability) project of International Power Company officially started construction, with a total installed capacity of 300,000 kW, a total investment of about 98 million pounds, and an expected commissioning in June 2019. This is the first new project developed and constructed by International Power Company in the UK since acquiring a 50% stake in the company, with a capacity contract for 15 years at 22.5 pounds/kW∙year, and is currently the only successful bidding and construction of a large new gas turbine project in the UK. The project completed financing in February 2018 and became the first large power generation project in the UK to rely on capacity contracts for project financing and development. The project will also provide black start services to the UK national grid, with high social benefits.![]()
The fourth plenary session of the first session of the 13th National Committee of the Chinese People's Political Consultative Conference was held at the Great Hall of the People, electing the chairman, vice-chairmen, secretary-general, and standing members of the 13th National Committee. Cao Peixi, Chairman and Party Secretary of China Huaneng Group Co., Ltd., was elected as a standing member of the 13th National Committee.![]()
Huaneng Guodu Hydropower Co., Ltd. changed its name to Tibet Kaidou Guodu Hydropower Co., Ltd. With this, Guodu completed 51% of the equity transfer, equity delivery, and industrial and commercial registration procedures. After the transfer, Huaneng Lancang River upstream hydropower Co., Ltd. holds 15% of the equity in Tibet Kaidou Guodu Hydropower Co., Ltd., which not only optimized the upstream company's asset structure but also improved asset quality and operational efficiency.![]()
According to the unified deployment of the Central Commission for Discipline Inspection, the Organization Department of the CPC Central Committee, and the leadership group for the theme education of 'Staying True to the Original Aspiration and Keeping the Mission in Mind,' China Huaneng Group held a special democratic life meeting on this theme, which was combined with the inspection rectification democratic life meeting. The meeting included a self-criticism and analysis by Shu Yinbiao on behalf of the leadership team, addressing issues based on the requirements of General Secretary Xi Jinping's 'Four Comparisons' and 'Four Searches,' and feedback from central inspections. The team clarified efforts and rectification measures in five areas: strengthening theoretical armament, implementing the decisions of the Party Central Committee, improving work style, consolidating 'two responsibilities,' and promoting high-quality development. All members conducted individual analysis and criticism, identifying root causes in thought, politics, style, ability, and integrity, and proposed specific, actionable rectification measures, engaging in serious criticism and self-criticism.![]()
China Huaneng Group Co., Ltd. signed a strategic cooperation agreement with China State Shipbuilding Corporation at the group's headquarters. According to the agreement, both parties will focus on wind power, offshore nuclear power, smart microgrids, distributed energy, and integrated energy services, based on mutual support, complementary advantages, equality, and mutual benefit, to carry out strategic cooperation.![]()
At China Huaneng Group's Weinan Thermal Power Project site, the group's developed infrastructure site safety risk control system, after long-term trial operation, was officially put into use. This is the first such system nationwide.![]()
At the 2019 Jack Cup International Welding Competition, China Huaneng Group's team won the group silver award. Cheng Ping from Texas Power Plant won the Special Award for New Equipment Innovation Performance; Zhang Lei from Shanghai Power Maintenance Company won second prize in the welding electrode arc welding; Wang Jinsui from Pingliang Power Plant won third prize in the welding electrode arc welding; Zou Tong from Qinling Power Plant won third prize in the youth group of welding electrode arc welding; Shao Gang from Dam Power Plant won third prize in oxy-acetylene gas welding; Ma Weimin from Yan'an Power Plant won third prize in combined welding.![]()
China Huaneng Group's Offshore Wind Power Technology R&D Center was officially established in Yancheng, Jiangsu Province. The center will conduct research on key offshore wind power technologies, establish a core-competitiveness design, manufacturing, construction, and operation and maintenance technology system, gradually build a national offshore wind power standard system with independent intellectual property rights, and form a first-class domestic and internationally advanced offshore wind power R&D center, providing technical support and demonstration for high-quality development of the offshore wind industry nationwide.![]()
China Huaneng Group held the first batch summary and second batch deployment meeting for the 'Staying True to the Original Aspiration and Keeping the Mission in Mind' thematic education in Beijing. The first batch of thematic education started in June. The Party Committee and secondary units' Party committees focused on thoroughly studying and implementing Xi Jinping's Thought on Socialism with Chinese Characteristics for a New Era, adhering to the general requirements of 'keeping the original aspiration, keeping the mission in mind, finding gaps, and implementing,' integrating learning, investigation, problem analysis, and rectification throughout, and achieving tangible results.![]()
Chen Yuhua, Secretary of the Party Leadership Group and Chairman of China Huaneng Group Co., Ltd., met with the Chairman of the Kazakhstan National Investment Corporation, Sattbayev Bauran, and his delegation at the group headquarters. The two sides exchanged views on leveraging their advantages, deepening the Belt and Road cooperation, and further strengthening energy sector collaboration.![]()
In the 2019 'Sichuan Miracle in the Hearts of Millions of Netizens' and the 70th anniversary of the founding of New China, China Huaneng Group's Gas River Cascade Hydropower Station ranked 9th in the 'Industry and Technology List' in the online voting for the Top Ten Sichuan Projects, and it is the only hydropower project listed.![]()
At the commendation conference for advanced collectives and model workers of central enterprises, Huaneng (Tianjin) Gasification Power Generation Co., Ltd. and four other units received the title of 'Advanced Collective of Central Enterprises,' and eight employees including Jin Jiancheng from Huateng Coal Industry Company were awarded the title of 'Model Workers of Central Enterprises'.![]()
China Huaneng Group Co., Ltd. and China National Nuclear Corporation signed a framework agreement for comprehensive deepening of strategic cooperation at the headquarters of CNNC. According to the agreement, both parties will cooperate in areas such as the construction of the Changjiang Nuclear Power Project in Hainan, development of new nuclear power plant sites, and technical services, based on the principles of complementarity and mutual benefit.![]()
Fitch, Moody’s, and S&P, three major international rating agencies, officially announced credit ratings of A, A2, and A- respectively for China Huaneng Group Co., Ltd., with a stable outlook. This was Huaneng's first participation in international ratings. Fitch and Moody’s ratings are only one notch below the sovereign rating, and S&P’s rating is two notches below, reflecting high recognition of the group's creditworthiness by international rating agencies.![]()
Huaneng Jiangsu Branch’s Taicang Power Plant’s coal and biomass coupling power generation project successfully completed 168 hours of trial operation. The project is a pilot for coal-biological power generation technology upgrade by the National Energy Administration and the Ministry of Ecology and Environment, and a key ecological infrastructure in Taicang. It adopts technology developed by Xi'an Thermal Engineering Institute, featuring low energy consumption and high utilization of carbonized products. After completion, it can process 200 tons of 80% water content and 60% wet sludge daily, with good social benefits.![]()
Huaneng Hulunbuir Company’s Baotou Clean Heating 50,000 kW wind power project’s first 3 MW wind turbine was connected to the grid and started power generation. The project uses 16 turbines of 3 MW each and 1 turbine of 2 MW, making it the first wind farm in Inner Mongolia to adopt 3 MW turbines in bulk.![]()
Hailar Thermal Power Plant Unit 2 successfully achieved zero output for heating with the low-pressure cylinder, marking the successful transformation of a 200,000 kW wet cooling unit in a high-latitude, extremely cold region. The transformation significantly improved peak regulation and heating capacity, reduced coal consumption during heating, and contributed to energy saving, emission reduction, and heating safety.![]()
The Dalat Photovoltaic Power Generation Leading Reward Incentive Base Project by Northern Company has started construction. Located in the southeast corner of Kubqi Desert Photovoltaic Base in Dalat Banner, it plans to build 100 MW in a 'forest-light complementary' mode. It is one of the third batch of photovoltaic incentive bases approved by the National Energy Administration in June 2019, a key project in the Kubqi Desert Economic Pilot Zone, and the only national third batch of photovoltaic leading incentive bases in Inner Mongolia.![]()
Chen Yuhua, Secretary of the Party Leadership Group and Chairman of China Huaneng Group Co., Ltd., presided over a study meeting of the Party Leadership Group to learn the important speeches of General Secretary Xi Jinping at the celebration of the 70th anniversary of the founding of the People's Republic of China and at the opening ceremony of the 2019 autumn semester of the Central Party School for young and middle-aged cadres, as well as the 'Regulations on Propaganda Work of the Communist Party of China' and related questions from the Central Propaganda Department. The meeting included discussions and exchanges based on learning and thinking.![]()
China Huaneng Group Co., Ltd. held the 2019 third quarter economic activity analysis meeting to summarize the work of the first three quarters, analyze the current situation, and mobilize efforts to complete the annual goals in the fourth quarter. In the first three quarters, the group completed 529 billion kWh of domestic power generation, with an 8.1% year-on-year increase in operating revenue. Key benefit indicators grew significantly above the central enterprise average. By the end of September, the overall coal consumption for power supply decreased by 0.71 g/kWh, 95.7% of coal-fired units achieved ultra-low emissions, and new energy projects' approval, construction, and grid connection capacity increased 3.9, 19.1, and 4.2 times respectively compared to the same period last year. The number of new patents reached 324, a record high.![]()
The 2019 Taiyuan Energy Low-Carbon Development Forum opened in Taiyuan, Shanxi. The theme was 'Energy Revolution and International Cooperation,' including an opening ceremony and summit forum, a World Energy Revolution Exhibition, and six sub-forums. China Huaneng Group participated in the World Energy Revolution Exhibition.![]()
China Huaneng Group Co., Ltd. held a leadership team (expanded) meeting. On behalf of the Central Organization Department, a responsible officer announced the decision of the central government on the appointment of the general manager of China Huaneng Group Co., Ltd.: Deng Jianling was appointed as director, general manager, and party secretary of China Huaneng Group.![]()
The 83rd IEC General Meeting concluded in Shanghai. During the meeting, Mr. Chen Yuhua, Chairman of China Huaneng Group Co., Ltd., and James Shannon, the current IEC President, completed the transition of the chairmanship and delivered inaugural speeches. Mr. Chen also participated in important activities such as the IEC Executive Committee, Young Expert Seminar, IEC Standards Copying and Licensing Agreement signing, and met with IEC treasurers and representatives from Singapore, Germany, and other countries.![]()
The head of the 12th Inspection Group for the Central 'Stay True to the Original Aspiration and Keep the Mission in Mind' Theme Education, Lu Chun, and his team visited China Huaneng Group Co., Ltd. to feedback on the research and supervision. Lu Chun fully affirmed the achievements of the first batch of theme education by the group and made requirements for the solid promotion of the second batch. Shu Yinbiao reported on the development of the second batch of theme education to the central supervision team.![]()
Jiuquan Wind Power Company completed the dynamic debugging of 23 Mingyang units for the 50,000 kW wind power parity grid-connected demonstration project at Ganhkou North, successfully connecting to the grid for power generation. This project is one of the first national parity grid-connected demonstration projects and the group's first parity project. Construction started on May 25, 2019, and full capacity grid connection was achieved on October 30.![]()
Huaneng Qin Coal Ruijin Power Generation Co., Ltd. was officially established, marking significant progress in the mixed-ownership reform between the group and Qin Coal Transportation and Sales Company.![]()
On November 6, Chairman of the International Electrotechnical Commission (IEC) and Chairman of China Huaneng Group Co., Ltd., Shu Yinbiao, attended the China-foreign Enterprise Cooperation Forum held in Shanghai by the State-owned Assets Supervision and Administration Commission of the State Council and delivered a speech. The forum's theme was 'Open Cooperation, Innovative Development'. It was one of the key activities of the second China International Import Expo. 15 central enterprises and international partners signed agreements. China Huaneng signed a supply agreement for 715 MW wind turbines for a wind farm in Puyang, Henan Province, with General Electric (GE). During the exhibition, 271 members from 26 units of China Huaneng signed 19 procurement agreements or contracts for high-end intelligent equipment and bulk commodities imported from the USA, France, Germany, the Netherlands, Austria, Russia, Japan, Indonesia, and other countries.![]()
On November 11, at the 2019 Annual Academic Conference of the China Engineering Dam Society and the 8th International Roller-Compacted Concrete Dam Symposium, China Huaneng Group's Huangdeng Hydropower Station won the 'International Milestone Project Award for Roller-Compacted Concrete Dams' and the 'First Prize for Scientific and Technological Progress from the China Dam Engineering Society' for technological breakthroughs in high-roller-compacted concrete dam design, digital construction throughout the process, and aquatic ecological protection technology systems. The International Milestone Project Award recognizes achievements in roller-compacted concrete dam technology and marks milestones in international dam engineering, jointly initiated by the China Dam Association and the Spanish National Dam Committee.![]()
On November 13, China Huaneng Group Co., Ltd.'s 'Key Technologies and Applications for High Flexibility Operation of Coal-Fired Units' won the first prize of the 2019 China Power Science and Technology Award. Developed independently by Xi'an Thermal Engineering Institute, this technology focuses on exploring the peak-shaving potential of units, requiring relatively minimal modifications and investments, to enhance operational flexibility, achieve zero output in the low-pressure cylinder of turbines, deep peak-shaving of boilers, and rapid load adjustments. The China Electrical Engineering Society's technical appraisal considers the project to have good economic and social benefits and promising application prospects, with results at an internationally advanced level.![]()
On November 15, China Huaneng Group Co., Ltd. signed a strategic cooperation framework agreement with the Xilin Gol League Administrative Office. According to the agreement, both parties will cooperate on clean energy base construction and other areas based on principles of equality, mutual benefit, complementary advantages, mutual support, and win-win cooperation. They will develop integrated multi-energy complementary pilot demonstration projects involving wind, solar, coal, power, and storage, aiming to build a world-class clean, green, safe, and efficient energy demonstration base and accelerate the modernization of the energy economy in Xilin Gol League.![]()
From November 16 to 18, at the China Enterprise Culture Research Association's 2019 Hefei Summit on Chinese and Foreign Enterprise Culture, China Huaneng Group Co., Ltd. was awarded the honor of 'Model Representative of Dedication and Professionalism in the Spirit of Chinese Enterprises over 70 Years of New China'. Yimin Coal and Electricity Company was awarded the 'Seventy Exemplary Cases of Enterprise Culture Construction over 70 Years of New China'. Huateng Coal Industry, Zazuo Company, Yangliuqing Thermal Power Plant, Yingkou Power Plant, Yingkou Thermal Power, Xindian Power Plant, and Nuozhadu Hydropower Station received the 'Excellent Units in Enterprise Culture Construction over 70 Years of New China'. New energy branch in Mengdong and Haimen Power Plant received the 'Outstanding Achievements in Enterprise Culture over 70 Years of New China'.![]()
On November 18, the construction projects of the seventh batch of Hainan Free Trade Pilot Zone were launched collectively. China Huaneng Group's controlled project, the Changjiang Nuclear Power Phase II, was one of the projects. A total of 129 projects with a total investment of 125.4 billion yuan were launched, the largest among the seven batches. The project is located in Tangxing Village, Haimen Town, Changjiang Li Autonomous County, Hainan Province, and plans to build two 'Hualong One' pressurized water reactors, each with a nominal capacity of about 1.2 million kilowatts, with a total investment of 39.45 billion yuan. The construction period for Units 3 and 4 is 60 months, with Unit 3 scheduled to be completed in 2025 and Unit 4 in 2026.![]()
On November 20, the first set of zero-discharge desulfurization wastewater devices in Northwest China was put into trial operation at Unit 2 of Tongchuan Zhaojin Power Plant. The device adopts a single furnace and tower layout with high-temperature bypass flue gas evaporation technology, with a desulfurization wastewater treatment capacity of 8 tons/hour, capable of meeting long-term full-load operation needs, achieving true zero wastewater discharge, and solving the problem of increasing chloride ions and decreasing desulfurization efficiency during desulfurization slurry operation. The technology supports the improvement of desulfurization gypsum quality. The rotating atomization high-temperature bypass flue gas evaporation technology used in this device saves about 50% of initial investment and reduces operation and maintenance costs by 70% compared to other desulfurization wastewater evaporation crystallization technologies, with advantages of stability, reliability, and simple maintenance.![]()
On November 23, Yichun Thermal Power Plant Units 1 and 2 successfully completed the low-pressure cylinder 'zero output' retrofit project. The plant's 'steam system process transformation to enhance heat supply unit power output regulation capability' project was fully completed, filling the domestic gap in the 'zero treatment' retrofit of low-pressure cylinders for similar cogeneration units. After the retrofit, the minimum electrical load of the 350,000 kW unit was reduced to 86,000 kW, steam extraction increased by 132.4 tons/hour, heat supply load increased by 91.3 MW, heat supply area increased by 14%, coal consumption for power supply decreased by about 35.31 grams per kWh, significantly improving the unit's peak regulation, heat supply capacity, and operational economy, with notable economic and social benefits.![]()
On November 27, Shu Yinbiao, Party Secretary and Chairman of China Huaneng Group Co., Ltd., met with Wu Gang, Chairman of Xinjiang Goldwind Science & Technology Co., Ltd. The two sides exchanged views on further strengthening cooperation. They will leverage their respective advantages, focus on the forefront of industry strategic development, continue to deepen cooperation in technological innovation, promote industrial internet construction, accelerate wind power industry standards research and formulation, promote industrial upgrading, and achieve mutual benefits.![]()
On November 29, the key project in Jiangxi Province—China Huaneng Group's Daguzhai Wind Farm—completed 240 hours of trial operation with 32 wind turbines and was put into commercial operation. The project is located in Guangchang County and Nanfeng County, Fuzhou City, Jiangxi Province, with a total installed capacity of 94 MW, consisting of 28 turbines of 3 MW each and 4 turbines of 2.5 MW each. The total investment is 746 million yuan. After commissioning, the annual power generation is expected to reach 191 million kWh, saving about 62,400 tons of standard coal annually, reducing carbon emissions by 161,600 tons, and reducing dust emissions by 22,000 tons.![]()
On November 29, the first biomass project independently invested and constructed within Huaneng Group—Jiyang Biomass Cogeneration Project—began construction. Located in Ranjia Village, Huihe Street, Jiyang District, Jinan City, Shandong Province, the project will build one 130-ton/hour high-temperature, high-pressure boiler and one 30,000 kW condensing steam turbine generator. The annual utilization hours are about 7,000 hours, with a planned heat supply area of approximately 1.26 million square meters and a total investment of about 430 million yuan. After completion, the project is expected to generate 210 million kWh annually, consume about 238,600 tons of straw, substitute 66,200 tons of standard coal, reduce CO2 emissions by over 170,000 tons, SO2 emissions by 483 tons, and bring significant ecological and economic benefits.![]()
On December 3, China Huaneng Group successfully priced and issued a $1.5 billion multi-year senior unsecured fixed-rate USD bond in London. The bond was guaranteed by the group and issued by its wholly owned overseas subsidiary, Huaneng Finance Holdings. The funds were managed by Huaneng Finance, the group's overseas funding platform. This issuance marks Huaneng's first bond issuance after obtaining international ratings, the first 10-year bond issued by Huaneng, and set records for the largest overseas USD bond issuance by a power generation group, as well as the lowest yield and narrowest spread for a 3-year USD bond by a Chinese enterprise this year.![]()
On December 3, China Huaneng Group's Qixia Sujiadian Wind Farm project of 50,000 kW began construction. The wind farm will install 20 turbines of 2.5 MW each, with an expected annual power generation of 101 million kWh, an average of 5.0425 million kWh per turbine, and an annual full-load equivalent hours of 2017 hours. The project will utilize local high-quality wind resources, improve the local power grid's predominantly thermal power structure, and provide clean renewable energy for Shandong's power grid.![]()
On December 5, the Mendi Battery Storage Project in the UK, developed by China Huaneng Group, officially broke ground. Located in Wiltshire, southwest UK, with a design capacity/energy of 100 MW/100 MWh, it uses lithium iron phosphate and ternary lithium battery technology. Co-funded by China Huaneng and Guoxin International, China Huaneng is responsible for construction and operation. Most equipment is manufactured and integrated by Chinese companies, with a domestic content exceeding 80%. The project is scheduled to be operational by the end of 2020. Once completed, it will be Europe's largest battery storage project, capable of providing emergency support during grid failures and effectively enhancing grid security.![]()
On December 5, Hebei Clean Energy Branch's Kangbao Phase II and III wind power projects successfully connected to the grid for the first time in 2019, becoming the first batch of grid-connected power generation projects in Jibei Power Grid in 2019 and the first wind power projects in Zhangjiakou area in 2019. The projects installed 44 turbines of 2.2 MW each, with a total capacity of 96.8 MW, a total investment of 740 million yuan, and an annual grid-connected power of 300 million kWh. After commissioning, they will save about 84,000 tons of standard coal annually, reduce CO2 emissions by 250,000 tons, and reduce SO2 emissions by 195 tons.![]()
On December 9, China Huaneng Group signed a 'Deepening Cooperation on Clean Energy Development in Tibet' agreement with the Tibet Autonomous Region government at the group's headquarters. According to the agreement, both sides will adhere to the principles of 'equality and mutual benefit, advantage complementarity, current focus, and long-term vision,' accelerate the development of the upstream Lancang River Tibet water and solar hybrid clean energy base and the Yajiang midstream hydropower projects, jointly promote the preliminary work of hydropower in the lower Yajiang River, and vigorously develop Tibet's clean energy industry.![]()
On December 16th, China Huaneng Group Co., Ltd. Party Secretary and Chairman Shu Yinbiao presided over a party group meeting to convey and study the spirit of the Central Economic Work Conference and research implementation measures. The meeting required all units to resolutely unify their thoughts and actions with the decisions and deployments of the Party Central Committee, further enhance the 'Four Consciousnesses', strengthen the 'Four Self-confidences', achieve the 'Two Maintenances', adhere to the general tone of steady progress, uphold the new development philosophy, and implement the 'Eight-character' supply-side structural reform policy. The focus was on doing well their own work, promoting the 'Six New Improvements' and 'Two Major Breakthroughs', and solving prominent issues faced by the company.![]()
On December 17th, China Huaneng Group Co., Ltd. held the 2019 annual secondary unit Party Committee Secretary performance review meeting in Beijing. The meeting included on-site reports from the Party secretaries of 10 secondary units, including Nuclear Power Company, North China Branch, Shanxi Branch, Jiangsu Branch, Zhejiang Branch, Qinghai Branch, Sichuan Company, Shaanxi Company, Ningxia Company, and Gansu Company, on their performance, main issues and causes, future work ideas, and major measures. Forty secondary units' Party secretaries submitted written reports.![]()
China Huaneng Group Co., Ltd. held a Party Building Work Meeting in Beijing, summarizing the Party's building work in 2021 and arranging work for 2022. The meeting called for strengthening the Party's political construction, deepening propaganda and ideological work, carrying out the "Party Building Leading Deepening Year" special action, strengthening the "Three Basics" construction, strengthening cadre and talent development, enhancing Party conduct, integrity, and anti-corruption work, strengthening united front and mass organization work, and building a strong synergy for high-quality development.![]()
The Party Committee of China Huaneng Group Co., Ltd. held a special democratic life meeting on Party history study and education. At the meeting, Shu Yinbiao reported on the preparation status, solicitation of opinions, and implementation of corrective measures from the previous year's democratic life meeting, and conducted a comparative inspection on behalf of the leadership team, carefully identifying prominent issues, deeply analyzing causes, and clarifying corrective measures. Subsequently, Party Committee members individually examined their own problems, closely linked to personal thoughts, study, and work realities, analyzed root causes, clarified improvement directions and measures, and carried out criticism and self-criticism.![]()
The "China Energy Valley" (Launch Zone) project began construction in Nanjing. The project is a joint effort between China Huaneng and the Nanjing Municipal Government, located in the Qilin District of Nanjing, with a total investment of about 30 billion yuan and a built-up area of approximately 1.6 million square meters. The project aims to build an entire industry chain cluster in the energy sector, creating an industrial ecosystem that integrates technology R&D, capital incubation, demonstration applications, and mechanism innovation, and establishing an internationally influential "energy technology source, energy production and research innovation park, energy application demonstration zone, and low‑carbon smart future city".![]()
The international standard "Guidelines for Metal Corrosion Protection During Disinfectant Use" (ISO TR 7655:2022), led by Huaneng, has been officially released, filling a gap in international standards for disinfectant corrosion and marking another major breakthrough for Huaneng in international standardization.![]()
The largest-capacity Huaneng Nut Valley Coal Mine in Gansu Province has been commissioned. The mine is located in Qingyang City, Gansu Province, and is part of Huaneng's Longdong Multi-energy Complementary Integrated Energy Base.![]()
China Huaneng Group Co., Ltd. held a first-quarter economic activity analysis meeting. The meeting noted that in the first quarter, the company's overall safety production was stable, the pace of green transformation accelerated, operating performance exceeded expectations, technological innovation progressed deeply, corporate reforms deepened continuously, and Party building continued to strengthen.![]()
China Huaneng Group Co., Ltd.'s 100,000 kW Hunan Jiangkou wind project completed full-capacity grid connection.![]()
China Huaneng Group Co., Ltd. held a concentrated start-up ceremony for new energy projects in Q2 2022, with more than 13 million kW of new energy projects achieving actual construction and construction preparation, of which nearly 6 million kW were actually started. A total of 155 new energy projects were simultaneously started and prepared for construction, covering 24 provinces nationwide, focusing on advancing the North Line Clean Energy Base, East Line Offshore Wind Base, Southwest "Wind, Solar, Water, Storage" Integrated Base, and the construction and development of central and eastern photovoltaic projects.![]()
The All-China Federation of Trade Unions announced the 2022 National May Day Labor Award and National Worker Pioneer List. China Huaneng had 10 collectives and individuals listed, including 3 collectives receiving the National May Day Labor Award certificate, 4 individuals receiving the National May Day Labor Medal, and 3 collectives receiving the National Worker Pioneer title.![]()
The Central Rural Work Leading Group reported the 2021 assessment of central unit targeted assistance performance. China Huaneng Group Co., Ltd. received the highest rating, ranking in the top 30% among central enterprises and first among comparable energy enterprises.![]()
China Huaneng successfully issued its first 2 billion yuan low-carbon transformation-linked bond on the exchange market.![]()
The Jiangsu Jintan Salt Cave Compressed Air Energy Storage National Pilot Project has been commissioned. It is China's only national demonstration project in the compressed air storage field and the world's first non-fuel-supplemented compressed air storage power plant. The project was jointly developed by China Huaneng, China Salt Group, and Tsinghua University, with all main system equipment being the first domestic set, marking a qualitative leap of China's compressed air storage technology from "theoretical experiment" to "engineering application." After commissioning, the project can provide 60 MW of peak-shaving capacity to the local grid, store 300,000 kWh per cycle, and add approximately 100 million kWh of peak-shaving capacity annually. The long-term plan is 1 million kW, aiming to build a large-scale clean physical storage base in China.![]()
In Yaan City, Sichuan Province, Luoshan County and Baoxing County experienced 6.1 and 4.5 magnitude earthquakes respectively. Huaneng Sichuan Company actively responded to risks such as tailwater backflow, carried out rescue and disaster relief, quickly inspected safety hazards across all hydropower stations, and gradually restored power supply. On September 5, a 6.8 magnitude earthquake struck Luding County, Garzê Prefecture, Sichuan Province. Huaneng Sichuan Company conducted a comprehensive inspection immediately, assessed damage, ensured normal and safe production, and provided stable and reliable power support for earthquake relief.![]()
The key power supply project in Liaoning Province—Huaneng Dalian Thermal Power Plant Unit 3—entered commercial operation. On December 7, Unit 4 entered operation. Thus, all four coal-fired units at the plant have been fully commissioned.![]()
China Huaneng Group Co., Ltd. successfully issued the 16th issue of 2 billion yuan ultra-short-term financing bills in 2022. The low-cost funds raised will be used to secure financial safety for coal power supply guarantees and support coal power enterprises in maintaining stable generation during peak summer periods.![]()
The Cambodia Sang River Second-Stage Hydropower Plant, built and operated by China Huaneng, held a "Cloud Open Day" event themed "Happiness Blooms Forward".![]()
China Huaneng Construction Operation and Maintenance's first wind-solar-storage integration project in Gansu—Anbei Wind and Solar Storage Integration Project—has been connected to the grid in Jiuquan. The project is located in Guazhou County, Jiuquan City, Gansu Province, with 200,000 kW wind power, 50,000 kW photovoltaic, and 10,000 kW/20,000 kWh energy storage. After commissioning, the expected annual total power generation is 68,997 million kWh. The completion and operation of this project fill gaps in Gansu's wind and solar storage, remote supervision, and smart operation and maintenance in the new energy sector, significantly reducing operation and maintenance costs for new energy projects, and providing technology reserves and experience for Huaneng's Longdong and Hexi two major 'Three Types and Three Transformations' energy bases.![]()
China Huaneng Group Co., Ltd. received a 'Double A' rating in the annual and term evaluations by the State-Owned Assets Supervision and Administration Commission, achieving 'five firsts' in operating benefits, technological innovation, bonus points, annual ranking, and term ranking among similar power generation enterprises.![]()
The State-owned Assets Supervision and Administration Commission released the 2021 reform three-year action key task assessment results, and China Huaneng Group Co., Ltd. was rated as a reform Grade A enterprise.![]()
The State-owned Assets Supervision and Administration Commission released the 2021 patent quality evaluation results for central enterprises, ranking China Huaneng Group Co., Ltd. 23rd, entering the A category for the first time, and being the only enterprise in the power generation industry among central enterprises to reach this level.![]()
The first fully domestic excitation system for thermal power units, led by China Huaneng Group Co., Ltd., has been successfully put into operation at Huaneng Jiutai Power Plant.![]()
The first large pressurized water reactor nuclear power plant built by China Huaneng—Huaneng Hainan Changjiang Nuclear Power Phase II Project—has officially started construction of the nuclear island for Unit 3. The project, owned by China Huaneng, plans to build two 1.2 million kW nuclear units, Units 3 and 4, both using the independently developed 'Hualong One' technology. It is China's first nuclear project to start during the 14th Five-Year Plan, and the largest energy investment project in Hainan Free Trade Port, serving as a pillar power source for Hainan's clean energy island. The total investment is estimated at 36.85 billion yuan, with a construction period of 60 months, and full commissioning planned for early 2027.![]()
The world's largest single-machine capacity high-voltage direct-hung battery energy storage system, developed by Huaneng Clean Energy Technology Research Institute, has been launched in Guangzhou. The '35 kV 20 MW/40 MWh high-voltage direct-hung battery energy storage system' achieves direct connection to the 35 kV grid without transformers, with a single-machine capacity far exceeding global peers, and an expected charge-discharge cycle efficiency of over 91%.![]()
China Huaneng Group Co., Ltd. has signed a strategic cooperation framework agreement with Baoding Municipal Government. According to the agreement, both parties will cooperate on clean energy development, high-tech industries, and other fields, developing demonstration bases for wind, solar, and energy storage with a capacity of tens of gigawatts, supporting Baoding's high-quality development.![]()
China Huaneng Group Co., Ltd. held its 2022 mid-year work conference. In the first half of the year, the company effectively ensured energy supply, maintained overall safety stability, accelerated green and low-carbon transformation, achieved significant technological innovation, improved quality and efficiency, deepened enterprise reform, strengthened party building, and made new strides in high-quality development. In the second half, the company will carry out the 20th National Congress safety assurance special actions, ensure energy supply, accelerate green and low-carbon development, promote technological innovation, improve quality and efficiency, and strive to win the three-year state-owned enterprise reform battle, continuously strengthen party building, and welcome the 20th National Congress with excellent results.![]()
As of August 3, Beijing time, the latest Fortune Global 500 list was released, ranking China Huaneng 215th, a jump of 33 places from last year.![]()
China Huaneng and Nanjing Municipal Government jointly established the Low-Carbon City Research Institute.![]()
The 2022 International Standardization Conference themed 'International Standardization Supporting Carbon Peaking and Carbon Neutrality' opened in Nanjing. During the opening ceremony, IEC's first branch in China—the IEC International Standards Promotion Center (Nanjing)—was officially established.![]()
The 'Perceive Lancang River, Talk about Lancang-Mekong Friendship' Lancang River youth visit activity, jointly organized by China Huaneng Group Co., Ltd., Lancang-Mekong Water Resources Cooperation Center, Yunnan Provincial People's Government Foreign Affairs Office, and Huaneng Lancang River Hydropower Co., Ltd., was held in Yunnan.![]()
China Huaneng Group Co., Ltd. signed a strategic cooperation framework agreement with the Inner Mongolia Autonomous Region government in Hohhot. According to the agreement, China Huaneng will deepen cooperation with Inner Mongolia in new energy transmission bases, wind-solar-hydrogen storage, and integrated energy industries. The Inner Mongolia government supports Huaneng's development in the region, and both parties will explore solutions and pathways for high renewable energy absorption and low-carbon industry transformation, implementing the strategic positioning and action plan set by General Secretary Xi Jinping for Inner Mongolia.![]()
Huaneng Gansu Jiuquan Wind Power Company completed the international green certificate delivery with Huaneng International Singapore Toh Tuck Energy Retail Company, with a volume of 10,000 green certificates (corresponding to 10 million kWh of electricity). This is Huaneng's first international green certificate sales for renewable energy.![]()
The power infrastructure network security innovation consortium led by China Huaneng was established in Beijing.![]()
The 3rd and 4th units (30 MW/30 MWh) of China Huaneng Yuhuan Power Plant's electrochemical energy storage frequency regulation project were successfully integrated into the plant's 6 kV system for the first time, marking Huaneng's first megawatt-scale energy storage frequency regulation project, the largest capacity during the 14th Five-Year Plan period in Zhejiang Province, and the first megawatt-scale power-side energy storage frequency regulation project successfully connected to the grid.![]()
Shu Yinbiao, Secretary of the Party Leadership Group and Chairman of China Huaneng Group Co., Ltd., was invited to attend the opening ceremony of the 2nd Jiangsu Development Conference and the 1st Global Su Business Conference held in Nanjing, and to deliver a speech. He proposed to build a world-leading 10-million-kilowatt offshore wind power base, establish a clean, low-carbon, green, and efficient energy supply pattern in Jiangsu, and help Jiangsu achieve high-quality development and lead the country.![]()
China Huaneng Group's Ulonglong Hydropower Station successfully extracted a 240mm diameter, 25.9-meter-long core sample of the world's longest tertiary-grade compacted concrete from Dam No. 5, marking that the dam's concrete construction quality and process have reached an internationally leading level.![]()
Shu Yinbiao, Secretary of the Party Leadership Group and Chairman of China Huaneng Group Co., Ltd., presided over the Party Group meeting to convey and study the spirit of the central 'Stay True to the Original Aspiration and Keep the Mission Firmly in Mind' thematic education work conference, and to research and implement related opinions. He conveyed the important speech of General Secretary Xi Jinping at the thematic education work conference and the requirements of Comrade Wang Huning, and made arrangements for the company's in-depth implementation of thematic education. The meeting reviewed and approved documents such as the 'Implementation Plan for the 'Stay True to the Original Aspiration and Keep the Mission in Mind' Thematic Education of China Huaneng Group Co., Ltd.![]()
China Huaneng Group Co., Ltd. held a mobilization meeting in Beijing for the 'Stay True to the Original Aspiration and Keep the Mission in Mind' thematic education, to learn and convey General Secretary Xi Jinping's important speech at the thematic education work conference, and to deploy the company's thematic education activities. Deputy Leader of the Central 30 Guidance Group Xiao Zonghui and all members of the guidance group, as well as relevant members of the Central Eighth Inspection Team, attended the meeting. Shu Yinbiao emphasized that the company's system should integrate learning, investigation, problem inspection, and rectification throughout the entire process of thematic education.![]()
China Huaneng Group's '2018 Sustainable Development Report' was officially released. This is the 13th report issued by the group since it took the lead in publishing a sustainable development report among domestic power generation companies in 2006. The report was rated as the highest five-star level by the China Corporate Social Responsibility Report Rating Expert Committee, and it is the only report among domestic power generation companies to receive five-star ratings for eight consecutive years.![]()
Huaneng Nuclear Power Development Co., Ltd. and China Nuclear Energy Power Co., Ltd. signed an investment agreement. According to the agreement, both parties will jointly invest in the development, construction, and operation management of two 'Hualong One' pressurized water reactor units for the Huaneng Hainan Changjiang Nuclear Power Phase II Project. Huaneng Hainan Changjiang Nuclear Power Co., Ltd. will be the main investor, builder, and operator of the project. This is another fruitful result of deepening cooperation between Huaneng Group and China National Nuclear Corporation, marking a new breakthrough for Huaneng in controlling and constructing pressurized water reactor projects.![]()
China Huaneng Group Co., Ltd. held a special warning education conference in Beijing to implement the requirements of the Eighth Central Inspection Team, report on the company's self-inspection and correction of issues violating the spirit of the Eighth Central Regulations, and typical cases of violations and discipline. The conference aimed to educate and guide all party members and cadres to learn from cases and exercise self-discipline, and to deploy the company's comprehensive deepening of work style rectification, promoting the new achievements of inspection rectification to advance the comprehensive and strict governance of the party.![]()
Shu Yinbiao, Secretary of the Party Leadership Group and Chairman of China Huaneng Group Co., Ltd., met with Yu Weifen, Vice President of the Hong Kong Monetary Authority and President of the Foreign Exchange Fund Investment Office, at the company's headquarters. The two sides exchanged views on giving full play to their respective advantages, further strengthening financial cooperation in the energy field, supporting the construction of Hong Kong as an international financial center, and jointly promoting high-quality development of the 'Belt and Road' initiative.![]()
Shu Yinbiao, Secretary of the Party Leadership Group and Chairman of China Huaneng Group Co., Ltd., presided over the Party Group Central Study Meeting to further study the important speech of General Secretary Xi Jinping at the central 'Stay True to the Original Aspiration and Keep the Mission in Mind' thematic education work conference, study relevant content of the 'Outline of Xi Jinping's Thought on Socialism with Chinese Characteristics for a New Era,' and Xi Jinping's important expositions on 'Stay True to the Original Aspiration and Keep the Mission in Mind.' The meeting included exchanges and discussions based on learning, thinking, and work practice.![]()
Shu Yinbiao, the prospective Chairman of IEC and Chairman of China Huaneng Group Co., Ltd., met with Seemoor Anzog, Chairman of the IEC Swiss National Committee and CEO of Brugg Cable Company, in Zurich. The two sides exchanged views on further strengthening China-Switzerland technical exchanges and cooperation, and playing a role in international standards. From June 18 to 21, Shu Yinbiao attended a series of high-level management meetings including the IEC Conformity Assessment Board, Executive Committee, and Council in Geneva, listening to reports from the Secretary-General, financial reports, the implementation of the new overall plan of IEC, and the preparations for the 83rd IEC General Meeting. Discussions were held on IEC strategy formulation and reform governance, and he participated in the interview for selecting the next IEC Secretary-General.![]()
From June 18 to 21, Shu Yinbiao attended a series of high-level management meetings including the IEC Conformity Assessment Board, Executive Committee, and Council in Geneva. He listened to reports from the Secretary-General, financial reports, the implementation of the new overall plan of IEC, and the preparations for the 83rd IEC General Meeting. Discussions were held on IEC strategy formulation and reform governance, and he participated in the interview for selecting the next IEC Secretary-General.![]()
The State-owned Assets Supervision and Administration Commission Party Committee held a celebration for the 98th anniversary of the founding of the Communist Party of China and the 'Two Excellent and One First' commendation conference for central enterprises. Awards were given to winners of the 'Two Excellent and One First' awards in central enterprises. Huaneng New Energy's Zheng Yongkai, Xi'an Thermal Power Institute's Deputy Director of Chemistry Department Tian Li (female), and Zhalainuoer Coal Industry's Wu Ningrong received the title of 'Outstanding Communist Party Member of Central Enterprises'; Dala Te Power Plant Auxiliary Machine Maintenance Party Branch Secretary Zhao Zhigang and Xindian Power Plant Fuel Department Party Branch Secretary Shi Changyong of Huaneng Shandong Branch received the title of 'Outstanding Party Worker of Central Enterprises'; and the Party Committees of Huaneng (Suzhou Industrial Park) Power Generation Company, Shaanxi Copper Industry Co., Ltd., and Lancangjiang Power Plant were awarded the title of 'Advanced Grassroots Party Organizations of Central Enterprises'.![]()
The 2019 Hunan and Central Enterprise Cooperation Conference was held in Changsha. China Huaneng Group Co., Ltd. signed a strategic cooperation agreement with the Hunan Provincial People's Government. According to the agreement, both parties will carry out comprehensive cooperation in the development of new energy in Hunan, optimization of thermal power development, and energy projects in impoverished areas.![]()
China Huaneng Group Co., Ltd. New Energy Demonstration Benchmark Project - Texas Dingzhuang Wind Power Project officially starts construction. The project was approved on December 8, 2017, with a total planned capacity of 100,000 kilowatts. A new 220 kV booster station is being built, and 25 wind turbines of 4 MW each are currently the highest power class for low wind speed onshore plains wind farms. The project also adopts innovative technologies such as remote centralized control, intelligent perception, and smart decision-making. Once completed, it is expected to provide 220 million kWh of clean energy annually, saving 72,000 tons of standard coal.![]()
The UK Spalding 300,000 kW OCGT (Open Cycle Gas Turbine with black start capability) project by International Power has been successfully commissioned. This is the UK's first large-scale power generation project financed and developed through capacity contracts, and the largest gas-fired power project commissioned in the UK in nearly six years. Construction began in March 2018.![]()
The Youth Innovation Team of Xi'an Thermal Engineering Institute first proposed a black start technology route for rooftop photovoltaic and storage wind farms, filling a technical gap in the field of new energy black start. This provides technical reference for new energy participating in grid black start. The technology uses new energy sources such as wind and solar as supplementary black start power supplies, effectively alleviating the safety pressure caused by large-scale power outages, improving regional grid recovery capacity, and broadening the application prospects of new energy power generation. It also opens a new path for establishing friendly grid new energy generators.![]()
China Huaneng Group Co., Ltd. held a ceremony for Academician Ma Hongqi receiving the Lifetime Achievement Award from the International Dam Committee. The group's Party Secretary and Chairman, Shu Yinbiao, presented the medal to Academician Ma Hongqi, and Ji Yong, Chairman of the China Dam Engineering Society, presented the certificate. Vice President of the Chinese Academy of Engineering and Academician, He Huawu; Deputy Director of Tsinghua University Council and Vice President of the Alumni Association, Shi Zongkai; Academician of the Chinese Academy of Engineering and Chairman of the Tsinghua University Academic Committee, Nie Jianguo; and Dean of the School of Civil Engineering and Water Conservancy at Tsinghua University, Zhang Jianmin, attended the ceremony.![]()
The 100-day countdown press conference for the 83rd International Electrotechnical Commission (IEC) Conference was held in Beijing. IEC President-elect and China Huaneng Group Chairman, Shu Yinbiao; Deputy Director of the State Market Supervision Administration and Director of the National Standards Committee, Tian Shihong; Director of the Shanghai Market Supervision Bureau, Chen Xuejun; and Ms. Ge Boruiella, Publicity Officer of the IEC Central Office, attended and answered questions from reporters.![]()
At the 16th Pakistan National Environment and Health Forum (NFEH) 'Annual Environmental Excellence Award' ceremony, China Huaneng Group's Shandong Ruyi Sahiwal Coal Power Plant was awarded the 'Annual Environmental Excellence Award' in the power and energy category.![]()
The 'State-Owned Enterprise Open Day' observation and promotion activities, jointly hosted by the Propaganda Bureau of the State-owned Assets Supervision and Administration Commission of the State Council and China Huaneng Group, were successfully held in Jingmen, Hubei. The theme was 'Practicing the Mission of the Three Colors and Contributing to Clean Energy.' Nearly 200 people, including central enterprise representatives, media, citizens, and students, visited Huaneng Jingmen Thermal Power Plant to learn about Huaneng's development history, experience the 'Three Colors' corporate culture, study energy and power knowledge, and witness the vivid practice of Huaneng's contribution to clean energy.![]()
China Huaneng Group Co., Ltd. held a counseling report meeting on learning and implementing the spirit of the 19th CPC Central Committee Fourth Plenary Session. The group’s Party Secretary and Chairman Shu Yinbiao gave the counseling report. The meeting required to unswervingly promote the company to become stronger, better, and bigger, vigorously promote green development, advance institutional and mechanism reform, supply-side structural reform, accelerate the transformation to comprehensive energy services, continuously improve the scientific and technological innovation management system, guarantee mechanisms, and achievement transformation mechanisms, accelerate the 'going out' pace, and form a new pattern of international development of the group.![]()
China Huaneng Group Co., Ltd. Heze Dongming Wind Power Project with a capacity of 80,000 kW has started construction. The project is located in Dongming County, Heze City, Shandong Province, within Dongming, Liulou, and Shawo Towns, and plans to build 16 single machines of 3 MW capacity and 10 single machines of 3.2 MW capacity wind turbines. After completion, the project is expected to generate 180 million kWh annually, save 51,100 tons of standard coal, reduce sulfur dioxide emissions by about 530 tons, nitrogen oxides by about 480 tons, carbon dioxide by about 148,000 tons, and ash by about 14,600 tons, with significant energy saving and emission reduction benefits.![]()
The IEC/TC5 Secretariat of the International Electrotechnical Commission Turbine Technology Committee is located at Xi'an Thermal Power Research Institute, which is the first time the IEC technical committee secretariat has been located at Huaneng. Huaneng attaches great importance to international standardization work, establishing a standardization technology department at Xi'an Thermal Power Research Institute, actively engaging in work exchanges and professional docking with international and national standardization committees, formulating standardization management systems, cultivating standardization talents, and building an 'International Standard Expert Database,' making breakthroughs in standardization work.![]()
The National Standardization Administration issued an announcement approving the establishment of the first batch of National Standard Verification Points. China Huaneng's Xi'an Thermal Engineering Institute became one of the 38 units selected as National Standard Verification Points for thermal power units, and the only approved unit in the thermal power industry.![]()
The results of the 30th National Enterprise Management Modernization Innovation Awards and the 2023 Power Innovation Awards were announced. China Huaneng received 25 award-winning management achievements, ranking first among state-owned power enterprises in terms of quality and quantity.![]()
The meeting emphasized that 2024 marks the 75th anniversary of the founding of the People's Republic of China, a pivotal year for implementing the 14th Five‑Year Plan, and the 10th anniversary of General Secretary Xi Jinping's new energy security strategy of "Four Revolutions, One Cooperation." It is of great significance to carry out all work. The company system must adhere to Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era, fully implement the spirit of the 20th National Congress, carry out the directives of the Central Economic Work Conference, and fulfill the requirements of the Central Enterprise Leaders' Meeting. It must uphold the Party's comprehensive leadership over state‑owned enterprises, maintain the overall tone of steady progress, be guided by the new development concept, the new energy security strategy, supported by technological innovation, and driven by deepening reform. The company should seize opportunities, act proactively, and reach new heights. It should focus on fulfilling the new mission, advancing the new journey, achieving new leadership, and accelerating the construction of a world‑class enterprise. Key work areas include ensuring energy security and supply, independent innovation, new industrial development, green low‑carbon transformation, operational efficiency, and reform deepening. The company will continue to achieve new results in high‑quality development and make greater contributions to advancing national strength and national rejuvenation through Chinese‑style modernization.![]()
The meeting reported the final assessment of the national blockchain innovation application pilot. The "Blockchain‑based Energy Industry Smart Supply Chain Service Platform" project, led by China Huaneng and built by Shanghai Huaneng E‑commerce Company, was rated "Excellent" in the "Blockchain + Energy" specialty area, becoming the only project in the power generation industry to receive this title.![]()
China Huaneng Group Co., Ltd. convened a summary meeting on the theme education of Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era, conveying and studying General Secretary Xi Jinping's important speech on theme education, fully implementing the spirit of the central theme education summary meeting, summarizing the company's theme education activities, and making arrangements to consolidate and expand the results.![]()
China Huaneng Group Co., Ltd. held a study and discussion meeting of the Party Committee's theoretical learning center group, focusing on General Secretary Xi Jinping's important remarks on new productive forces. The meeting pointed out that Xi's speech during the 11th collective study of the Politburo is an innovative development and significant extension of Marxist productive force theory, and the latest achievement of Xi's economic thought, providing an action guide for solidly promoting high‑quality development in the new journey of national rejuvenation. The company must fully understand the background and significance of new productive forces, deeply grasp its key characteristics and contemporary connotations, accurately grasp the logical relationship between new productive forces and high‑quality development, and effectively use this advanced productive force theory to guide Huaneng's high‑quality development practice.![]()
China Huaneng Group Co., Ltd. convened the 2024 New Energy Project Construction Promotion Meeting. These newly started projects focus on large‑scale base‑type development, emphasize deepening the "three lines and one belt" layout, and implement the "four‑fold" development model: advancing integrated wind, solar, thermal, and storage in the north; diversified smart energy of wind and nuclear along the eastern coast; integrated water, wind, and solar in the southwest; and multi‑scenario integration of wind, solar, hydro, and storage in the central and eastern regions.![]()
China Huaneng Group Co., Ltd. held a Cadre and Talent Work Meeting. The meeting adhered to Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era, deeply studied and implemented the spirit of the 20th National Congress and General Secretary Xi's new concepts, thoughts, and strategies on cadre and talent work, fully practiced the overall requirements of party building in the new era and the new party organization line, and carefully implemented the central talent work meeting and national organization work meeting deployments. It summarized the company's recent experience in cadre and talent work, based on the new mission and positioning of state-owned enterprises in the new era and new journey, and studied and arranged cadre and talent work for the current and future period.![]()
The Huaneng High‑Temperature Reactor Technology Research Center officially commenced operations in Rongcheng, Shandong, marking a new milestone in the group's high‑temperature reactor industry technology innovation. The launch of the center is an important step in implementing the group's dual‑drive nuclear power development strategy and accelerating high‑temperature reactor technology innovation, and a key measure to further strengthen the nuclear power technology support platform.![]()
Chairman Wen Shugang, Chairman and Party Committee Secretary of China Huaneng Group Co., Ltd., was invited to attend the 2024 China Development Forum Annual Meeting on Carbon Neutrality and Global Climate Governance. He delivered a speech titled "Accelerating Energy Low‑Carbon Transition to Support Global Climate Governance."![]()
The Huaneng Shidaowan High‑Temperature Gas‑Cooled Reactor Demonstration Project's nuclear heating project officially connected to the grid, marking the first time the fourth‑generation nuclear heating system provides heating to urban residents, achieving a breakthrough in the comprehensive utilization of fourth‑generation nuclear power.![]()
China Huaneng Group Co., Ltd. convened a Party Committee special meeting, deeply studied and implemented General Secretary Xi Jinping's important speeches and directives on Party discipline education, conveyed and studied the "Notice of the General Office of the Central Committee on Conducting Party Discipline Education Across the Party," and implemented the State-owned Assets Supervision and Administration Commission Party Committee's requirements, arranging the conduct of Party discipline education.![]()
China Huaneng Group Co., Ltd. signed a Strategic Cooperation Framework Agreement with the People's Government of Shanxi Province in Taiyuan. According to the agreement, the parties will cooperate in multiple fields, including promoting clean energy base construction, integrating coal‑electricity and new energy, smart integrated energy services, and pumped‑storage and new storage technologies.![]()
Huaneng Clean Energy Research Institute showcased its advanced CCUS technology at the 49th Geneva International Invention Exhibition. Its self‑developed "CO₂ capture solution regeneration system and method" stood out among 1,053 patents and won the Geneva International Invention Gold Award. This award is Huaneng's first international gold award in the field of intellectual property, marking a breakthrough in achieving zero international invention awards.![]()
The China Dam Engineering Society organized a consultation meeting to evaluate the scientific and technological achievements of the refined intelligent vibration control technology for deep cover layer foundation treatment. An appraisal panel composed of academicians from the Chinese Academy of Engineering and renowned industry experts unanimously assessed that Huaneng Hard‑Beam Covered Hydropower Station's "intelligent vibration control" technology achievements are overall at an internationally leading level.![]()
China Huaneng New Energy's installed capacity surpassed 80,000 MW. As a result, the company's total installed power generation capacity exceeded 250,000 MW, with low-carbon clean energy accounting for a record high of 48.47%.![]()
The China Power Enterprise Association announced the 2023 Power Industry Coal-Fired Unit Energy Efficiency Competition results. China Huaneng participated with 216 units, of which 72 units received awards, an award rate of 33.3%, ranking first in the industry. Among them, 16 Huaneng units received the titles of "Best Coal Consumption Unit" and "Best Power Usage Rate Unit", accounting for 42.1% of the corresponding awards, ranking first in the industry.![]()
The National Factory Management Transparency Coordination Group issued the "Decision on Recognizing Advanced Units in National Factory Management Transparency and Democratic Management Work (2021-2023)". The group company was first awarded the title of "National Factory Management Transparency Democratic Management Advanced Unit", and eight other units within the group also received this honor, making the group the top electricity generation group in terms of awarded units and setting a new record.![]()
Xinhua News Agency, China Brand Building Promotion Association, China Asset Valuation Association, and other organizations jointly released the "2024 China Brand Value Evaluation Information" list in Huzhou, Zhejiang. China Huaneng's brand value was assessed at 126.05 billion yuan, ranking 7th in the China Energy and Chemical Industry Brand Value Ranking.![]()
The 8th China-Russia Expo opened to the public at the Harbin International Convention and Exhibition Center, and China Huaneng Group Co., Ltd. participated for the first time.![]()
China Huaneng Group Co., Ltd. held a headquarters employee meeting, fully implementing General Secretary Xi Jinping's important instructions and the decisions and deployments of the Party Central Committee and the State Council, fulfilling the requirements of the central inspection and rectification, and deploying adjustments to the group's management system and organizational structure.![]()
The 4th State-Owned Enterprise Digital Transformation Forum released the "Top Ten Digital Technology Achievements of State-Owned Enterprises", and China Huaneng's digital turbine monitoring instrument system (TSI) was successfully selected.![]()
China Huaneng Kubuqi Desert Erdos South New Energy Base project laid the first foundation pile for the 1,000,000 kW photovoltaic pilot project, marking the main construction phase of the project. On October 31, all 2,156,200 photovoltaic modules of the 1,000,000 kW photovoltaic project in Phase I of the China Huaneng Kubuqi Desert Erdos South New Energy Base were installed, laying a solid foundation for the project's commissioning within the year.![]()
China's first secure and trustworthy distributed control system—the Huaneng Ruiwo T316TR DCS—was successfully commissioned on Unit 3 of the Weihai Power Plant, becoming the first industrial control system to receive authoritative security certification from the Ministry of Public Security and the Ministry of Industry and Information Technology, marking a major breakthrough in China's power generation control safety.![]()
Huaneng held its first International Standardization Youth Expert Training and Selection event in Lanzhou. The event was organized by the group and hosted by the Xi'an Institute of Thermal Engineering, aiming to implement the national standardization strategy, further enhance the group's international standardization work, and build a composite team of young experts who understand the profession, rules, and foreign languages. Over 60 young employees from the group participated.![]()
China Coal New Energy project officially joined China Huaneng New Energy Smart Operation and Maintenance System, marking the formal launch of cooperation between China Huaneng and China Coal New Energy.![]()
The State‑owned Assets Supervision and Administration Commission reported the 2024 evaluation of central enterprises' targeted assistance performance, and China Huaneng received the highest rating of "Good" for the eighth consecutive year.![]()
Huaneng Pengzhou Hydrogen Production Demonstration Station successfully sold its first truckload of hydrogen, marking the commercial operation of Huaneng's first large-scale water electrolysis hydrogen project.![]()
The 2023 National Science and Technology Award was announced in Beijing. Huaneng's Xi'an Institute of Thermal Engineering and Lancangjiang Company jointly completed the projects "Flexible and Efficient Key Technologies and Applications for Transient Processes of Coal-Fired Power Units in New Power Systems" and "Key Technologies and Applications for Intelligent Construction of High-Dam Projects under Complex Conditions", which received the National Science and Technology Progress Award Second Class.![]()
The 15th World Economic Forum New Leaders Annual Meeting (also known as the "Summer Davos Forum") was held in Dalian. As the co-chair of this year's meeting, on the 25th, Wenshuang, Chairman and Party Secretary of China Huaneng Group Co., Ltd., attended the series of events and served as a speaker at the "Never Forget the '初心' of Energy Transformation" subforum. In the subforum, Wenshuang stated that Huaneng is willing to drive the overall development of the energy and power industry through its own low-carbon transformation, providing clean, low-carbon, and green power security for economic and social development, and contributing more to building a clean and beautiful world.![]()
On September 27, the Publicity Work Bureau of the State-owned Assets Supervision and Administration Commission of the State Council held the screening and release ceremony for the 2024 Central Enterprise Socialist Core Value Theme Microfilm (Microvideo). China Huaneng's "Coal Sea Escort Team" won the Outstanding Work award for the 2024 Central Enterprise Socialist Core Value Theme Microfilm (Microvideo). The two works "What is Youth · Why Youth" and "Exploring the New Energy Security Strategy: Zhejiang Code" received the Outstanding Work award for the 2024 Central Enterprise Grassroots Theory Presentation Microvideo.![]()
On September 29, Chairman and Party Group Secretary Wen Shugang of China Huaneng Group convened a Party Group meeting to convey and study the spirit of the September 26 CPC Central Political Bureau meeting, the important speech by General Secretary Xi Jinping at the 75th anniversary celebration of the Chinese People’s Political Consultative Conference, and other matters, and to study and deploy the implementation work of the group company.![]()
On September 29, with the full-capacity commissioning of the 300 MW wind power project co-built with the flexibility retrofit of Huaneng Manzhouli Dalai Lake coal-fired power plant, China Huaneng’s low-carbon clean energy installed capacity ratio surpassed 50%, with new energy installed capacity exceeding 88,000 MW, marking another breakthrough in green low-carbon transformation.![]()
On September 29, with the successful grid connection of the last turbine of Dalian Zhuanghe IV2, China Huaneng Group’s Dalian Zhuanghe offshore wind project achieved full-capacity grid-connected power generation. The project is Liaoning Province’s first cost-competitive offshore wind project, located in the eastern sea area of Shicheng Island, Zhuanghe City, Liaoning Province, with an installed capacity of 200 MW and an annual grid-connected output of 630 million kWh, meeting the annual electricity demand of 500,000 households.![]()
On September 29, Huaneng’s first (set) demonstration project of frequency regulation, peak shaving, and safe heating integrated enhancement based on molten salt thermal storage was successfully commissioned at Huaneng Haimen Power Plant. This is the country’s first demonstration project coupling molten salt thermal storage with a million-unit plant and four-unit joint control of steam-water power for frequency regulation and peak shaving, marking a breakthrough in China’s megawatt-level 6 kV high-voltage direct-drive molten salt electric heating equipment innovation and comprehensive utilization of multi-voltage-level molten salt electric heating equipment, and the first domestic fully domestic operation of molten salt complete equipment control (Huaneng RuoWo).![]()
On October 1, the International Organization for Standardization (ISO) announced the official release of the international standard ‘Corrosion of Metals and Alloys – Disinfectant Corrosion Test Method – Spray Method’ (ISO 9812:2024), which was led and drafted by China Huaneng.![]()
On October 11, Huaneng Jiayuguan’s 30 MW high-efficiency heterojunction solar cell module demonstration platform successfully connected to the grid, marking the official commissioning of Huaneng’s first large-scale advanced photovoltaic technology demonstration and application base, which will strongly promote the industrialization of advanced PV technology and provide robust support for cost reduction, efficiency improvement, and equipment selection in the PV industry.![]()
On October 12, at the opening ceremony of the 90th anniversary of the China Society of Electrical Engineering and the 2024 annual meeting, the 2024 Power Science and Technology Awards were presented. China Huaneng Group Co., Ltd. received 15 awards in the 2024 Power Science and Technology Awards. Among them, the new generation low-energy-consumption post-combustion carbon capture key technology and application won the first prize of the Power Technology Invention Award, the only project in the entire industry to receive this honor, marking Huaneng’s first breakthrough in winning the first prize. Liu Lianbo from Huaneng Clean Energy Institute received the Outstanding Contribution Award in Power Science and Technology, becoming the eighth person from Huaneng to be honored since the award was established in 2015.![]()
On October 14, the China Society of Electrical Engineering Power Carbon Reduction Special Committee, initiated and applied for by China Huaneng Group Co., Ltd., was established in Beijing.![]()
On October 16, the 2024 China (Chongqing) Digital Energy Industry Innovation and Development Conference opened in Chongqing. In the conference’s core activity—the country’s first digital energy industry exhibition—China Huaneng Group showcased its recent achievements in digitalization, intelligent transformation, and green low-carbon development, as well as its development in Chongqing, injecting a ‘Huaneng element’ into the conference.![]()
On October 23, the third Belt and Road Energy Ministers' Meeting was held in Qingdao. China Huaneng’s first grid-side energy storage project built and operated in a European country—the Mendie project—was awarded the ‘Small and Beautiful’ Intelligent Innovation Energy International Cooperation Best Practice.![]()
On October 31, the ‘2024 Global Poverty Reduction Partners Forum’, a parallel forum of the 2024 Poverty Reduction and Development High-Level Forum organized by the Ministry of Agriculture and Rural Affairs and hosted by the China International Poverty Reduction Center, was held in Beijing. The forum announced the best poverty reduction case of the Fifth Global Poverty Case Collection Activity, and China Huaneng’s support case ‘Green Development of Southern Xinjiang Natural Resources: Gobi Desert Transforms into Gold and Silver Beach’ was selected.![]()
On November 5, the Seventh China International Import Expo opened in Shanghai. As a comprehensive energy group integrating power, coal, finance, technology, and transportation industries, China Huaneng signed eight procurement intention agreements during the Expo with partners such as Siemens Energy, Mitsubishi Heavy Industries, Ansaldo Energia, Shanghai Electric, and Dongfang Electric, covering gas turbine main equipment and long-term maintenance services, with a total contract value of approximately 4.245 billion RMB.![]()
On November 6, the 2024 Brand Innovation Conference and the 12th National Brand Story Competition National Finals, organized by the China Quality Association, were held in Ganzhou, Jiangxi. The conference announced the 2024 brand innovation achievements of Chinese enterprises. China Huaneng’s four brand management cases, recommended by the power sector sub-competition, were successfully selected.![]()
On November 6, the international standard ‘Sampling and Determination of Mercury in Flue Gas from Fixed Pollution Sources Using Chemical Absorption Method’ (ISO 5409:2024), led and drafted by Huaneng, was officially released.![]()
From November 11 to 13, China Huaneng Group showcased its latest achievements in green transformation and technological innovation at the 2024 Third China Nuclear Energy High-Quality Development Conference and Shenzhen International Nuclear Energy Industry Innovation Expo.![]()
On November 18, certified by a third-party authoritative organization, China Huaneng’s independently developed large-area perovskite–silicon tandem cells achieved a conversion efficiency of 26.12% (active area 1337.4 cm²), marking a new breakthrough in Huaneng’s perovskite cell technology development.![]()
On November 21, China Huaneng Group Co., Ltd. held a Technology Innovation Conference at its headquarters, deeply studying and implementing the spirit of the 20th National Congress of the Communist Party and the 20th Central Committee plenary sessions, resolutely implementing General Secretary Xi Jinping's important remarks on scientific and technological innovation, and carefully implementing the national science and technology conference and the central enterprises' science and technology innovation conference deployments. The conference summarized the achievements of the company's science and technology innovation work in recent years, based on the mission and responsibilities of central enterprises in the new era and new journey, and outlined the overall strategy and key tasks for the company's next phase of science and technology innovation.![]()
On November 21, the National Energy Administration announced the fourth batch of major technical equipment in the energy sector; China Huaneng's 'Digital Turbine Monitoring Instrumentation System (TSI)' was successfully selected.![]()
On November 26, a launch meeting for the Central Enterprise CCUS Innovation Consortium, jointly hosted by China Huaneng and China Petrochemical Corporation under the guidance of the State-owned Assets Supervision and Administration Commission of the State Council, was held in Beijing, officially launching the consortium.![]()
On November 26, the latest achievement of Huaneng's intelligent mining construction, the 'Huaneng Ruichi' unmanned pure electric mining truck without a cabin, was officially launched to global users at the Shanghai International Engineering Machinery Expo.![]()
On November 28, China Huaneng Group Co., Ltd. signed a strategic cooperation agreement with China National Railway Group Co., Ltd. at the group's headquarters. According to the agreement, the two parties will cooperate strategically in freight transportation, electricity sales services, project construction, supply chain finance, and corporate culture exchange, jointly ensuring stable and smooth coal supply, gradually increasing the proportion of green transport, further reducing logistics costs, and setting an example of road-enterprise cooperation.![]()
On November 29, China Huaneng Group Co., Ltd.'s pilot electronic document resource library passed the final national pilot acceptance.![]()
On November 30, the key project of Huaneng Chengde Million Clean Energy Base connected the Songguan Wind Farm and Zhaoxinghu Photovoltaic Farm to the grid for power generation.![]()
On December 1, China Huaneng Group Co., Ltd.'s coal production for 2024 reached 100 million tons, marking the third consecutive year surpassing the 100-million-ton threshold.![]()
On December 5, China Huaneng Group Co., Ltd. signed a strategic cooperation agreement with iFlytek Co., Ltd. at the group's headquarters. Under the agreement, the two parties will leverage their respective technologies, resources, and capabilities to collaborate comprehensively in research, talent, platforms, technology, and projects, fully exploiting the multiplier effect of 'AI+', and jointly create a typical demonstration of AI-enabled energy and power industry.![]()
On December 5, the China Central Television's 'Second ESG Model Ceremony' was held in Beijing. China Huaneng Group Co., Ltd. was awarded the 'China ESG Model Enterprise' title, and the company's chairman and party secretary, Wen Shugang, shared the company's outstanding ESG practices on site.![]()
On December 6, China Huaneng Group Co., Ltd. signed a strategic cooperation agreement with Huawei Technologies Co., Ltd. at the group's headquarters. According to the agreement, the two parties will further deepen strategic cooperation in clean energy collaboration, digital transformation, establishing joint innovation labs, and corporate culture exchange.![]()
On December 6, the two international standards on industrial cooling water corrosion prevention revised under Huaneng's leadership were officially released, marking China's world-leading status in the relevant technology field and providing scientific and standardized technical guidance for corrosion and fouling control in global industrial cooling water systems.![]()
On December 8, the first demonstration unit (119.66 MW) of Huaneng Suzhou Gas Turbine Innovation Development Demonstration Project successfully entered commercial operation after a 96-hour continuous full-load trial run. This unit was the first F-class (80 MW) gas turbine project among the National Energy Administration's initial batch of demonstration projects to be commissioned, marking a major breakthrough in domestic heavy-duty gas turbine equipment technology and serving as an important demonstration leader.![]()
From December 10 to 12, the 2024 'Lanmei Travel' event was successfully held in Yunnan. Guided by the Ministry of Foreign Affairs and the Ministry of Water Resources, hosted by the Lanmei Water Resources Cooperation Center, co-sponsored by China Huaneng Group Co., Ltd., the event was attended by more than 60 diplomats, experts, and mainstream media reporters from the five Mekong River basin countries—Cambodia, Laos, Myanmar, Thailand, and Vietnam—along with domestic and international journalists.![]()
On December 12, the 12th China Enterprise Global Image Summit was held in Beijing. The forum announced the results of the '7th China Enterprise International Image Construction Case Collection' competition, and Huaneng's submission 'The Iron-Brother Bond: Building the Light of Friendship on the China-Bangladesh Economic Corridor' was awarded the '2024 (7th) China Enterprise International Image Construction – Cultural Integration and Civilizational Exchange Category' Outstanding Case.![]()
On December 12, the hybrid energy storage system—'10 MW × 6-minute supercapacitor + 10 MW/10 MWh lithium battery'—developed by the Xi'an Institute of Thermal Engineering, entered commercial operation at Huaneng Zuoqian Power Plant. It is the world's largest-capacity supercapacitor hybrid storage system and the first 10 MW-level supercapacitor storage coupled with a thermal power unit for power frequency regulation, marking China's leading position in supercapacitor storage frequency regulation technology.![]()
On December 17, China Huaneng Group Co., Ltd. signed a capital increase agreement for Huaneng New Energy Co., Ltd. with five enterprises—China Guoxin, China Post, China Taiping, the National Green Development Fund, and Southern Power Grid—at the group's headquarters. This is the largest equity financing in Huaneng's history and the largest private equity financing in the new energy sector in the capital market this year, marking a major milestone for Huaneng's new energy business.![]()
At the 2025 International Standardization (Qilin) Conference, China Huaneng led the preparation of two IEC (International Electrotechnical Commission) white papers, "Emerging Photovoltaic Materials and Technologies" and "Smart Hydropower", which were officially released.![]()
The "2025 China Brand Value Assessment Information" was officially released, organized by the China Brand Development Promotion Association, China Asset Valuation Association, Xinhua News Agency Brand Office, and other units. In the China Energy and Chemical Industry Brand Ranking, China Huaneng Group Co., Ltd.'s brand value assessment reached 133.321 billion yuan, setting a record high and ranking first.![]()
Premier Li Qiang attended the opening ceremony of the 2025 Summer Davos Forum in Tianjin and delivered a speech. China Huaneng Group Co., Ltd.'s Chairman and Party Group Secretary Wen Shugang participated in the forum opening ceremony, a dialogue between Premier Li Qiang and business representatives, a collective meeting of state‑owned enterprises with World Economic Forum President and CEO Boerge Brundt, the Dalian Reception Hall – Central‑Local Cooperation Exchange, and other related events.![]()
News
There is no news.