1974 Established with capital of 20,000 thousand yen: Started production of mechanical cash registers.
1976 Start of export radio equipment, flexible PCB assembly, and ribbon cable terminal processing.
1977 Capital increased to 40,000 thousand yen.
1978 Tokyo Office Opening (Minato City, Tokyo)
1981 Capital increased to 100,000 thousand yen.
1982 Expansion of head office factory.
1983 Introduction of automatic insertion machine and automatic soldering equipment.
1984 Establishment of Daikin Elecom subsidiary (Oishida Town Imasuku): Introduction of environmental test equipment.
1985 Opened second factory: Expanded head office administration building: Changed company name to Daikin Electronics Industry Co., Ltd.
1986 Expansion of second factory.
1987 Introduction of chip mounter.
1992 Opening of third factory.
1994 Merged Daikin Elecom Co., Ltd.
1996 Obtained ISO9002 certification (JQA-1227).
1999 Obtained ISO9001 upgrade certification.
2006 Obtained ISO14001 certification (JQA-EM5126): Opened package center (former second factory): Introduced chip mounter equipment for high‑density microchip component assembly: Introduced hybrid (X‑ray + optical) appearance inspection equipment.
2007 Introduced N2 atmosphere lead‑free soldering equipment: Introduced 3D solder printing inspection equipment: Introduced 3‑LED lighting method appearance inspection equipment.
2009 Introduced desktop PCB appearance inspection equipment VT‑RNS‑ptH.
2010 Obtained medical device manufacturing permit: Certified solar cell modules and updated JETPVm certified factory: Medical device manufacturing permit (general medical devices).
2013 Added desktop PCB appearance inspection equipment VT‑RNS‑PTH1 (Omron).
2014 Added chip mounter (Fuji Machine) AIMEXIIS (3‑stage).
2015 Expansion of Selective Trace Soldering Equipment (Seitek) STS-450PLUS (2 units)
2016 Expansion of Flying Probe Tester (Yokie Electric) FA1240-52
2018 Expansion of N2 Reflow Equipment (Tamura Manufacturing) TNV50-6710EM-P
2019 Expansion of Screen Printing Machine, SPG (Panasonic) NM-EJP6A: Expansion of Solder Printing Inspection Machine (CKD) VP5200L-V
2020 Implementation of Telework and Online Conference System
2023 All Factory LED Lighting Work and HVAC Equipment Update
Show all (27 )