WAKACHIKU CONSTRUCTION CO.,LTD.
Basic information
- Head office
- 23-18-2 Shimomeguro, Meguro-ku, Tokyo
- Chief executive
- Mikihiko Nagakami
- Capital
- 11,304,007,000 (113 100 million)
- Employees (non-consolidated)
- 825 people
- Employees (consolidated)
- 881 people
- Start date
- 1890-05-23
- End date
Websites
Business
Related companies
| Company name | Group | Parent | Subsidiary | Customer | Supplier | Alliance | Bank | Shareholder |
|---|---|---|---|---|---|---|---|---|
| Wakatsuki Construction Health Insurance Association |
Network
History
Wakizuki Construction was founded in 1900 (Meiji 23) with the purpose of building and operating the Kokura Wakimatsu Port in Kitakyushu![]()
The Wakimatsu Port expansion project at the time of founding enabled large-scale supply of high-quality coal and supported the development of modern Japan![]()
Wakatsuki Construction was founded in 1900 with the purpose of building and operating Wakamiya Port in Kitakyushu. The initial Wakamiya Port expansion project enabled the large-scale supply of high-quality coal, supporting the development of modern Japan.![]()
1909: Plan to establish Wakamiya Port Construction Company with a capital of 600,000 yen is finalized![]()
1910: May 23 is designated as the founding day of Wakamiya Port Construction Company: Company building at the time of founding: Wakamiya Port construction work begins![]()
1917: Construction of the Fujinoki Nishi Island reclamation project (–1921): Fujinoki reclamation work![]()
1919: Ordered bucket dredging vessels Second Sea Maru and Third Sea Maru from the UK: Second Sea Maru: Third Sea Maru![]()
1925: Started operation of sand-pump dredging vessel Wakamiya Maru (80 hp) and completed construction of the Hamafune fumigation plant![]()
1936: Completed the one-character coastline reclamation and seawall construction at Shibata District under the commission of the town council: Completed one-character wharf![]()
1948: Port dues collection abolished on March 31; revised articles approved due to change of company purpose, expanding into harbor construction![]()
1953: Construction of the 1000-horsepower dredging vessel First Wakizuki Maru at our shipyard: Opening of the Tokyo branch![]()
1956: Commencement of the Suna-machi works in Tokyo (self-embankment): Suna-machi embankment site: Commencement of the Idemitsu Kosan Tokuyama refinery works: Idemitsu Kosan Tokuyama refinery wharf and Dolphin works![]()
Showa 34: Opening of Tokyo headquarters; start of Ariake artificial island construction; start of Ishihara reclamation works in Yokkaichi City (company reclamation) (-1966); Ishihara company reclamation seawall works![]()
Showa 38: Completion of Inage reclamation works 1 (company reclamation) in Chiba Prefecture; Inage reclamation works![]()
1976: Commencement of the Suez dredging works: Commencement of the lower section works of the Hon-4 Connection Bridge at Omuro Bridge: Lower section works of the Omuro Bridge: Commencement of the Fukuoka City subway works: Fukuoka City subway works![]()
1980: First residential subdivision in Ichihara City, Chiba Prefecture: Development of wave‑break blocks (Pylock)![]()
1985: Development of the seated stone‑smoothing method: Commencement of the Haneda offshore ground improvement works![]()
Showa 61: Start of construction of seawall and embankment works in Ground Improvement Zone 3 at Kansai Airport![]()
1990: Issuance of a split‑type new‑share subscription bond with a guarantee from Doru Bank (100 million USD): Commencement of the western works of the Tokyo Bay Crossing Road on the Kisarazu artificial island![]()
1997: Commencement of the construction of the Mondo Port Building and Hotel: Mondo Port Building, Hotel (Fukuoka Prefecture): Establishment of quality assurance policy![]()
1998: Completion of the Wakimatsu Main Store and opening of the Wakichiku Historical Museum: Wakimatsu Main Store, Wakichiku Historical Museum (Fukuoka Prefecture)![]()
2000: Establishment of Wakamatsu Life Research Institute: Commencement of construction of Trincomalee Port in Sri Lanka: Commencement of land consolidation project in Yoshishi, Kitakyushu City, Fukuoka Prefecture: Yoshishi residential land development (Fukuoka Prefecture)![]()
2001: Commencement of seawall construction at Chubu International Airport: Installation of a submerged foundation using the Plying Pontoon method (submerged road construction at central port area of Iwaki Port)![]()
2002: Development of a slope‑adapted stone‑smoothing method: Marine Picker (slope‑adapted stone‑smoothing vessel with inclined rod tamper): Commencement of emergency restoration work for navigation lights and fender facilities at Dili Port, East Timor![]()
2003: Development of a water‑retaining sheet method (Geomarine) for seawall at a marine waste disposal site: Sale of Dimension Akama Station Front (apartment) in Sumiyoshi City, Fukuoka Prefecture: Dimension Akama Station Front (Fukuoka Prefecture)![]()
2004: Commencement of new construction of Kouto Elementary School in Nagasaki Prefecture: Kouto Elementary School (Nagasaki Prefecture): Development of beach sand control technology (DRIM method)![]()
2006: Commencement of external works for runway D at Tokyo International Airport: Commencement of tsunami disaster recovery works in Sri Lanka and Maldives due to the Sumatra earthquake: Commencement of improvement works for San Juan del Sur fishing port in Nicaragua: Participation in the PFI project for the Ishinomaki District Regional Administrative Office Fire Department Headquarters (with Ishinomaki Fire Station) relocation and renovation project: Ishinomaki District Regional Administrative Office Fire Department Headquarters (Miyagi Prefecture): Development of 100% copper slag fine aggregate concrete![]()
2007: Development of a large‑scale fish reef system centered on cast‑iron frame and timber fish reefs: Development of RC-Doctor, a survey and diagnostic system for reinforced concrete structures: Development of bridge pier repair technology using underwater work containers (PREDAM method): PREDAM installation concept![]()
2008: Development of an automatic winch system for the underside of piers: Commencement of construction of the new Manara Bridge in Sri Lanka and related road improvement plan![]()
2009: Development of a marine habitat foundation: Commencement of seawall construction for the final disposal site of waste at Iwaki Port No.3: Commencement of construction of Male Second Girls Middle School in Maldives: Male Second Girls Middle School![]()
2011: New inspection method for port steel structures: Application of non‑contact vortex flaw detector (INCOTEST) for thickness measurement underwater: Research on marine environmental restoration using calcia‑modified soil: Commencement of central function improvement works at Jaffna Education Hospital in Sri Lanka: Central function building of Jaffna Education Hospital![]()
2012: Contracted disaster waste disposal work (Ishinomaki Block): Development of decontamination and volume reduction technology for contaminated soil using a high‑performance cleaning device![]()
2016: Commencement of major national highway bridge construction in Sri Lanka – Package 1: Renovation of the technology research institute![]()
Reiwa 2: Celebrating 130th anniversary: Established the Offshore Wind Development Office to strengthen response to offshore wind power generation business![]()
Reiwa 3: Development of sediment reduction technology using centrifugal dewatering machine for dredging![]()
News
Japan Wind Farm Construction to exhibit at 18th International Wind Energy Expo (Autumn)
Japan Wind Farm Construction Co., Ltd. will exhibit at the 18th International Wind Energy Expo (Autumn) at Makuhari Messe from September 9 to 11, 2026. At booth E10-24, it will display JWFC SUNRISE, a self-elevating platform (SEP) vessel for offshore wind construction. Visitors can register for admission using the badge registration form on the official website.
Promotion of Demonstration Research on Seaweed Bed Creation at Hakodate Port West Breakwater
Wakatsuki Construction conducted demonstration research on seaweed bed creation and blue carbon absorption in the shallow area of the calcium-modified soil at Hakodate Port West Breakwater, and summarized the results.
Wakatsuki Construction, WIND EXPO Autumn Debut
Wakatsuki Construction will make its first appearance at the 14th International Wind Power Exhibition held at Makuhari Messe from September 17, 2024, for four days, introducing onshore large wind turbine installation methods and jointly owned wind power related technologies.
Public records
National Tax Agency basic information6290801012011
- Trade name
- 若築建設株式会社
- Trade name (kana)
- ワカチクケンセツ
- Name in English
- Corporation type
- 301
- Address
- 〒808-0024 福岡県北九州市若松区浜町1丁目4番7号
- Postal code
- 8080024
- Prefecture code
- 40
- City code
- 103
- Address outside Japan
- Prefecture in English
- City in English
- Address outside Japan in English
- Corporate number assignment date
- 2015-10-05
- Update date
- 2018-07-18
- Change date
- 2015-10-05
- Registry closure date
- Reason for registry closure
- Successor corporate number
- Details of the change
- Latest record
- 1
- Excluded from search
- 0
- Processing type
- 01
- Correction type
- 1
- Trade name image ID
- Address image ID
- Sequence number
- 5296650
METI gBizINFO6290801012011
- Corporate number
- 6290801012011
- Trade name
- 若築建設株式会社
- Trade name (kana)
- ワカチクケンセツ
- Trade name (alphabet)
- Registry closure date
- Reason for registry closure
- Registered address
- 福岡県北九州市若松区浜町1丁目4番7号
- Postal code
- 8080024
- Prefecture
- 福岡県
- Prefecture code
- 40
- City or district
- 北九州市若松区
- City code
- 103
- Street address
- 浜町1丁目4番7号
- Organisation type
- 301
- Processing type
- 01
- Correction type
- 1
- Status
- Representative
- 代表取締役社長 長廻 幹彦
- Capital
- 11374000000
- Employees
- 768
- Employees (male)
- 689
- Employees (female)
- 79
- Business summary
- 総合建設業
- Website URL
- https://www.wakachiku.co.jp/csr/next_generation.html
- Year founded
- Business category
- D:建設業
- Date established
- 1890-05-23
- Unified government qualification - grade
- |B|B|
- Unified government qualification - business items
- 210|212|224|229|303|308|310|315
- Update date
- 2018-07-18
- Key information
- 6290801012011