Kansai Electric Power Co., Inc.
Basic information
- Head office
- 3-6-16 Nakano-shima, Kita-ku, Osaka City, 530-8270
- Chief executive
- Masahiro Kurokawa
- Capital
- 630,000,000,000 (6,300 100 million)
- Employees (non-consolidated)
- 8,336 people
- Employees (consolidated)
- 32,482 people
- Start date
- 1949-04-01
- End date
Websites
Business
Related companies
Network
History
The Nuclear Research and Development Department was established for nuclear research and development![]()
The Omachi Tunnel for the construction of the Kurobe River No. 4 Power Station faced a fault rupture zone (breakthrough in December)![]()
Successful completion of the Nagahama Strait transmission line construction using the world's first balloon method![]()
The first pumped-storage power plant of our company, the Sano Power Station, began operation (34,000 kW, increased to 1,500 kW in December 1968)![]()
The maximum summer power for the first time exceeded the maximum winter power (transition to summer peak type)![]()
Operation of Unit 4 at Himeji No. 2 Power Station (450,000 kW, total 1,350,000 kW), first two-stage reheat with supercritical pressure![]()
Operation of Unit 1 at the first nuclear power plant of our company, Mihama Power Station (340,000 kW)![]()
Operation of Units 1 and 2 at the first pure pumped-storage power plant in Japan, Kisenzan Power Station (both 233,000 kW)![]()
Operation of Unit 5 at Himeji No. 2 Power Station (600,000 kW, total 1,950,000 kW). Automatic temperature and pressure rise using a computer, thermal power plant 10,030,000 kW![]()
With the completion of the 500 kV voltage-raising works on the Wakasa Main Line (inner side) and the West Kyoto Substation, the 500 kV main system was completed and began operation![]()
Core system power plants fully operational, establishing a backup system at the central power command center![]()
Established the Nuclear Safety System Research Institute as a lesson from the Mihama Unit 2 accident![]()
After the Hanshin-Awaji Great Earthquake, about 2.6 million homes in the Hanshin area experienced power outages (2.836 million kW); emergency power restoration completed 153 hours later![]()
The Electric Utility Act was amended for the first time in 31 years, easing regulations on wholesale electricity businesses![]()
First overseas power generation project by a power company: participation in the Sanloke Hydropower Project in the Philippines![]()
Amendment of the Electric Utility Act, starting retail liberalization of electricity; first electricity price reduction through notification![]()
Completion of the introduction of constant rated thermal output operation at all nuclear power plants![]()
Announcement of the plan to implement measures to prevent recurrence of the Mihama Power Plant Unit 3 accident![]()
The Sakai Solar Power Plant, the first megasolar plant operated by a power company in our country, has begun full-scale commercial operation![]()
Himeji Second Power Plant Unit 1 has begun commercial operation, upgrading to a combined cycle generation system using a new 1,600°C class gas turbine![]()
Formulated the "Corporate Philosophy", "Our Basic Attitude", "Kansai Power Group Vision", and "Brand Statement".![]()
Formulated the "Corporate Philosophy" and the "Kansai Power Group Mid-term Management Plan (2021-2025)".![]()
Our first, one of Japan's largest, battery storage facility "Kino River Battery Storage" began operation. *At the time of operation, according to our investigation*![]()
At Himeji No. 2 Power Station, the large industrial gas turbine achieved the first hydrogen generation in Japan with a 30% (volume ratio) co-firing rate![]()
News
There is no news.
Public records
National Tax Agency basic information3120001059632
- Trade name
- 関西電力株式会社
- Trade name (kana)
- カンサイデンリョク
- Name in English
- Corporation type
- 301
- Address
- 〒530-0005 大阪府大阪市北区中之島3丁目6番16号
- Postal code
- 5300005
- Prefecture code
- 27
- City code
- 127
- Address outside Japan
- Prefecture in English
- City in English
- Address outside Japan in English
- Corporate number assignment date
- 2015-10-05
- Update date
- 2025-05-12
- Change date
- 2025-04-11
- Registry closure date
- Reason for registry closure
- Successor corporate number
- Details of the change
- 令和7年4月1日大阪市北区中之島三丁目6番16号ケーイーフューエルインターナショナル株式会社(4120001194214)を合併
- Latest record
- 1
- Excluded from search
- 0
- Processing type
- 71
- Correction type
- 0
- Trade name image ID
- Address image ID
- Sequence number
- 4094047
METI gBizINFO3120001059632
- Corporate number
- 3120001059632
- Trade name
- 関西電力株式会社
- Trade name (kana)
- カンサイデンリョク
- Trade name (alphabet)
- Registry closure date
- Reason for registry closure
- Registered address
- 大阪府大阪市北区中之島3丁目6番16号
- Postal code
- 5300005
- Prefecture
- 大阪府
- Prefecture code
- 27
- City or district
- 大阪市北区
- City code
- 127
- Street address
- 中之島3丁目6番16号
- Organisation type
- 301
- Processing type
- 71
- Correction type
- 0
- Status
- Representative
- 代表執行役社長 森 望
- Capital
- 630040000000
- Employees
- 11151
- Employees (male)
- 8951
- Employees (female)
- 1989
- Business summary
- 電気事業、熱供給事業、電気通信事業、ガス供給事業 等
- Website URL
- https://www.kepco.co.jp/sustainability/society/diversity/woman.html
- Year founded
- Business category
- F:電気・ガス・熱供給・水道業
- Date established
- 1951-05-01
- Unified government qualification - grade
- |A|A|A
- Unified government qualification - business items
- 213|216|229|309|315|402
- Update date
- 2025-05-12
- Key information
- 3120001059632