| 1954-03 |
(S29) Established in Tenjin-cho, Fukuoka City under the trade name Kyushu Steel String Concrete Co., Ltd. Chairman of the Board: Taro Yasukawa (Chairman of Yaskawa Electric Corporation), President: Kanichi Maki (Chairman of Fukuoka Trade and Industry Cooperative Association) |
| 1954-10 |
(S29) Opened Yame Factory [Yame Village, Chikushino District, Fukuoka Prefecture] |
| 1954-12 |
(S29) First order received for prestressed girder bridge "Saigo Bridge" (ordered by Tosu City, Saga Prefecture) |
| 1955-04 |
(S30) First order received for post-tensioned bridge "Minami Chiku Bridge" (ordered by Fukuoka Prefecture) |
| 1959-07 |
(S34) 大阪出張所[大阪市北区](現 関西支店)設置 |
| 1960-08 |
(S35) Yasu Works [Yasu Town, Asakura District, Fukuoka Prefecture] established |
| 1961-10 |
(S36) Construction of Meishin Expressway Shakajigaike Bridge, Japan's first cantilever construction using Fresnel method |
| 1963-07 |
(S38) Tokyo Liaison Office (currently Kanto Branch) established in Chiyoda Ward, Tokyo |
| 1964-05 |
(S39) Held 10th Anniversary Commemoration Ceremony |
| 1964-10 |
(S39) Awarded contract for "Takamiya Water Purification Plant PC Tank" (Fukuoka City Waterworks Bureau), our company's first PC tank construction |
| 1965-11 |
(S40) Expanded into concrete prefabricated building business |
| 1966-03 |
(S41) Yoshiyuki Yamasaki appointed as President and CEO |
| 1970-08 |
(S45) Operations began at Chikuho Factory [Kurotori Town, Kurate District, Fukuoka Prefecture] (now Kyushu Kurotori Factory) |
| 1971-01 |
(S46) Operations began at Kanto Factory [Moka City, Tochigi Prefecture] |
| 1971-04 |
(S46) First order for mid-rise prefabricated housing "Takarauchi Danchi" (Kurume City) |
| 1972-04 |
(S47) Changed company name to Fuji P.S. Concrete Co., Ltd. |
| 1972-11 |
(S47) Awarded contract for Miyazaki Route 220 "Shin Tachibana Bridge" (formerly Ministry of Construction Kyushu Regional Construction Bureau). Our first cantilever construction using Divider G method. |
| 1974-06 |
(S49) Held 20th Anniversary Commemoration Ceremony |
| 1976-09 |
(S51) "Kanazawa Overpass" (formerly Japan Highway Public Corporation Hokuriku Expressway) awarded, first construction using moving support scaffolding by our company |
| 1977-10 |
(S52) Awarded the Metropolitan Expressway Wangan Line "BT208 Construction Section", received Japan Concrete Engineering Association Award and Saito Memorial Award |
| 1980-04 |
(S55) Awarded the Fukuoka Prefectural Office Building Curtain Wall |
| 1980-08 |
(S55) Construction started on Katsumoto Dam Bridge [Iki, Nagasaki Prefecture] (cable-stayed bridge), Construction started on Nishi-Ohashi [Fukuoka City] |
| 1981-01 |
(S56) Awarded "Hata Bridge" (Hiroshima Prefecture) [formerly Japan Highway Public Corporation Chugoku Expressway], construction using extrusion method |
| 1983-03 |
(S58) Awarded Honshu-Shikoku Bridge "Yoshima Elevated Bridge" and "Ban no Su Elevated Bridge" |
| 1984-05 |
(S59) Developed "Free System Method" for bridge deck replacement |
| 1984-05 |
(S59) 30th Anniversary Ceremony held |
| 1985-05 |
(S60) Constructed "Egg-shaped Digester" using divider method |
| 1985-07 |
(S60) Started construction of "Fuin Oohashi Deck Replacement Work (PC Deck Work)" (formerly Ministry of Construction Route 10, Oita Prefecture), first order of Free System Method |
| 1986-07 |
(S61) Started construction of "Shiomi River Bridge" on Nippo Main Line, received Saito Memorial Award |
| 1987-05 |
(S62) Okaya Overpass (Nagano Prefecture) received the Tanaka Award from the Japan Society of Civil Engineers, ordered by Nagoya Construction Bureau, Japan Highway Public Corporation |
| 1988-01 |
(S63) Developed precast slab "FC Plate" with channel-shaped cross-section |
| 1988-05 |
(S63) Nishichiba and Jimmokuji Overpasses (Aichi Prefecture) received the Tanaka Award from the Japan Society of Civil Engineers, ordered by Nagoya Construction Bureau, Japan Highway Public Corporation |
| 1989-12 |
(H1) Sadao Mizuta appointed as President and CEO |
| 1990-05 |
(H2) Hiroshima Kaita Bridge received the Tanaka Award from the Japan Society of Civil Engineers, ordered by Hiroshima Prefecture |
| 1990-09 |
(H2) Construction of exterior PC panels for Huis Ten Bosch / Hotel Europe started |
| 1991-04 |
(H3) Changed company name to Fuji P.S. Co., Ltd. |
| 1991-10 |
(H3) Developed "FR Plate", a precast concrete panel with ribs |
| 1992-05 |
(H4) Mukaikyo Bridge (Hiroshima Prefecture) received the Tanaka Award from the Japan Society of Civil Engineers, ordered by Honshu-Shikoku Bridge Public Corporation |
| 1993-04 |
(H5) Fukuoka Stock Exchange Listed |
| 1994-05 |
(H6) 40th Anniversary Ceremony |
| 1994-07 |
(H6) Construction of Kakkaku Sazanami Ohashi, the largest PC cable-stayed bridge in Japan at the time |
| 1994-10 |
(H6) President Akihisa Sugawa appointed |
| 1995-11 |
(H7) Developed FPS method for assembling precast products on site; constructed Fukuoka district single dormitory |
| 1996-04 |
(H8) Listed on Osaka Securities Exchange Second Section (now TSE Second Section) |
| 1997-12 |
(H9) President Yukihiro Yamashita appointed |
| 1998-02 |
Construction of Nabetada Overpass on the Second Meishin Expressway |
| 1998-02 |
Construction using span-wise panel method |
| 1998-11 |
Operation of Mie Factory [Mie Prefecture Taki District Meiwa Town] |
| 1999-04 |
Obtained certification for high-rise wall-type Ramen precast reinforced concrete (WRPC) |
| 1999-04 |
Construction of Kyushu Electric Power Torikai Housing |
| 1999-12 |
Kawano Fumimasa appointed as President |
| 2001-04 |
Operation of Tohoku Factory [Fukushima Prefecture Adachi District Ohtama Village] |
| 2002-05 |
Oboro Bridge (Fukuoka Prefecture) received the Tanaka Award from the Japan Society of Civil Engineers [Fukuoka Prefecture ordered] |
| 2002-05 |
Furukawa Overpass (Mie Prefecture) received the Tanaka Award from the Japan Society of Civil Engineers |
| 2003-06 |
Full-scale operation of FC/FR plate automatic production line at Kyushu Kotake Factory |
| 2004-05 |
Developed seismic reinforcement method "Parallel Frame Construction Method" |
| 2005-01 |
Construction of Seigakuin Elementary School |
| 2005-01 |
First Parallel Frame Construction Method |
| 2006-09 |
Establishment of the Compliance Committee |
| 2007-05 |
Construction of the Nishiname-Shin Expressway 'Kuzugataki Bridge' using the first prestressed web method in Japan |
| 2007-05 |
Received a contract for technical advisory services for highway construction in Taiwan |
| 2007-05 |
First wave-shaped steel web PC box girder bridge in Taiwan |
| 2007-06 |
Mr. Norihiro Nagao appointed as President and CEO |
| 2007-07 |
Parallel Frame Construction Method awarded the Land, Infrastructure, Transport and Tourism Technology Development Award |
| 2007-09 |
Developed the 'Parallel Unit Frame Construction Method' |
| 2007-11 |
Acquired Iwaki Factory of Tokiwa Kousan PC Co., Ltd. |
| 2008-01 |
Established Tokiwa PC Co., Ltd. |
| 2008-01 |
Acquired Iwaki Factory in Iwaki City, Fukushima Prefecture |
| 2008-07 |
Shizumi Bridge received the Civil Engineering Society Design Award |
| 2009-06-23 |
Established on June 23, 2009 |
| 2009-06-23 |
Established on June 23, 2009. Business contents: Diagnosis, repair, reinforcement of concrete structures such as bridges, civil engineering works, and construction; President: President and CEO Tsutomu Kajiwara |
| 2009-12 |
Participated in the Haneda Project |
| 2009-12 |
Constructed the pier and connecting guideway for Runway D at Tokyo International Airport Haneda |
| 2010-03 |
Provided technical guidance to the Kyrgyz Republic |
| 2010-07 |
Design support for Vietnam Railways |
| 2011-10 |
Merged with Tokiwa PC Co., Ltd. and began operations at our Iwaki Factory in Iwaki City, Fukushima Prefecture |
| 2011-11 |
Inauguration of the floating offshore wind power facility in Hakata Bay |
| 2011-12 |
Obtained certification for the Occupational Health and Safety Management System (OHSAS) |
| 2012-01 |
Fully acquired CPK Co., Ltd. and expanded the PC sleeper rail tie business |
| 2012-09 |
Developed the seismic reinforcement method 'Smile Parallel' |
| 2012-09 |
First recruitment at Tokyo Metropolitan Shin-Gawa-shi Apartment |
| 2013-06 |
President and CEO Nobutaka Sugano appointed |
| 2013-07 |
Listing on the Tokyo Stock Exchange Second Section due to the integration of the Tokyo and Osaka Stock Exchanges |
| 2013-08 |
Hiring engineers from the Federal Republic of Myanmar |
| 2014-05 |
Hirosegawa Bridge (Miyagi Prefecture) received the Tanaka Award from the Civil Engineering Society |
| 2014-06 |
60th Anniversary Ceremony Held |
| 2014-09 |
Established a local subsidiary, Myanmar Fuji P.S Construction Company Limited, in the Federal Republic of Myanmar |
| 2014-09-09 |
Established on September 9, 2014 |
| 2014-09-09 |
Established on September 9, 2014. Business contents: Civil engineering and construction using prestressed concrete and general concrete, including planning, design, construction supervision, and consulting; President: President and CEO Yosuke Yagi |
| 2015-01 |
Leased part of C.P.K. Shiga Factory and established Shiga Factory [Higashiomi City, Shiga Prefecture] |
| 2015-05 |
Genta Bridge (Tottori Prefecture) repair work received the Tanaka Award from the Civil Engineering Society |
| 2015-05 |
Irabu Ohashi (Okinawa Prefecture) received the Tanaka Award from the Civil Engineering Society |
| 2015-07 |
Developed seismic reinforcement method "Smile Dampa Frame" |
| 2015-07 |
First recruitment at Fukuoka City Chuo Housing |
| 2016-05 |
Formulated medium-term management plan "VISION2016" |
| 2016-09 |
Provided technical guidance on segment girder manufacturing to Indonesia |
| 2017-08 |
Completed repair and reinforcement work on Aso Nagayama Bridge |
| 2018-06 |
Listed on the Tokyo Stock Exchange First Section |
| 2018-06 |
Aso Nagayama Bridge (Kumamoto Prefecture) received the Tanaka Award from the Civil Engineering Society |
| 2019-02 |
Completed the Structural Experiment Building at the Technology Research Center |
| 2019-02 |
Provided technical guidance on bridge repair and reinforcement to Bangladesh |
| 2019-04 |
Tadahiko Tsutsumi appointed as President and CEO |
| 2019-06 |
Development of the composite slab method "DM Plate" on the first floor of the building |
| 2019-12 |
Fukuoka Prefecture Child-Rearing Support Declaration Enterprise and Governor's Award |
| 2020-03 |
Certified as a Health & Productivity Management Outstanding Organization 2020 (Large Corporation Division) |
| 2020-04-01 |
Established on April 1, 2020 |
| 2020-04-01 |
Established on April 1, 2020. Business contents: Survey, design, supervision of civil engineering and construction, repair and reinforcement work, and training of technical personnel; President: President and CEO Hisanobu Iwamoto |
| 2020-05 |
Komono Second Overpass (Mie Prefecture) received the Tanaka Award from the Japan Society of Civil Engineers [Ordered by NEXCO Central Japan] |
| 2021-01 |
Absorbed into the wholly owned subsidiary, CPK Corporation |
| 2021-05 |
Formulation of the 5th Mid-term Management Plan 【VISION2030】 |
| 2021-10 |
Fully acquired Suruga Giken Co., Ltd. |
| 2022-04 |
Transition from the First Section to the Standard Market due to review of market classification at the Tokyo Stock Exchange |
| 2023-09 |
Start of Fuji P.S. version rebranding initiatives |
| 2024-05 |
Produced the 70th Anniversary Commemorative Magazine |
| 2025-03 |
First certification of Health & Productivity Management Outstanding Organization 2025 (Large Corporation Division 【White 500】) |