Open company graph database — free web & API
Login

Toyo Construction Co., Ltd.

東洋建設株式会社TOYO CONSTRUCTION CO., LTD.AliasTOYO CONSTRUCTION CO.,LTD.Alias
Ticker
—
Listed market
TYO
Country
Japan
Employees (consolidated)
1,673
Related companies
19
§01

Basic information

BASIC
Head office
11th floor, Shinbashi Building, 1-105 Kanda-Jinbocho, Chiyoda-ku, Tokyo 101-0051 (Reception on 10th floor)
Chief executive
Ryuu Nakamura
Capital
14,049,360,000  (140 100 million)
Employees (non-consolidated)
1,528 people
Employees (consolidated)
1,673 people
Start date
1929-07-03
End date
§02

Websites

1 DOMAINS
§03

Business

7
General construction business (marine and land civil engineering, architecture)Real estate business, etc.Construction worksCivil engineering worksArchitectural worksInfrastructure developmentMarine wind power generation business
§04

Related companies

19 COMPANIES
Company name Group Parent Subsidiary Customer Supplier Alliance Bank Shareholder
Tomac Co., Ltd.
Group
Tōken Trading Co., Ltd.
Group
Techos Corporation
Group
Taisei Corporation
Group
Kusakabe Construction Co., Ltd.
Group
Tachibana Industries Co., Ltd.
Group
Brillia品川南大井
Group
CCT CONSTRUCTORS CORPORATION
Group
R3荒川中堤北葛西一丁目地区護岸改築工事
Group
ライオンズ錦糸町レジデンス
Group
国家石油ガス備蓄基地 波方基地
Group
大成建設グループ
Group
東名阪自動車道 しまだ工区
Group
福井公共職業安定所
Group
Roland Corporation
Customer
株式会社もり
Customer
Musashino Co., Ltd.
Customer
Showa Nishikawa Co., Ltd.
Customer
石狩湾新港管理組合
Alliance
Names without a link are companies not yet registered in OpenBizGraph
§05

Network

NETWORK
Drag to move · click to open
§06

History

62 EVENTS

On July 3, 1929 (Showa 4), Hanshin Construction Port Co., Ltd. was established through joint investment with South Manchuria Railway Co., Ltd. (Mantetsu). Kamesaburo Yamashita became president.Sources

July 3, 1929: Company founded, President Kamesaburo Yamashita appointed.Sources

Company founded, President Yamashita Kamesaburo appointedSources

In March 1933 (Showa 8), all necessary approvals for the Naruo project were obtained, and in October of the same year, a groundbreaking ceremony was held, marking the start of construction.Sources

In March 1933 (Showa 8), received all necessary approvals to commence construction of the Naruo project.Sources

Approval granted for Naruo constructionSources

In October 1933, a groundbreaking ceremony for the Naruo construction was held.Sources

Commenced construction in October of the same year.Sources

Inauguration ceremony heldSources

Electric pump vessel 'Naruo Maru' launchedSources

Construction of the Saeki Air Squadron site beganSources

With the outbreak of the Second Sino-Japanese War and the onset of wartime conditions, the Naruo project was deemed unnecessary and urgent, making fundraising difficult, and construction was inevitably halted in November 1938 (Showa 13).Sources

Construction was suspended in November 1938 (Showa 13).Sources

Construction suspendedSources

Masayuki Isomura appointed as the second presidentSources

End of the war.Sources

After Japan's surrender on August 15, 1945 (Showa 20), the country faced a severe shortage of goods and currency imbalance, leading to explosive inflation. Families, as well as the nation and businesses, struggled to survive day to day.Sources

In November 1945 (Showa 20), the head office was relocated to Kawaguchi-cho, Nishi-ku, Osaka.Sources

Relocated headquarters to Kawaguchimachi, Nishi-ku, Osaka City.Sources

In March 1946 (Showa 21), the company was permitted to participate in construction, and by operating two dredging vessels, it experienced its first post-war breakthrough.Sources

Contracted the Tone River water control works.Sources

In June 1946 (Showa 21), the company and its 100% shareholder Yamashita Shipping Co., Ltd. were designated as a 'restricted company', limiting their voluntary corporate activities.Sources

Received designation as a limited company.Sources

In November 1946, an office was opened in Ajiro Bay, Tottori Prefecture.Sources

Established a Nagasato office in the Nagasato Bay, Tottori Prefecture.Sources

In June 1949 (Showa 24), the restricted company designation was lifted.Sources

Designation as a limited company was lifted.Sources

In July 1949, the special accounting company designation was removed, and a 20th anniversary celebration ceremony was held.Sources

The designation of the special accounting company was revoked, and a 20th anniversary ceremony was held.Sources

In March 1950, shareholder dividends were reinstated.Sources

Resumption of shareholder dividends.Sources

In October 1950, paid-in capital was increased to 10 million yen.Sources

Paid-in capital increased to 10 million yen.Sources

In August 1952, the head office was moved to Fushimi-cho, Higashi-ku, Osaka.Sources

Relocated headquarters to Fushimimachi, Higashi-ku, Osaka City.Sources

In October 1953, capital was increased to 20 million yen.Sources

Capital increased to 20 million yen.Sources

In April 1955, capital was increased to 60 million yen.Sources

Capital increased to 60 million yen.Sources

In November 1956, the Tokyo branch office was upgraded to a Tokyo sales office, strengthening sales in eastern Japan.Sources

Upgrade the Tokyo branch office to a Tokyo sales office, strengthening sales in eastern Japan.Sources

In October 1957, the capital was increased to 120 million yen.Sources

Capital increased to 120 million yenSources

In November 1957, the electric-pump dredging vessel 'Fushimimaru' was built.Sources

Construction of the electric pump-type dredging vessel 'Fushimimaru'.Sources

In July 1959, a 30th anniversary ceremony was held and the company anthem was established.Sources

Held the 30th anniversary celebration and established the company anthem.Sources

During the Ise Bay typhoon in September 1959, the vessels 'Nagara', 'Kiso', and 'Kusakizamaru' sank, resulting in the loss of six crew members.Sources

The typhoon in Ise Bay caused the sinking of the 'Nagara', 'Kiso', and 'Kusakizakura' vessels, resulting in six fatalities.Sources

In October 1959, the capital was increased to 250 million yen.Sources

In May 1960, the Tokyo sales office was upgraded to a Tokyo branch.Sources

In July 1961, the head office was relocated to Takara-bashi, Higashi-ku, Osaka.Sources

In September 1961, the capital was increased to 550 million yen.Sources

In October 1961, shares were listed on the Osaka Stock Exchange Second Section.Sources

In May 1962, Masayoshi Haga became the third president.Sources

In October 1962, the company was listed on the Tokyo Stock Exchange Second Section.Sources

In October 1962, the capital was increased to 1.1 billion yen.Sources

On May 28, 1964, the company name was changed to 'Toyo Kensetsu Co., Ltd.'.Sources

In August 1964, the company was listed on the First Section of both the Tokyo and Osaka Stock Exchanges.Sources

In September 1964, the gas-turbine electric pump dredging vessel 'Dai-5 Tokai Maru' was built.Sources

Had to wait for 30 years until 1966 (Showa 41).Sources

Resumption of Naruo operationsSources

§07

News

34 ARTICLES

Toyo Construction Re-certified as a Water-Cycle ACTIVE CompanySources

Toyo Construction Co., Ltd. was re-certified as a Water-Cycle ACTIVE company in the 8th fiscal year of the Water-Cycle Company Registration and Certification System under the Human Resources and Capital category. The evaluation was based on each branch’s active participation in river and coastal cleanup activities.

Researcher Masuda Presents AI Wave Forecasting at Kobe University RCUSSSources

Researcher Kazuaki Masuda from the Oriental Construction Comprehensive Technology Research Institute presented the results of his research on weather and wave forecasting using AI at the Kobe University RCUSS Open Seminar. He disclosed wave forecasts up to 11 days ahead for 50 nationwide sites, and introduced efforts to apply them to marine civil engineering projects and to enhance resolution. He also explained plans to expand training data and incorporate physical laws in order to apply the system to disaster prevention.

Secured Civil Engineering Work for Sihanoukville Port NCT2Sources

Toyo Construction has secured Package 1 (civil engineering) of the Sihanoukville Port New Container Terminal Expansion Project (NCT2) in Cambodia. The total contract value is about 26.2 billion yen, and the construction period is 36 months, making it the largest project in Cambodia for the company. The project includes a 400‑meter quay, approximately 200,000 square meters of container terminal, and 12 buildings.

Toyo Construction Introduces Domestic First HVO-Blended Fuel Oil to Marine Civil Engineering WorkboatsSources

Toyo Construction Co., Ltd. introduced HVO-blended fuel oil into the deep mixing treatment vessel "DCM8" owned and operated by its group on September 1, 2026, marking the first domestic case of such fuel being used on workboats engaged in marine civil engineering projects. HVO is a drop-in fuel that does not require engine modifications, but challenges included the complexity of manufacturing approval and tax exemption procedures under local tax law. Toyo Construction collaborated with relevant authorities to streamline the procurement and fueling processes.

Toyo Construction Selected for e-Methane Production and CO2 Fixation Demonstration ProjectSources

Toyo Construction Co., Ltd. was selected for the Ministry of the Environment's 2026 (Reiwa 8) "Carbon Cycle Business Model Demonstration Subsidy Project for Regional Carbon Circulation Led by Private Enterprises". Through a joint proposal, the company will commence a demonstration project that includes the production and supply of e-methane and CO2 fixation. The main demonstration content involves capturing CO2 from the exhaust gases of Aisin Nishio Die Casting Plant and Denso Anjo Manufacturing Plant, liquefying and transporting it, and supplying it as city gas.

Toyo Construction's TV Commercial 'How Much Can You Love?' to AirSources

Toyo Construction Co., Ltd. will begin airing its 'How Much Can You Love?' television commercial in October 2026 on Nippon TV and TBS affiliates. The commercial conveys the company's commitment not only to buildings and infrastructure but also to people's lives and a sustainable society.

Toyo Construction and Miho Village Hold Hands-On Technology Event for ChildrenSources

Toyo Construction Co., Ltd. and Miho Village jointly held ‘Experience the Latest in Manufacturing Technology!’ on August 20, 2026. Twenty elementary school students and their parents took part in activities including observing concrete unloading and quality control, making paper models of earthquake-resistant structures and experiencing a high-rise construction site in VR. The event was the 22nd held in connection with Civil Engineering Day.

Toyo Construction Holds First Company-Wide Large-Scale Disaster Preparedness DrillSources

On September 1, 2026, Toyo Construction held its first company-wide large-scale disaster preparedness drill. A total of 2,087 employees, including group company staff, practiced safety confirmation and establishing a disaster response headquarters in a Nankai Trough earthquake scenario. Response teams coordinated online, held a briefing on employee safety and damage, and received comments from the president. The company plans to continue training and contribute to rapid recovery and reconstruction when disasters occur.

Toyo Construction Researcher Presents Talk on Marine AISources

On August 21, 2026, Kazuki Masuda, a researcher at Toyo Construction’s General Technology Laboratory, delivered an invited talk at the 138th Knowledge-Based Systems Research Group meeting of the Japanese Society for Artificial Intelligence, held at Kansai University. Titled “Marine AI Combining Data-Driven Methods and Physical Laws: From Wave Forecasting to Next-Generation Marine Construction Technologies,” the talk covered progress in AI wave forecasting and research tailored to practical needs, including longer forecast periods, broader areas, higher resolution, and communicating forecast variability. It also highlighted challenges such as performance under unseen conditions and prediction uncertainty, and the need to combine AI with observational data and numerical simulations.

Domestic Subsea Cable Burial Technology for Complex Seabed Conditions Selected by NEDOSources

A joint proposal by Toyo Construction Co., Ltd. and Ocean Engineering Co., Ltd. for developing cable burial technology suited to Japan’s complex seabed conditions was selected for NEDO’s next-generation new energy demonstration program. The project aims to develop low-cost, environmentally considerate construction methods needed to expand offshore wind power and achieve carbon neutrality by 2050. Drawing on their marine civil engineering and environmental monitoring experience, the companies will combine construction and monitoring technologies to improve subsea cable burial efficiency while protecting the environment.

§09

Sources & updates

SOURCES
↑