Research, design, and consulting related to regional and urban developmentConsulting services related to items 8 and 9 aboveAll ancillary businesses related to the preceding itemsContracting of civil engineering and construction worksDesign, supervision, and consulting for civil engineering and construction worksResearch, surveying, and design of hydroelectric power generationDesign and construction using the compressed air caisson methodDesign, manufacturing, repair, sale, and rental of construction machineryReal estate sales, leasing, management, and brokerageEnvironmental remediation of soil and water quality, including pollution cleanupCollection, transportation, treatment, and reuse of industrial waste
Names without a link are companies not yet registered in OpenBizGraph
§05
Network
NETWORK
Loading the relationship graph...
Drag to move · click to open
§06
History
94 EVENTS
The first world‑wide foundation work using the pressurized method was the Newmatic pile used for the pier foundation near Rochester, England, in 1851.
In Japan, the Newmatic method was first adopted for the reconstruction of the destroyed Eitai Bridge, Kiyosu Bridge, and Gomon Bridge as part of the Kanto Great Earthquake recovery projects in 1923 (Taisho 12).
First technical verification at "Toyomam Dam."
In 1936 (Showa 11), the construction of the Yongman Dam on the Second Songhua River in former Manchuria was carried out.
The temporary closure work on the left bank begins.
In 1939 (Showa 14), construction of the left bank provisional closure began.
Members involved in the Toyomam Dam founded Daikyo Construction in 1949.
Members involved in the Yongman Dam construction founded Daifuku Construction in 1949 (Showa 24).
With a capital of 5 million yen, "Daifuku Construction Co., Ltd." was established on March 31, 1949.
In 1951, during the embankment construction at the site of the Owatobashi on the left bank of the Tone River, we proposed the "Daifuku-style New Mechanical Casing Method," which involved excavating and transporting spoil and performing pressure regulation work using an airlock installed within a double-slab reinforced concrete structure. This method was adopted for the first time after the war.
Obtained a patent for the "Daifuku-style Submerged Construction Method," which increased safety and efficiency and led to receiving the Purple Ribbon Medal.
In 1951 (Showa 26), the "Daido Bridge Left Bank Earthworks" on the Tone River adopted the "Daifuku Newmatic Kason Method" for the first time after the war and obtained a patent.
Patent No. 193732 was obtained on January 30, 1951.
Participated in numerous dam-related projects following the promulgation of the "Electric Power Development Promotion Act (1952)."
As a construction company capable of "submerged construction," we participated in numerous embankment and port projects from 1954 to 1956.
Listed on the Second Section of the Tokyo Stock Exchange.
Since 1962 (Showa 37), the application area of the Newmatic Kason method in Japan has decreased, but the method has not disappeared.
First shield construction project commenced.
First overseas project commenced (construction of the Bosumgir Dam in Iran).
In 1964 (Showa 39), massive construction investment was carried out in preparation for the Tokyo Olympics.
Developed the "Dolphin Dock (DD) Method" for the Port of Naiezu Port harbor improvement project. Later, a patent was announced in 1971.
Capital increased to 1.2 billion yen
Listed on the First Section of the Tokyo Stock Exchange; headquarters building completed at Sumida River Eternal Bridge
Capital increased to 1.7 billion yen
Developed and adopted the "Soil Pressure Shield (DK) Method" for public sewer construction in 4-5 Chome, Aoto, Katsushika Ward
Capital increased to 2.1 billion yen
Established Tai Dai Hō Co., Ltd. and registered a patent for the soil pressure shield method
From 1987 to 1990, the double-slab was revived and adopted in the foundation of the Rainbow Bridge.
Completion of the Rainbow Bridge and successful demonstration of the unmanned excavation method "DREAM"
During the Rainbow Bridge foundation from 1987 (Showa 62) to 1990 (Heisei 2), the double slab was revived.
Developed the unmanned keystone method "DREAM (Daiho Remote control Excavation Automatic Method)" and commenced the first DOT method project
Developed the DPLEX (eccentric multi-axial) method
Capital increased to 5 billion yen
Registered a patent for the DPLEX method (optional cross-section shield method)
The Rainbow Bridge was constructed in fiscal year 1993.
The Higashi-Kobe Great Bridge was constructed in fiscal year 1993.
Completion of the Rainbow Bridge, registered a patent for the DREAM method (new mechanical keystone unmanned system method)
Received the Tanaka Award in the Works Category from the Japan Society of Civil Engineers for the Rainbow Bridge
Received the National Order of the Ouissah (Madagascar)
The construction using the New Mechanical Casing method suffered almost no damage during the 1995 (Heisei 7) January 17 Hyogo Prefecture southern earthquake.
During the construction of the Tohoku Expressway Maebuchi River Bridge (lower section) from 1997 to 1999, we renewed the traditional Daifuku-style New Mechanical Casing Method and combined it with a new technology developed by our company, resulting in the "New Daifuku-style New Mechanical Casing Method" (currently known as the New DREAM method), which was adopted.
Tōhoku Chūkan Expressway Mabuigawa Bridge construction adopts the New Daido-style Newmatic Keason method
During the construction of the Tohoku Expressway Maebuchi River Bridge (lower section) from 1997 (Heisei 9) to 1999 (Heisei 11), the "New Daido-style New Mechanical Casing method"—a renewal of the conventional method—was adopted.
The Shiratori Great Bridge was constructed in fiscal year 1998.
Patent registration of the RUP method
50th anniversary, Hakutori Bridge Civil Engineering Society Award Tanaka Award Work Category, patent registration of the J-DPLEX shield method
In 2001 (Heisei 13), Patent No. 3470894 "New Mechanical Casing" was filed.
Patent registration of the DAPPI method
The Kitakami Great Bridge was constructed in fiscal year 2003.
Patent registration of the New DREAM method
Patent registration of the New DREAM method
Kitaoka Bridge Civil Engineering Society Award, Tanaka Award – Private construction boom leading to increased residential and office building projects; the "Mud Compression Shield Method" achieved over 1,000 projects, accounting for 70% of national shield projects.
Patent registration of the reversed left-right layout for underground road tunnels and the DRES method
Kitaoka Bridge Civil Engineering Society Award Tanaka Award Work Category, mud compression shield method construction record surpasses 1,000 cases
In 2006, the company undertook the "Comprehensive Growth Focus Area Ehola Port Construction Works" (Ehola Port Project). The project involved building a large port with a 17.4m deep seawall in Garrison Bay to ship titanium ore from the Fordfan area in southeastern Madagascar. The seawall design and construction phase lasted only 1,000 days, a challenging task that was completed on schedule.
Patent registration of the clip-type cover plate
Completed construction of the Port of Ehoara in Madagascar and received the "Project Excellence Award" from the American Society of Civil Engineers.
Patent registration of the DEFIMA method
Patent registration of the DASH method
The Yabe River Great Bridge was constructed in fiscal year 2008.
Patent registration of the DEFIMA method and DASH method.
60th anniversary – Yabegawa Bridge Civil Engineering Society Award, Tanaka Award – Madagascar Republic "Ehola Port Project" received the 2010 COPRI (Coastal, Ocean, Port, and River Society) Project Excellence Award
Completion of a deep vertical shaft using a double-slab pneumatic caisson method – The NewDREAM method was employed for remote-operated, unmanned excavation and atmospheric-pressure maintenance of the excavator, significantly reducing high-pressure work for operators and preventing high-pressure hazards. Post-sinking soil bearing capacity tests were also conducted unmanned, confirming ground strength and completing the deep shaft.
60th anniversary of establishment, Tanaka Award for the Yabegawa Great Bridge Civil Engineering Society, and the Ehoara Port Project received the "Project Excellence Award" from COPRI in the United States.
Patent registration of the Anchor Casing method
Patent registration of the Anker Kason method.
Great East Japan Earthquake
Entered the village after six days and began restoration work on the Tanobata Village, which has long been involved in harbor maintenance. Mobilized support staff and alumni from all over the country to the Tohoku branch. With the cooperation of partner companies nationwide, engaged in restoration and reconstruction work.
Patent registration of the RECC method
Capital increase to 6.3 billion yen
Review of the personnel system and promotion of women's participation. In the construction industry, long-term declines in public investment and the economic downturn caused by the Lehman Shock have led to a reduction in hiring. As demand for disaster reconstruction and the Olympic and Paralympic Games grew, a shortage of engineers emerged. Daikyo Construction strengthened recruitment by separating the HR department from general affairs in 2015. It continues activities such as internships and work experience to give people a sense of the workplace atmosphere. Recruitment plans have also been revised to hire about 40 new graduates each year regardless of economic conditions, addressing the imbalance in employee composition. In 2006, Daikyo Construction significantly changed its personnel system, introducing a promotion system based on qualifications and abilities. Female engineers have gradually increased in number since 2012, and there are women currently working as site supervisors.
Capital increase to 9.0 billion yen
Revision of the personnel system and promotion of women's empowerment, capital increased to 9 billion yen.
The Konanama Marine Bridge was constructed in fiscal year 2017.
Koyanami Marine Bridge – Civil Engineering Society Award, Tanaka Award for Design
"Hitachinaka Promotion Office" received the 29th Kurose Award from the Japan Promotion Technology Association in the construction category
Aiming to expand equipment capable of handling diverse new mechanical casing work, the "New Central Equipment Center" was constructed
Tanaka Award for the Kominami Marine Bridge Civil Engineering Society, received the Kurose Award, and construction of a new Central Equipment Center for equipment expansion.
70th Anniversary of Founding
Completion of the renewal work on the headquarters building (70th anniversary project)
70th anniversary of founding, completion of headquarters building renewal.
Establishment of a new technology research institute for the development of new technologies
Capital increase to 10.5 billion yen
Establishment of a new technology research institute and, based on achievements of earthquake-resistant structures, began new technology development.
"UNDER RIVER", a project promoting underground storage facilities to protect the city from flooding caused by intense rainfall
Produced a concept video and special website for the underground storage facility "UNDER RIVER."
Transition to the Tokyo Stock Exchange Prime Market
Capital increase to 30.7 billion yen
Signed a capital and business alliance agreement with Aso Co., Ltd.
Transitioned to the Prime market of the Tokyo Stock Exchange, increased capital to 30.7 billion yen, and signed a capital and business alliance agreement.
Capital reduction to 10.0 billion yen
Transition to the Tokyo Stock Exchange Standard Market
Reduced capital to 10 billion yen and moved to the Standard market of the Tokyo Stock Exchange.
Signed a business alliance agreement with Fuji P.S. Co., Ltd.
§07
News
19 ARTICLES
Exhibition at the 2026 Kanto Construction Technology Expo
Daifuku Construction exhibited at the "Construction Technology Expo 2026 Kanto" held on October 20-21, 2026, showcasing advanced technologies in civil engineering and architecture. Approximately 400 visitors attended the booth over the two days. In the civil engineering section, a corner allowed visitors to experience the automated construction technology of the Newmatic Caisson method via VR, and panels displayed various construction methods. The exhibition is also available online until 5:00 p.m. on November 27.
Archive Video of Taiho Construction's Presentation at Nikkei-TSE IR Fair 2026
Taiho Construction Co., Ltd. has published an archive video of its company presentation at the Nikkei-TSE IR Fair held on September 30, 2026.
Taiho Construction Promotes Employee Health Management
Taiho Construction Co., Ltd. announced initiatives related to employee health management on September 28, 2026. Although details were not provided, the announcement indicates that the company places importance on employee health and well-being.
Taiho Construction joins Shinkawa 1-chome Higashichokai summer festival
Taiho Construction Co., Ltd. took part in the summer festival hosted by the Shinkawa 1-chome Higashichokai neighborhood association.
President Masuda Pays Courtesy Visit to Embassy of Madagascar in Japan
President Masuda of Taiho Construction Co., Ltd. visited the Embassy of the Republic of Madagascar in Japan to pay a courtesy call. They discussed economic cooperation between the two countries and potential future collaboration.
Certification of 'Kurumin' based on the Next Generation Development Support Measures Promotion Law
Daito Construction Co., Ltd. obtained the 'Kurumin' certification based on the Next Generation Development Support Measures Promotion Law on August 3, 2026. This was recognized as a company committed to creating a work-friendly environment.
Daifuku Construction Exhibits at Nikkei & Tokyo Stock Exchange IR Fair 2026
Daifuku Construction Co., Ltd. will exhibit at the Nikkei & Tokyo Stock Exchange IR Fair 2026, held on July 24, 2026. The company will showcase its construction business and technology research institute initiatives, highlighting its contribution to a sustainable society.
Participation in International Exchange Program in Conjunction with Visit to Takaishi City
Daito Construction Co., Ltd. participated in the international exchange program of Takaishi City in conjunction with the visit of the ambassador of Madagascar and Comoros to Takaishi City.
President Patrol Conducted in Alignment with National Safety Week
Daifuku Construction conducted a patrol by the president at the site in line with National Safety Week to enhance safety awareness.
Daito Construction Donates Beverages to Minna no Shokudo
Daito Construction Co., Ltd. provided beverages to Minna no Shokudo in Chuo Ward, as part of the 'Kachidoki Edamame Project'.
§08
Public records
GOV
National Tax Agency basic information3010001034869
Source: National Tax Agency Corporate Number Publication Site, basic three items
Trade name
大豊建設株式会社
Trade name (kana)
ダイホウケンセツ
Name in English
Corporation type
301
Address
〒104-0033 東京都中央区新川1丁目24番4号
Postal code
1040033
Prefecture code
13
City code
102
Address outside Japan
Prefecture in English
City in English
Address outside Japan in English
Corporate number assignment date
2015-10-05
Update date
2018-04-10
Change date
2015-10-05
Registry closure date
Reason for registry closure
Successor corporate number
Details of the change
Latest record
1
Excluded from search
0
Processing type
01
Correction type
1
Trade name image ID
Address image ID
Sequence number
1569059
METI gBizINFO3010001034869
Source: gBizINFO (Ministry of Economy, Trade and Industry)