Constructed No.1 continuous casting machine in Nishijima Works.
Steel producing bases were organized into three: Osaka, Tokyo and Amagasaki Works.
Merged with Otani Jukogyo Co., Ltd.; changed company name to Godo Steel, Ltd.; Steel producing bases were organized into three: Osaka, Tokyo and Amagasaki Works.
Established Himeji Works as the fourth steel producing base.
Merged with Japan Iron‐Sand Steel Co., Ltd. and Koto Seiko Co., Ltd. to establish Himeji Works as the fourth steel producing base.
Closed Amagasaki Works.
昭和57年2月:大阪製造所第二連続鋳造設備を新設
Constructed No. 2 continuous casting machine in Osaka Works.
昭和55年3月:尼崎製造所を閉鎖
Replaced wire rod rolling mill in Osaka Works with new mill.
昭和57年4月:大阪製造所線材圧延設備を更新
昭和59年3月:東京製造所を閉鎖
Constructed new 70 ton electric furnace in Osaka Works.
Closed Tokyo Works.
Constructed new 70 ton electric furnace and No. 3 continuous casting machine in Osaka Works.
昭和59年12月:大阪製造所に70トン電気炉を新設
Constructed No. 3 continuous casting machine in Osaka Works.
Steel production bases were integrated into three: Osaka, Himeji, and Funabashi Works.
平成3年4月:船橋製鋼株式会社を合併、大阪、姫路、船橋の3製造所体制となる
Merged with Funabashi Seiko Co., Ltd. to integrate steel production bases into three: Osaka, Himeji and Funabashi Works.
No. 2 blast furnace in Osaka Works ceased operation.
本社を大阪市西淀川区西島へ移転しました。
平成10年9月:大阪製造所第二高炉休止
Three Works obtained ISO9001 certification.
平成10年7月:本社を大阪市西淀川区西島に移転
Ceased operating steel bar production line in Osaka Works.
平成13年7月:本社を大阪市北区堂島浜(東洋紡ビル)に移転
本社を大阪市北区土師浜(東洋ビル)へ移転しました。
Moved head office to Dojimahama, Kita-ku, Osaka (Toyobo Building)
Cooperative sales company jointly with Tokyo Tekko Co., Ltd.
平成14年2月:東京鐵鋼と共同販売会社東京デーバースチール設立
Established cooperative sales company, Tokyo D・B Steel Co., Ltd. jointly with Tokyo Tekko Co., Ltd.
平成15年11月:株式会社メタル・ストックを設立
Established Metal Stock Co., Ltd.
Three Works obtained ISO14001 certification.
Established Metal Stock Co.,Ltd.
平成16年9月:三興製鋼株式会社と業務提携
Formed business alliance with Sanko Seiko Co., Ltd.
Replaced rolling mill in Funabashi Works with new mill.
Became affiliated company, accounted for by equity method.
平成19年6月:新日本製鐵株式会社(現・日本製鉄)と提携強化、持分適用会社となる
Strengthened collaboration with Nippon Steel Corporation; became its affiliated company, accounted for by equity method.
Strengthened collaboration with Nippon Steel Corporation.; became its affiliated company, accounted for by equity method.
平成19年7月:東京営業所を東京都千代田区丸の内に移転
Moved Tokyo Office to Marunouchi, Chiyoda-ku, Tokyo.
平成19年8月:共英製鋼株式会社と株式相互保有
Held shares mutually with Kyoei Steel, Ltd.
Majority owned subsidiary.
平成19年12月:三星金属工業株式会社の株式を取得(子会社化)
Acquired shares of Mitsuboshi Metal Industry Co., Ltd. (as a majority owned subsidiary).
Tokyo D・B Steel Co., Ltd. - dissolution.
Constructed new direct rolling (DR) in Funabashi Works.
平成22年9月:大阪製造所棒鋼工場を休止
平成25年7月:東京デーバースチール株式会社解散
Tokyo D・B Steel Co., Ltd. - dissolution
Reinforcement and completion of the auditor system.
平成27年6月:執行役員制度の導入、監査(役)体制の充実・強化
Introduction of executive officer system; Reinforcement and completion of the auditor system.
平成27年7月:連結子会社三星金属工業株式会社の完全子会社化
Consolidated subsidiary Mitsuboshi Metal Industry Co., Ltd. became complete subsidiary.
平成28年3月:株式会社トーカイ完全子会社化
TOKAI STEEL CORPORATION became complete subsidiary.
By tender offer.
平成31年3月:朝日工業株式会社を株式公開買付けにより連結子会社化
Asahi Industries Co., Ltd. became a consolidated subsidiary by tender offer.
Asahi Industries Co., Ltd. became a consolidated subsidiary by tender offer
Jointly with Asahi Industries Co., Ltd.
令和1年10月:朝日工業株式会社と共同で販売会社関東デーバースチール株式会社を設立
Established cooperative sales company, Kanto D-Bar Steel Corporation, jointly with Asahi Industries Co., Ltd.
Established cooperative sales company, Kanto D-Bar Steel Corporation. jointly with Asahi Industries Co., Ltd.
令和4年8月:船橋製造所ダイレクト圧延(DR)設備新設
(JP Tower Osaka)
令和6年12月:本社を大阪市北区梅田(JPタワー大阪)に移転
本社を大阪市北区梅田(JPタワー大阪)へ移転しました。
Moved head office to Umeda , Kita-ku, Osaka : (JP Tower Osaka).
令和7年6月:合同デーバーエンジニアリング株式会社を完全子会社化
Godo D-Bar Engineering Corporation became complete subsidiary.